Boiler water parameters are crucial for efficient and safe operation of a power plant.
Boiler water parameters include pH level, conductivity, dissolved oxygen, and total dissolved solids (TDS).
Maintaining proper pH level helps prevent corrosion and scale formation.
Conductivity measurement indicates the level of impurities in the water.
Dissolved oxygen should be minimized to prevent corrosion.
TDS measurement helps monit...
Boiler efficiency can be calculated by measuring the heat input and heat output of the boiler.
Measure the fuel input and steam output of the boiler
Calculate the heat input by multiplying the fuel flow rate with the calorific value of the fuel
Calculate the heat output by multiplying the steam flow rate with the enthalpy of the steam
Divide the heat output by the heat input and multiply by 100 to get the boiler efficiency
...
Steam turbine bearing clearance is the gap between the bearing and the shaft.
Bearing clearance is important for proper lubrication and to prevent damage to the bearing and shaft.
Clearance can be adjusted by shimming or machining the bearing housing.
Clearance should be checked regularly and adjusted as needed to maintain optimal performance.
Excessive clearance can cause vibration and damage to the turbine.
Insufficient c...
Top trending discussions
I applied via Referral and was interviewed in Jul 2023. There were 4 interview rounds.
Gm to vp interview process
As per experience and previous background
Fully covered in Logistics
I appeared for an interview in Feb 2025, where I was asked the following questions.
P2P, or peer-to-peer, is a decentralized network model where participants interact directly without intermediaries.
P2P networks allow users to share files directly, e.g., BitTorrent for file sharing.
In finance, P2P lending platforms connect borrowers and lenders directly, like LendingClub.
P2P can also refer to cryptocurrency transactions, where users trade directly without banks.
Effective vendor payment management ensures timely payments, maintains relationships, and optimizes cash flow.
Establish clear payment terms: Define payment schedules and methods in contracts to avoid confusion.
Implement a tracking system: Use software to monitor invoices and payment statuses, ensuring no payments are missed.
Prioritize payments: Assess vendor importance and payment terms to prioritize critical suppliers...
I applied via Naukri.com and was interviewed in Sep 2022. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Sep 2022. There were 4 interview rounds.
Calculating a scheme involves determining the parameters and formulas used to allocate benefits or rewards.
Identify the key parameters of the scheme, such as performance metrics, eligibility criteria, and reward structure.
Determine the formula or method used to calculate the benefits or rewards based on the parameters.
Consider any variables or factors that may impact the calculation, such as bonuses, penalties, or adju...
Product launch can be done through various strategies like social media campaigns, influencer partnerships, and traditional advertising.
Utilize social media platforms to create buzz and engage with potential customers
Collaborate with influencers to reach a wider audience and gain credibility
Implement traditional advertising methods such as TV commercials, print ads, and billboards
Organize launch events or promotions to...
I applied via Naukri.com and was interviewed in Jul 2021. There were 2 interview rounds.
I applied via Referral and was interviewed before Aug 2023. There was 1 interview round.
Being publicly criticized by a senior manager during a team meeting
Senior manager criticized my work in front of colleagues
Felt embarrassed and demotivated
Learned to handle criticism constructively in the future
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM involves all employees in the maintenance process to prevent breakdowns and improve overall equipment efficiency.
It focuses on proactive maintenance, autonomous maintenance, and continuous improvement.
TPM aims to eliminate the 6 big losses in production: breakdowns, setup and adjustment, id...
I appeared for an interview before Nov 2022.
Behaviour
Awareness
based on 1 review
Rating in categories
Assistant Manager
14
salaries
| ₹5.1 L/yr - ₹10 L/yr |
Sales Executive
13
salaries
| ₹2.4 L/yr - ₹6.6 L/yr |
Area Sales Manager
12
salaries
| ₹8.8 L/yr - ₹13 L/yr |
Accounts Officer
12
salaries
| ₹4.2 L/yr - ₹6 L/yr |
Power Plant Manager
12
salaries
| ₹10.8 L/yr - ₹12.5 L/yr |
Varun Beverages
Hindustan Coca Cola Beverages
AB InBev India
Parle Agro