Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Thermax Limited Team. If you also belong to the team, you can get access from here

Thermax Limited Verified Tick

Compare button icon Compare button icon Compare
4.2

based on 3.2k Reviews

Filter interviews by

Thermax Limited Senior Construction Manager Interview Questions, Process, and Tips

Updated 24 Dec 2024

Thermax Limited Senior Construction Manager Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Dec 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Efficiency calculation of fired boilers.
  • Ans. 

    Efficiency of fired boilers can be calculated by dividing the energy output by the energy input.

    • Efficiency = (Energy output / Energy input) * 100%

    • Energy output can be measured in terms of steam production or heat transfer to water

    • Energy input is the fuel energy input to the boiler

    • Efficiency can be improved by optimizing combustion, insulation, and heat recovery systems

  • Answered by AI
  • Q2. Heat rate of turbine.
  • Ans. 

    The heat rate of a turbine is a measure of how efficiently it converts fuel into electricity.

    • Heat rate is typically measured in British thermal units (BTUs) per kilowatt-hour (kWh).

    • A lower heat rate indicates higher efficiency, as less fuel is needed to generate the same amount of electricity.

    • Factors affecting heat rate include turbine design, operating conditions, and maintenance practices.

    • For example, a combined cycl...

  • Answered by AI
  • Q3. Fire tube and water tube boilers
  • Q4. Bi drum boiler erection sequence
  • Ans. 

    The erection sequence of a bi drum boiler involves several key steps to ensure proper installation and functionality.

    • Start by preparing the foundation for the boiler to ensure stability and support.

    • Next, assemble the lower drum and connect it to the foundation securely.

    • Then, install the upper drum and connect it to the lower drum using appropriate fittings.

    • After that, install the boiler tubes and headers to facilitate ...

  • Answered by AI
  • Q5. Safety interlock of fired boilers.
  • Ans. 

    Safety interlock of fired boilers is a crucial system that ensures safe operation by preventing unsafe conditions.

    • Safety interlock system is designed to shut down the boiler if unsafe conditions are detected, such as low water level or high pressure.

    • Interlocks may include sensors, alarms, and automatic shutdown mechanisms.

    • Regular maintenance and testing of safety interlock systems are essential to ensure they function ...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Thermax Limited Senior Construction Manager interview:
  • IBR regulations
Interview preparation tips for other job seekers - Be specific and true to the resume submitted.

Interview questions from similar companies

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Personal details and about mechanical construction
Round 3 - Technical 

(1 Question)

  • Q1. Related to job profile

Interview Preparation Tips

Interview preparation tips for other job seekers - Read to regarding resume and related to job profile

Thermax Limited Interview FAQs

How many rounds are there in Thermax Limited Senior Construction Manager interview?
Thermax Limited interview process usually has 1 rounds. The most common rounds in the Thermax Limited interview process are Technical.
What are the top questions asked in Thermax Limited Senior Construction Manager interview?

Some of the top questions asked at the Thermax Limited Senior Construction Manager interview -

  1. Efficiency calculation of fired boile...read more
  2. Bi drum boiler erection seque...read more
  3. Safety interlock of fired boile...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 418 Interviews
Cummins Interview Questions
4.3
 • 228 Interviews
ABB Interview Questions
4.1
 • 224 Interviews
John Deere Interview Questions
4.1
 • 220 Interviews
Caterpillar Inc Interview Questions
4.3
 • 168 Interviews
Tata Power Interview Questions
4.0
 • 156 Interviews
Blue Star Interview Questions
4.1
 • 147 Interviews
Voltas Interview Questions
4.0
 • 119 Interviews
BHEL Interview Questions
4.2
 • 103 Interviews
View all
Shift Incharge
304 salaries
unlock blur

₹2.7 L/yr - ₹9.9 L/yr

Assistant Manager
283 salaries
unlock blur

₹5.8 L/yr - ₹16 L/yr

Electrical Engineer
252 salaries
unlock blur

₹2 L/yr - ₹7.2 L/yr

Safety Officer
201 salaries
unlock blur

₹2.5 L/yr - ₹8.8 L/yr

Senior Executive
192 salaries
unlock blur

₹4.7 L/yr - ₹12.5 L/yr

Explore more salaries
Compare Thermax Limited with

Kirloskar Brothers

3.9
Compare

BHEL

4.2
Compare

Siemens

4.1
Compare

Larsen & Toubro Limited

4.0
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview