Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Thermax Limited Team. If you also belong to the team, you can get access from here

Thermax Limited Verified Tick

Compare button icon Compare button icon Compare
4.2

based on 3.2k Reviews

Filter interviews by

Thermax Limited Control Room Engineer Interview Questions, Process, and Tips

Updated 17 Jul 2024

Top Thermax Limited Control Room Engineer Interview Questions and Answers

View all 16 questions

Thermax Limited Control Room Engineer Interview Experiences

7 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jun 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Working pr of steam in past company?
  • Ans. 

    I have experience working with steam in my past company.

    • Operated and maintained steam control systems

    • Monitored steam pressure and temperature

    • Performed regular inspections and maintenance on steam equipment

    • Troubleshooted and resolved steam-related issues

    • Ensured compliance with safety regulations and protocols

  • Answered by AI
  • Q2. Which type of turbine in past company?
  • Ans. 

    The type of turbine used in my past company was a gas turbine.

    • Gas turbine was used in my past company.

    • Gas turbines are commonly used in power generation and industrial applications.

    • Gas turbines operate by burning fuel to generate high-pressure gas, which then drives a turbine to produce electricity or mechanical power.

  • Answered by AI
  • Q3. Which type of boiler in past company?
  • Ans. 

    The type of boiler in my past company was a high-pressure steam boiler.

    • The boiler in my past company was a high-pressure steam boiler.

    • It was used to generate steam for various industrial processes.

    • The boiler had a capacity of 10,000 pounds of steam per hour.

    • It was equipped with safety features such as pressure relief valves and temperature controls.

    • Regular maintenance and inspections were conducted to ensure its safe a

  • Answered by AI
  • Q4. Which type of Oil used in turbine?
  • Ans. 

    The type of oil used in turbines is typically turbine oil.

    • Turbine oil is specifically designed to meet the lubrication requirements of turbines.

    • It has excellent thermal stability and oxidation resistance.

    • Turbine oil helps reduce friction and wear in the turbine's moving parts.

    • It also provides cooling and helps remove contaminants from the system.

    • Different types of turbine oils are available, such as mineral-based, synt

  • Answered by AI
Round 3 - Technical 

(1 Question)

  • Q1. Types of work permit?
  • Ans. 

    There are various types of work permits depending on the country and purpose of employment.

    • Temporary work permits

    • Permanent work permits

    • Seasonal work permits

    • Student work permits

    • Intra-company transfer work permits

    • Skilled worker permits

    • Business visit permits

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I like this type of interview. My Performance is increasing step by step.

Control Room Engineer Interview Questions & Answers

user image Kanhaiya Maddheshiya

posted on 20 Jun 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. If in back pressure turbine when inlet flow 40TPH but outlet flow 37TPH exuast then
  • Ans. 

    The back pressure turbine is experiencing a flow imbalance between the inlet and outlet, resulting in a lower outlet flow than the inlet flow.

    • Possible causes could include a restriction in the turbine outlet, leakage in the system, or incorrect measurement of flow rates.

    • Check for any blockages or obstructions in the turbine outlet that may be causing the flow imbalance.

    • Verify the accuracy of the flow measurement device

  • Answered by AI

Control Room Engineer Interview Questions Asked at Other Companies

Q1. How many percentage setting line safety valve.
Q2. Explain about steam,water, flue gas,ash handling, Fuel handling s ... read more
Q3. Which type of Oil used in turbine?
Q4. What is basic of Boiler and it's purpose in Industrial usage?
Q5. Which type of turbine in past company?
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(7 Questions)

  • Q1. How many types of tube mstterls.
  • Ans. 

    There are several types of tube materials used in various industries.

    • Common tube materials include steel, copper, aluminum, and plastic.

    • Steel tubes are often used in construction and industrial applications due to their strength and durability.

    • Copper tubes are commonly used in plumbing and HVAC systems for their excellent heat transfer properties.

    • Aluminum tubes are lightweight and corrosion-resistant, making them suita...

  • Answered by AI
  • Q2. Types of tubes mstterls
  • Ans. 

    Types of tubes materials

    • There are various materials used for tubes, including metals, plastics, and ceramics.

    • Metal tubes are commonly made from stainless steel, copper, or aluminum.

    • Plastic tubes can be made from materials like PVC, polyethylene, or polypropylene.

    • Ceramic tubes are often used in high-temperature applications and can be made from materials like alumina or zirconia.

    • The choice of tube material depends on fa...

  • Answered by AI
  • Q3. How many percentage setting line safety valve.
  • Ans. 

    The percentage setting of a line safety valve depends on the specific system and its requirements.

    • The percentage setting is determined by the pressure drop across the valve and the required flow rate.

    • Typically, line safety valves are set between 10-20% above the system's operating pressure.

    • However, this can vary depending on the specific system and its requirements.

    • It is important to ensure that the valve is set correc...

  • Answered by AI
  • Q4. Desuper heating line are use .
  • Ans. Permary superheter outlet and SSH inlet
  • Answered Anonymously
  • Q5. How many tonn flow attemper flow
  • Ans. 

    The question is asking about the tonnage flow rate of the attemper flow.

    • The tonnage flow rate refers to the amount of material or substance flowing through a system per unit of time.

    • The attemper flow is a term used in control room engineering to describe the flow of a cooling medium, such as water, to regulate temperature.

    • To answer the question, specific data on the attemper flow rate in tons would be required.

  • Answered by AI
  • Q6. Interlocking of boiler
  • Ans. 

    Interlocking of boiler is a safety mechanism that prevents unsafe conditions in the boiler.

    • Interlocking ensures that all safety devices are in place and functioning properly before the boiler can start.

    • It also prevents the boiler from starting if any of the safety devices fail or malfunction.

    • Interlocking can be achieved through electrical or mechanical means.

    • Examples of interlocking devices include pressure switches, t...

  • Answered by AI
  • Q7.  pH value in feed pump and Boiler.
  • Ans. 

    pH value is critical in feed pump and boiler to maintain water quality and prevent corrosion.

    • pH value in feed pump should be between 7.5 to 9.5 to prevent corrosion and scaling

    • pH value in boiler should be between 10.5 to 12.0 to prevent acidic corrosion

    • pH value can be controlled by adding chemicals like sodium hydroxide or sulfuric acid

    • Regular monitoring and adjustment of pH value is necessary to ensure efficient opera

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Many technical interview in THERMAX LTD. Good experience in interview
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Feed water chemistry, Boiler operation parameters, Tripping value, emergency handling, Boiler lightup, Situational analysis

Thermax Limited interview questions for designations

 Control & Instrumentation Engineer

 (1)

 Mechanical Engineer

 (6)

 Electrical Engineer

 (6)

 Service Engineer

 (3)

 Production Engineer

 (3)

 Shift Engineer

 (3)

 Junior Engineer

 (2)

 Quality Engineer

 (2)

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. What’s your weakness? What’s motivates you?
  • Q2. Tell me about your self without taking your name And the things? Through you will be a know

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and calm!
Just listen the interviewer and reply with taking your time and don’t try to be oversmart if your don’t know the answer just reply sorry! In of saying wrong

Get interview-ready with Top Thermax Limited Interview Questions

I applied via Naukri.com and was interviewed in Nov 2021. There were 2 interview rounds.

Round 1 - HR 

(4 Questions)

  • Q1. Why are you looking for a change?
  • Q2. What are your salary expectations?
  • Q3. What is your family background?
  • Q4. Share details of your previous job.
Round 2 - Technical 

(2 Questions)

  • Q1. Turbine rolling procedure?
  • Ans. 

    Turbine rolling procedure is a process of slowly rotating the turbine to check for any abnormalities before starting it.

    • The turbine is rotated at a slow speed to check for any vibrations or unusual noises.

    • The rolling procedure is done to ensure the turbine is in good condition before starting it.

    • The procedure is usually done by the control room engineer or the turbine operator.

    • If any abnormalities are detected during t...

  • Answered by AI
  • Q2. Emergency handling of turbine?
  • Ans. 

    Emergency handling of turbine involves immediate shutdown and isolation of the affected equipment.

    • Initiate emergency shutdown procedure

    • Isolate the affected equipment

    • Notify relevant personnel

    • Investigate the cause of the emergency

    • Implement corrective actions

    • Resume normal operations only after ensuring safety

    • Regularly conduct emergency drills to ensure preparedness

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Practise answering the most commonly asked interview questions and have questions of your own ready to ask.

Interview Questionnaire 

3 Questions

  • Q1. Boiler light up procedure .
  • Ans. 

    The boiler light up procedure is the process of starting and igniting a boiler to generate steam.

    • Ensure all safety measures are in place before starting the procedure.

    • Open the boiler's fuel and air supply valves.

    • Purge the boiler of any remaining gases.

    • Ignite the pilot burner or spark igniter.

    • Monitor the flame and adjust fuel and air flow as needed.

    • Gradually increase the boiler's load and steam pressure.

    • Perform necessar...

  • Answered by AI
  • Q2. Emergencies You face in a Thermal power plant
  • Ans. 

    Emergencies in a thermal power plant can include fires, equipment failures, and electrical faults.

    • Fires can occur due to fuel leaks or electrical malfunctions.

    • Equipment failures can lead to shutdowns or accidents.

    • Electrical faults can cause power outages or damage to equipment.

    • Other emergencies may include steam leaks, chemical spills, or worker injuries.

  • Answered by AI
  • Q3. Boiler water parameters

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Dec 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Work related questions and previous company's your roles and responsibilities

Thermax Limited Interview FAQs

How many rounds are there in Thermax Limited Control Room Engineer interview?
Thermax Limited interview process usually has 2 rounds. The most common rounds in the Thermax Limited interview process are Technical, Resume Shortlist and HR.
How to prepare for Thermax Limited Control Room Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Thermax Limited. The most common topics and skills that interviewers at Thermax Limited expect are Power Plant, Boiler, Control Room, Turbine and thermal power plant.
What are the top questions asked in Thermax Limited Control Room Engineer interview?

Some of the top questions asked at the Thermax Limited Control Room Engineer interview -

  1. How many percentage setting line safety val...read more
  2. Which type of Oil used in turbi...read more
  3. Which type of turbine in past compa...read more

Tell us how to improve this page.

People are getting interviews through

based on 2 Thermax Limited interviews
Job Portal
50%
50% candidates got the interview through other sources.
Moderate Confidence
?
Moderate Confidence means the data is based on a sufficient number of responses received from the candidates

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 418 Interviews
Cummins Interview Questions
4.3
 • 228 Interviews
ABB Interview Questions
4.1
 • 224 Interviews
John Deere Interview Questions
4.1
 • 220 Interviews
Caterpillar Inc Interview Questions
4.3
 • 168 Interviews
Tata Power Interview Questions
4.0
 • 156 Interviews
Blue Star Interview Questions
4.1
 • 147 Interviews
Voltas Interview Questions
4.0
 • 119 Interviews
BHEL Interview Questions
4.2
 • 103 Interviews
View all
Thermax Limited Control Room Engineer Salary
based on 186 salaries
₹2 L/yr - ₹7 L/yr
32% less than the average Control Room Engineer Salary in India
View more details

Thermax Limited Control Room Engineer Reviews and Ratings

based on 56 reviews

4.3/5

Rating in categories

4.4

Skill development

4.0

Work-Life balance

3.9

Salary & Benefits

4.5

Job Security

4.1

Company culture

3.4

Promotions/Appraisal

3.9

Work Satisfaction

Explore 56 Reviews and Ratings
Shift Incharge
304 salaries
unlock blur

₹2.7 L/yr - ₹9.9 L/yr

Assistant Manager
283 salaries
unlock blur

₹5.8 L/yr - ₹16 L/yr

Electrical Engineer
250 salaries
unlock blur

₹2 L/yr - ₹7.2 L/yr

Safety Officer
201 salaries
unlock blur

₹2.2 L/yr - ₹8.8 L/yr

Senior Executive
192 salaries
unlock blur

₹4.7 L/yr - ₹12.5 L/yr

Explore more salaries
Compare Thermax Limited with

Kirloskar Brothers

3.9
Compare

BHEL

4.2
Compare

Siemens

4.1
Compare

Larsen & Toubro Limited

4.0
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview