Texmaco Rail and Engineering Senior Billing Engineer Interview Questions and Answers

Updated 13 Mar 2024

Texmaco Rail and Engineering Senior Billing Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. What are deduction to be made in plastering ?
  • Ans. 

    Deductions in plastering include openings for doors and windows, electrical fixtures, and plumbing fixtures.

    • Deductions are made for openings such as doors and windows to ensure a clean finish.

    • Electrical fixtures such as switches and outlets require deductions to be made in plastering.

    • Plumbing fixtures like pipes and faucets also need to be accounted for in plastering deductions.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare IS 1200

Interview questions from similar companies

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical
Interview experience
2
Poor
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Referral and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. 1. Safety valve types and selection criteria 2. Thermowell Design concept 3. Diff. Pressure Type Flow meter concept and criteria 4. Cable construction details 5. Hook-Ups details
  • Q2. 1. Installation details 2. Flowmeter straigth lengths requirement

Interview Preparation Tips

Interview preparation tips for other job seekers - On which things you worked on , all basics and details things shall be clear.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. PAST EXPERIENCE QUESTIONS

Interview Preparation Tips

Topics to prepare for L&T Energy Hydrocarbon Senior Engineer interview:
  • Piping
Interview preparation tips for other job seekers - GET DETAILS OF CODES AND STANDARDS YOU USED IN WORK

Interview Questionnaire 

5 Questions

  • Q1. Seismic design of building, criteria, type of checks in building with respect to seismic, analysis approach
  • Q2. Pile and foundation detail, structural system in building, shear wall, dual system implications
  • Q3. Steel structure- Class of section, connection detail, slender member design criteria
  • Q4. Building irregularities type
  • Q5. Nature of scope of work performed, understanding of coordination approach, software knowledge
Interview experience
3
Average
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jun 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Process of Making Minor Bridge?
  • Ans. 

    The process of making a minor bridge involves planning, design, construction, and inspection.

    • 1. Planning phase involves determining the location, size, and type of bridge needed.

    • 2. Design phase includes creating detailed drawings and calculations for the bridge structure.

    • 3. Construction phase involves building the foundation, supports, and deck of the bridge.

    • 4. Inspection phase ensures the bridge meets safety and quali...

  • Answered by AI
  • Q2. How do you assure piling Point ?
  • Ans. 

    Piling point can be assured by conducting thorough soil investigation, using appropriate piling equipment, and monitoring the piling process.

    • Conduct soil investigation to determine soil conditions and suitability for piling.

    • Select appropriate piling equipment based on soil conditions and project requirements.

    • Monitor the piling process to ensure proper installation and alignment of piles.

    • Perform load tests on completed

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Why do you change your last Company?
  • Q2. What your salary Expectations ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident towards your Knowledge
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Execution of Elevated Viaduct (ROB) 6.2KM 1200 numbers pile (Friction & end Bearing Pile) Foundation ROB Pile Cap and Pier, PSC T-Type Pier Cap, Post Tensioning Girder,Bow string (ROB) structure box interc...
  • Ans. 

    The execution of an elevated viaduct involves various tasks such as pile foundation, pier construction, post-tensioning girders, and bridge structures.

    • Tasks include pile foundation construction for the viaduct, pier construction for support, post-tensioning of girders for strength, and bridge structure assembly.

    • Activities also involve conducting load tests, NDT tests, deflection tests, and steel reconciliation for qual...

  • Answered by AI
  • Q2. Preparation of the planning of site execution day by day as per available drawing. Planning & indenting daily requirement of Labour, Construction Machinery, and Materials &Formwork. Organizing various dail...

Interview Preparation Tips

Interview preparation tips for other job seekers - I certify also that all relative document pertaining my qualifications areon my file and is readily accessible in the case needed further.

I applied via Company Website and was interviewed in Sep 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. Errection and maintenance related
  • Q2. Installation of b/plant, tower crain etc
  • Q3. Aggregate processing plant, screen house, primary crusher, secondary crusher, conveyor belt errection,fluit coupling repairing work

Interview Preparation Tips

Interview preparation tips for other job seekers - All over India telephonic or walk-in interview please call my no for interview
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. What are your strengths and weaknesses?
Round 3 - Technical 
Round 4 - Technical 
Round 5 - Technical 
Round 6 - One-on-one 

Interview Preparation Tips

Interview preparation tips for other job seekers - Reference not accept

Texmaco Rail and Engineering Interview FAQs

How many rounds are there in Texmaco Rail and Engineering Senior Billing Engineer interview?
Texmaco Rail and Engineering interview process usually has 1 rounds. The most common rounds in the Texmaco Rail and Engineering interview process are Technical.

Tell us how to improve this page.

Texmaco Rail and Engineering Senior Billing Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 120 Interviews
Apco Infratech Interview Questions
3.7
 • 117 Interviews
Bechtel Interview Questions
4.0
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 61 Interviews
Wood Group Interview Questions
3.8
 • 61 Interviews
Psp Projects Interview Questions
3.9
 • 53 Interviews
View all
Texmaco Rail and Engineering Senior Billing Engineer Salary
based on 4 salaries
₹5.1 L/yr - ₹6.2 L/yr
27% less than the average Senior Billing Engineer Salary in India
View more details

Texmaco Rail and Engineering Senior Billing Engineer Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

3.0

Skill development

3.0

Work-life balance

4.0

Salary

2.0

Job security

2.0

Company culture

1.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
Assistant Engineer
45 salaries
unlock blur

₹1.8 L/yr - ₹4.8 L/yr

Assistant Manager
43 salaries
unlock blur

₹2.2 L/yr - ₹7.2 L/yr

Site Engineer
43 salaries
unlock blur

₹1.8 L/yr - ₹4.7 L/yr

Technical Assistant
40 salaries
unlock blur

₹1 L/yr - ₹2.8 L/yr

Senior Engineer
26 salaries
unlock blur

₹3.6 L/yr - ₹9 L/yr

Explore more salaries
Compare Texmaco Rail and Engineering with

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare

Apco Infratech

3.7
Compare

Saipem

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview