Filter interviews by
I applied via Approached by Company and was interviewed in Sep 2022. There were 4 interview rounds.
Top trending discussions
posted on 24 Jul 2024
I applied via Approached by Company and was interviewed before Dec 2022. There were 2 interview rounds.
posted on 24 Jul 2024
I applied via Approached by Company and was interviewed in Nov 2023. There were 2 interview rounds.
The solar cell process involves the conversion of sunlight into electricity using semiconductor materials.
Solar cells are made of semiconductor materials, typically silicon.
The process starts with the absorption of sunlight by the solar cell.
The absorbed sunlight generates electron-hole pairs in the semiconductor material.
The electron-hole pairs are separated by the electric field within the solar cell.
The separated ch...
Gases and chemicals used in cell processes include oxygen, carbon dioxide, glucose, ATP, and enzymes.
Oxygen is used in cellular respiration to produce energy.
Carbon dioxide is a waste product of cellular respiration.
Glucose is a source of energy for cells.
ATP (adenosine triphosphate) is the energy currency of cells.
Enzymes are proteins that catalyze chemical reactions in cells.
SMART goals are specific, measurable, achievable, relevant, and time-bound.
Specific: Goals should be clear and well-defined.
Measurable: Goals should have a way to track progress and measure success.
Achievable: Goals should be realistic and attainable.
Relevant: Goals should be aligned with overall objectives and relevant to the individual or team.
Time-bound: Goals should have a deadline or timeframe for completion.
Examp...
I applied via Approached by Company and was interviewed before Dec 2022. There were 2 interview rounds.
based on 2 reviews
Rating in categories
Assistant Manager
447
salaries
| ₹5.4 L/yr - ₹16.7 L/yr |
Senior Engineer
327
salaries
| ₹3.5 L/yr - ₹10.7 L/yr |
Deputy Manager
252
salaries
| ₹6.6 L/yr - ₹21 L/yr |
Junior Engineer
192
salaries
| ₹2.8 L/yr - ₹6.5 L/yr |
Electrical Engineer
174
salaries
| ₹2.5 L/yr - ₹8 L/yr |
Tata Power
Azure Power
ReNew
Hero Future Energies