Deduction for plastering as per IS code is 20% for internal plastering and 33% for external plastering.
Deduction for internal plastering as per IS code is 20%.
Deduction for external plastering as per IS code is 33%.
Deduction in brick wall as per IS code refers to the reduction in dimensions of bricks to account for mortar joints.
As per IS code, deduction of 10 mm is done in each dimension of brick (length, breadth, height) for mortar joints.
This deduction is necessary to calculate the actual quantity of bricks required for a wall.
For example, if a brick has dimensions of 200mm x 100mm x 100mm, after deduction for mortar joints, t...
Top trending discussions
posted on 4 Jan 2021
I applied via Naukri.com and was interviewed in Jul 2020. There were 3 interview rounds.
posted on 25 Jun 2021
I applied via Recruitment Consultant and was interviewed before Jun 2020. There was 1 interview round.
posted on 2 Sep 2021
I applied via Campus Placement and was interviewed before Sep 2020. There was 1 interview round.
posted on 9 Oct 2021
I applied via Company Website and was interviewed before Oct 2020. There were 3 interview rounds.
I was interviewed before Feb 2024.
AC-DC converter converts alternating current (AC) to direct current (DC) for various applications.
AC voltage is converted to DC voltage using rectifiers
Rectifiers can be half-wave, full-wave, or bridge rectifiers
Filtering is done to smooth out the output voltage
Examples include power supplies for electronic devices and battery chargers
posted on 3 Sep 2021
Topic was given on comparison of government colleges and private colleges.
posted on 7 Aug 2023
I applied via Approached by Company and was interviewed in Feb 2023. There were 2 interview rounds.
posted on 26 Mar 2024
I applied via LinkedIn and was interviewed before Mar 2023. There were 2 interview rounds.
A water flow diagram of a Water Treatment Plant (WTP) shows the path of water through various treatment processes.
The diagram typically starts with raw water intake from a source such as a river or reservoir.
It then shows the water passing through processes like screening, coagulation, flocculation, sedimentation, filtration, and disinfection.
Finally, the treated water is stored in a clear well before distribution to c...
The capacity of structures in a Water Treatment Plant (WTP) is crucial for ensuring efficient operation and meeting demand.
Capacity of structures in a WTP refers to the maximum amount of water or waste that can be processed or stored.
Examples of structures in a WTP include sedimentation tanks, filters, pumps, and storage tanks.
Calculating the capacity involves considering factors like flow rates, retention times, and p...
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Assistant Engineer
47
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
43
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
43
salaries
| ₹0 L/yr - ₹0 L/yr |
Technical Assistant
41
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
24
salaries
| ₹0 L/yr - ₹0 L/yr |
TITAGARH WAGONS
Kalindee Rail Nirman (E)
BEML
Hind Rectifiers