i
Thermax Limited
Filter interviews by
Bed coil leakages in AFBC boiler
Interlocks in a boiler turbine are safety mechanisms that prevent unsafe conditions and protect equipment.
Interlocks ensure proper sequencing of operations in the boiler turbine
They prevent unsafe conditions such as overpressure, low water level, or flame failure
Examples of interlocks include low water level shutdown, high steam pressure trip, and flame failure detection
Interlocks help protect equipment from damage and
I appeared for an interview before Feb 2023.
Top trending discussions
posted on 5 Dec 2022
I applied via Naukri.com and was interviewed before Dec 2021. There were 2 interview rounds.
posted on 21 Apr 2022
I appeared for an interview in Sep 2021.
I applied via Campus Placement and was interviewed before Feb 2023. There were 2 interview rounds.
The questions cover topics related to turbochargers, IC engines, engine parts, manufacturing processes, management skills, and interpersonal communication.
Turbocharger is a device that increases the efficiency and power output of an engine by forcing extra air into the combustion chamber.
IC engine works on the principle of internal combustion where fuel is burned inside the engine to produce power.
CI engine stands for ...
I applied via Company Website and was interviewed in Oct 2021. There was 1 interview round.
Motor and panel switchgear erection in oil and gas field
Experience in installation and maintenance of motor and panel switchgear in oil and gas field
Knowledge of safety regulations and procedures in hazardous environments
Ability to read and interpret technical drawings and schematics
Familiarity with testing and commissioning procedures
Experience in troubleshooting and resolving electrical issues
Examples: installation o...
Date of completion refers to the deadline or expected date of finishing a project or task.
It is important to set a realistic date of completion to ensure timely delivery of projects.
Factors such as available resources, team capacity, and project complexity should be considered when setting the date of completion.
Regular monitoring and tracking of progress can help ensure that the project is on track to meet the date of...
I applied via Naukri.com
Prepare for topics on current events, government regulations, corporate trends
Prepare for Management case study on complex problems, strategic issues
I applied via Referral and was interviewed before Jul 2021. There were 3 interview rounds.
Quantitative Aptitude, Numerical Ability, Synonym etc
Some of the top questions asked at the Thermax Limited Power Plant Manager interview for experienced candidates -
based on 2 interviews
Interview experience
Shift Incharge
313
salaries
| ₹2.6 L/yr - ₹8.9 L/yr |
Assistant Manager
272
salaries
| ₹5.8 L/yr - ₹16 L/yr |
Electrical Engineer
235
salaries
| ₹2.4 L/yr - ₹8.1 L/yr |
Senior Executive
209
salaries
| ₹4 L/yr - ₹11 L/yr |
Control Room Engineer
191
salaries
| ₹2.5 L/yr - ₹7 L/yr |
John Deere
Cummins
ABB
KONE