Round 1 - HR 

(2 Questions)

  • Q1. How WBSEDCL works
  • Ans. 

    WBSEDCL is a government-owned electricity distribution company in West Bengal, India.

    • WBSEDCL is responsible for distributing electricity to various parts of West Bengal.

    • It operates and maintains the electricity distribution network in the state.

    • WBSEDCL also handles billing, customer service, and other related activities.

    • The company aims to provide reliable and affordable electricity to the residents of West Bengal.

  • Answered by AI
  • Q2. Experience of previous jobs
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Define current.
  • Ans. 

    Current is the flow of electric charge in a circuit.

    • Current is measured in Amperes (A).

    • It is the rate of flow of electric charge through a conductor.

    • Current flows from the positive terminal to the negative terminal in a circuit.

    • There are two types of current - direct current (DC) and alternating current (AC).

  • Answered by AI
  • Q2. How calculate conductors dia.
  • Ans. 

    Conductors diameter can be calculated using the formula: diameter = sqrt((4 * area) / pi)

    • Calculate the area of the conductor (usually circular) using the formula: area = pi * (radius^2)

    • Determine the radius of the conductor

    • Use the formula: diameter = sqrt((4 * area) / pi) to calculate the diameter

  • Answered by AI

I applied via Company Website and was interviewed in Aug 2022. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Devlopment length,Is code, type of soil,piling process,road related questions, concrete test and compressive strength test and more quality related questions.

Interview Preparation Tips

Topics to prepare for Utility Powertech Civil Engineer interview:
  • Steel Structures
  • FGD civil engi
  • NTPC plant
Interview preparation tips for other job seekers - They asked me previous company experience and some information about IS Code.Always remember Your confidence must get your job.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is the process de-ashing the from esp to silo.
  • Ans. 

    De-ashing process from ESP to silo involves several steps.

    • The ash is collected in hoppers located at the bottom of the ESP.

    • The ash is then transported to the silo using a pneumatic conveying system.

    • The ash is stored in the silo until it can be disposed of properly.

    • Regular maintenance of the ESP and pneumatic conveying system is necessary to ensure efficient de-ashing.

    • Proper safety measures must be taken during the de-a

  • Answered by AI
  • Q2. What is the capacity of esp hoppers.
  • Ans. 

    The capacity of ESP hoppers varies depending on the size and model of the equipment.

    • ESP hoppers can range from a few hundred cubic feet to several thousand cubic feet in capacity.

    • The capacity can also depend on the type of material being collected in the hopper.

    • It is important to regularly monitor and maintain the hopper to prevent overfilling and potential equipment damage.

  • Answered by AI
Round 3 - One-on-one 

(1 Question)

  • Q1. I will pay you only this.

Interview Preparation Tips

Interview preparation tips for other job seekers - Worst things going inside the company they just making everyone life & growth in danger.

I applied via Campus Placement and was interviewed in Jul 2022. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Tell me about yourself , and why did you choose civil engineering
Round 2 - Technical 

(1 Question)

  • Q1. Some questions related to my internships, reinforcement details , and some related to rebars

Interview Preparation Tips

Topics to prepare for Assystem Graduate Engineer Trainee (Get) interview:
  • Reinforcement
  • Water Treatment Plant
Interview preparation tips for other job seekers - Be thorough with your internship works , and be strong with your basics, and the other thing is you must be very confident while answering

I applied via Company Website and was interviewed in Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Which method following in store
  • Ans. Material received & issue in system, documents verification,mis report, inventory management,
  • Answered Anonymously
  • Q2. Which system use in previous company?
  • Ans. 

    We used an ERP system called SAP in my previous company.

    • Previous company used SAP as the primary system.

    • SAP helped in streamlining business processes and improving efficiency.

    • It integrated various departments like finance, HR, and supply chain.

    • SAP provided real-time data and analytics for informed decision-making.

    • Employees were trained to use SAP for their respective roles.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Best policy & rools regulations,
Vision and mission are Great,
Work sop best policy

Interview Questionnaire 

8 Questions

  • Q1. What is energy?
  • Ans. 

    Energy is the ability to do work or cause change.

    • Energy can exist in many forms such as kinetic, potential, thermal, electrical, etc.

    • It is measured in joules or calories.

    • Energy cannot be created or destroyed, only converted from one form to another.

    • Examples of energy include the movement of a car, the heat from a fire, and the electricity powering a light bulb.

  • Answered by AI
  • Q2. What is consumption?
  • Ans. 

    Consumption refers to the amount of a resource used over a period of time.

    • Consumption can refer to the usage of electricity, water, gas, or other resources.

    • It is often measured in units such as kilowatt-hours or gallons.

    • Consumption can be influenced by factors such as population, climate, and lifestyle.

    • Monitoring consumption can help identify areas for conservation and efficiency improvements.

  • Answered by AI
  • Q3. How much power saving ?
  • Ans. 

    The power saving depends on the project and the implemented measures.

    • The power saving can range from a few percentage points to over 50% depending on the project.

    • The measures implemented can include using energy-efficient equipment, optimizing the design of the electrical system, and implementing renewable energy sources.

    • For example, a project that implements LED lighting and solar panels can achieve significant power ...

  • Answered by AI
  • Q4. How much we consume low power and better results ?
  • Ans. 

    Consuming low power can lead to better results in terms of energy efficiency and cost savings.

    • Using energy-efficient equipment and lighting can reduce power consumption while maintaining performance.

    • Implementing power management strategies such as turning off unused equipment can also help save energy.

    • Proper maintenance and regular inspections can ensure that equipment is running efficiently and not wasting energy.

    • Usin...

  • Answered by AI
  • Q5. What is the power projects aims?
  • Ans. 

    The power projects aims to generate, transmit and distribute electricity efficiently and sustainably.

    • To meet the growing demand for electricity

    • To reduce dependence on fossil fuels

    • To increase the use of renewable energy sources

    • To improve the reliability and quality of power supply

    • To minimize transmission and distribution losses

    • To promote energy conservation and efficiency

    • To ensure environmental sustainability

    • To support

  • Answered by AI
  • Q6. How minimise faults in GSS?
  • Ans. 

    Minimizing faults in GSS

    • Regular maintenance and inspection of equipment

    • Proper training of personnel

    • Implementation of safety protocols

    • Use of high-quality materials and equipment

    • Thorough testing and commissioning before operation

  • Answered by AI
  • Q7. How are better our life low consumption of power?
  • Ans. 

    Low power consumption leads to a better life in many ways.

    • Reduces electricity bills and saves money

    • Helps in conserving natural resources and reducing carbon footprint

    • Increases the lifespan of electronic devices

    • Reduces the risk of power outages and blackouts

    • Promotes sustainable living and a healthier environment

  • Answered by AI
  • Q8. What is power grid?
  • Ans. 

    Power grid is a network of electrical transmission lines, substations, transformers and generators that supply electricity to homes and businesses.

    • Power grid is a complex system of interconnected electrical components.

    • It includes power plants, transmission lines, substations, transformers, and distribution lines.

    • The grid is designed to deliver electricity from power plants to consumers.

    • It operates on a large scale, cov...

  • Answered by AI
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. How do you manage channel marketing?
  • Ans. 

    I manage channel marketing by developing strategies, analyzing data, and collaborating with cross-functional teams.

    • Developing and executing channel marketing strategies

    • Analyzing data to measure effectiveness and optimize campaigns

    • Collaborating with cross-functional teams to ensure alignment and maximize impact

    • Managing budgets and resources to achieve goals

    • Staying up-to-date with industry trends and best practices

    • Exampl...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared with subject knowledge. Company is open to hire good people.

I applied via Company Website and was interviewed in Oct 2021. There were 5 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. Why you are leaving your previous company ?
  • Ans. 

    Seeking new challenges and growth opportunities.

    • Looking for a company that aligns better with my career goals.

    • Desire to work on more complex projects.

    • Seeking a better work-life balance.

    • Company downsizing or restructuring.

    • Limited opportunities for advancement or professional development.

    • Relocation or personal reasons.

  • Answered by AI
  • Q2. Technical skill questions?
  • Ans. Need to know all testing about electrical equipment
  • Answered Anonymously
  • Q3. Testing about all electrical equipment ?
  • Q4. Relay testing questions?
  • Q5. Drwaing related questions?
  • Q6. CT knee point voltage

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be positive and confident own yourself and need to know all testing and erection related answers.

IT Solution Expert Interview Questions & Answers

Siemens Energy user image Anonymous

posted on 3 May 2022

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Questions related to the they’re hiring!
Round 3 - HR 

(1 Question)

  • Q1. General HR discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Knowledge comes through experience don’t rush!

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 422 Interviews
GMR Group Interview Questions
4.1
 • 80 Interviews
GAMMON INDIA Interview Questions
3.9
 • 29 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all

The Durgapur Projects Reviews and Ratings

based on 25 reviews

3.6/5

Rating in categories

3.9

Skill development

3.7

Work-life balance

3.7

Salary

3.4

Job security

3.8

Company culture

3.1

Promotions

3.8

Work satisfaction

Explore 25 Reviews and Ratings
Assistant Manager
7 salaries
unlock blur

₹8 L/yr - ₹12 L/yr

Assistant Mines Manager
7 salaries
unlock blur

₹8.5 L/yr - ₹11.5 L/yr

Manager – Electrical
5 salaries
unlock blur

₹18 L/yr - ₹22 L/yr

Manager
4 salaries
unlock blur

₹11 L/yr - ₹14 L/yr

Senior Manager
4 salaries
unlock blur

₹20 L/yr - ₹24 L/yr

Explore more salaries
Compare The Durgapur Projects with

Tata Projects

4.2
Compare

Larsen & Toubro Limited

4.0
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview