Upload Button Icon Add office photos

Filter interviews by

The Durgapur Projects Process Expert Interview Questions and Answers

Be the first one to contribute and help others!

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Basic aptitude questions

Round 2 - Coding Test 

Coding questions hard level like matrix etc

Interview Preparation Tips

Interview preparation tips for other job seekers - do study hard
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

1 hour duration, related financial crisis

I applied via Recruitment Consultant and was interviewed in May 2019. There were 3 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. What are the standards used for plant layout in refineries
  • Ans. 

    Standards for plant layout in refineries ensure safety, efficiency, and compliance with regulations.

    • Plant layout should prioritize safety and minimize the risk of accidents.

    • Efficiency is also important, with consideration given to the flow of materials and equipment.

    • Regulations and industry standards must be followed, such as those set by OSHA and API.

    • Examples of layout considerations include spacing between equipment,...

  • Answered by AI
  • Q2. What is the frequency on visiting Vendor Shops for expediting
  • Ans. 

    The frequency of visiting vendor shops for expediting depends on various factors such as project timelines, vendor reliability, and urgency of the situation.

    • The frequency of visiting vendor shops for expediting can vary from daily visits to weekly or monthly visits.

    • It depends on the project timelines and the urgency of the situation. If a project is running behind schedule, more frequent visits may be required to ensur...

  • Answered by AI
  • Q3. Have You worked in CDU-VDU unit?
  • Q4. What is DCU?
  • Ans. 

    DCU stands for Dublin City University, a university located in Dublin, Ireland.

    • DCU was established in 1980 and has over 17,000 students.

    • It offers a wide range of undergraduate and postgraduate courses in various fields such as business, engineering, science, arts, and humanities.

    • DCU is known for its innovative approach to education and research, and has partnerships with many leading companies and institutions.

    • Some not...

  • Answered by AI
  • Q5. Why it is called delayed?
  • Ans. 

    Delayed is called so because it refers to something that is postponed or occurs after the expected time.

    • The term 'delayed' is used to describe situations where there is a time lag or postponement.

    • It implies that something is not happening immediately or as scheduled.

    • Delays can occur due to various reasons such as technical issues, logistical problems, or unforeseen circumstances.

    • For example, a delayed flight refers to ...

  • Answered by AI
  • Q6. What happens at CDU-VDU?

Interview Preparation Tips

Interview preparation tips for other job seekers - Only one technical interview and final negotiation with HR

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed before Jan 2024.

Round 1 - Technical 

(4 Questions)

  • Q1. Drainage and filter layers
  • Q2. Limit of pile settlement for vertiload testing
  • Ans. 

    The limit of pile settlement for vertiload testing is typically determined by the project specifications and design requirements.

    • The limit of pile settlement can vary depending on the type of structure being supported and the soil conditions

    • Common limits for pile settlement range from 10mm to 25mm

    • Settlement limits may also be specified in terms of a percentage of the pile diameter

    • Exceeding the allowable settlement limi...

  • Answered by AI
  • Q3. IRC code for flexible pavement
  • Ans. 

    IRC code for flexible pavement design

    • IRC: Indian Roads Congress

    • Flexible pavement design is covered in IRC:37-2012

    • IRC:37-2012 provides guidelines for design, construction, and maintenance of flexible pavements

  • Answered by AI
  • Q4. Limit of pile shifting
  • Ans. 

    Pile shifting limit refers to the maximum allowable movement of piles during construction.

    • Pile shifting limit is typically specified in the project specifications or design drawings.

    • Exceeding the pile shifting limit can lead to structural instability and potential failure.

    • Monitoring equipment such as inclinometers or settlement gauges may be used to track pile movement.

    • Adjustments to construction methods or pile design...

  • Answered by AI
Round 2 - Group Discussion 
Pro Tip by AmbitionBox:
Don’t treat group discussions as an argument. Group discussion is about reaching a meaningful conclusion.
View all tips
Round 3 - HR 

(2 Questions)

  • Q1. Salary negotiation
  • Q2. Other facilities

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare of technical , Specifications, Material management and planning of work

I applied via Naukri.com and was interviewed before Nov 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Tell me something about your self
  • Q2. Why you are leaving the company
  • Q3. Why you are joining our group
Round 3 - Technical 

(2 Questions)

  • Q1. Tell me something about Ind AS 116
  • Ans. 

    Ind AS 116 is a new accounting standard for lease accounting.

    • Ind AS 116 replaces the previous standard Ind AS 17.

    • It requires lessees to recognize all leases on their balance sheet.

    • Lessees must also separate lease components from non-lease components.

    • It impacts financial statements, ratios, and covenants.

    • It became effective from April 1, 2019.

    • Example: A company leasing a building must recognize the lease liability and r

  • Answered by AI
  • Q2. Ask about Ind AS 109

Interview Preparation Tips

Interview preparation tips for other job seekers - If you want to join, GMR is known for cultural and values.

Manager Interview Questions & Answers

Tata Projects user image Niteenkumar Belkoniker

posted on 24 May 2024

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Background and qualifications
Round 2 - Technical 

(1 Question)

  • Q1. About experience
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
4-6 weeks
Result
Selected Selected

I was interviewed in Jan 2025.

Round 1 - One-on-one 

(3 Questions)

  • Q1. No proper interview ques
  • Q2. Ques asked depending on their mood
  • Q3. Waste and time consuming process
Round 2 - HR 

(2 Questions)

  • Q1. Outdated hr metrics
  • Q2. No structured ques..waste of time

Interview Preparation Tips

Interview preparation tips for other job seekers - KEEP AWAY FROM THIS UNPROFESSIONAL AND FAALTU COMPANY. DONT WASTE YOUR PRECIOUS TIME & CAREER IN SICH A SHI*TY COMPANY
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Nov 2024. There were 2 interview rounds.

Round 1 - Case Study 

Strike the workers to payment related

Round 2 - One-on-one 

(2 Questions)

  • Q1. Full knowledge by area
  • Q2. All time attend phone

Interview Preparation Tips

Topics to prepare for Tata Projects Team Lead interview:
  • Excel
Interview preparation tips for other job seekers - I have experience to strike
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Dec 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Technical questions about Civil Engineering
  • Q2. HR round was tough and grinding
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Assignment 

Aptitude test which goes nice and we done will and basic knowledge in excel and ms offcie tool

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 430 Interviews
Adani Power Interview Questions
3.9
 • 219 Interviews
ReNew Interview Questions
4.2
 • 87 Interviews
Vestas Interview Questions
4.2
 • 83 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
Jakson Group Interview Questions
4.2
 • 78 Interviews
View all
Assistant Mines Manager
8 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
7 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Manager – Electrical
5 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Manager
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Manager
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare The Durgapur Projects with

Tata Projects

4.2
Compare

Larsen & Toubro Limited

4.0
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview