I applied via Naukri.com and was interviewed before Mar 2022. There were 3 interview rounds.
I applied via Referral and was interviewed before Mar 2022. There were 2 interview rounds.
I applied via Approached by Company and was interviewed before Aug 2021. There were 2 interview rounds.
posted on 14 Aug 2024
MOC stands for Management of Change. It is a process used to ensure that changes in the workplace do not negatively impact health, safety, or the environment.
MOC involves assessing potential risks associated with a change before implementing it
It requires proper documentation and communication to all relevant parties
Examples of changes that may require MOC include introducing new equipment, modifying procedures, or cha
KPI stands for Key Performance Indicator. It is required to measure the effectiveness of an organization in achieving its objectives.
KPIs are specific metrics used to evaluate the success of an organization or a particular activity.
They help in monitoring progress towards goals and identifying areas that need improvement.
Examples of KPIs in HSE supervision include incident rates, compliance with safety regulations, and
Confined space work at height involves additional safety measures and precautions to prevent falls and other hazards.
Ensure proper training for working at heights in confined spaces
Use appropriate fall protection equipment such as harnesses and lanyards
Implement a permit system for confined space entry at height
Regularly inspect and maintain equipment used for working at heights in confined spaces
Have a rescue plan in
posted on 19 Jun 2024
Discussion with fire fighting systems in project building and different safety measures required for construction workers regarding safe work place.
I applied via Company Website and was interviewed in May 2023. There were 3 interview rounds.
Written and face to face interview and panell
I was interviewed in Jul 2022.
HVDC is a technology used to transmit high voltage DC power over long distances. Offshore connections refer to power transmission from offshore wind farms.
HVDC is more efficient than AC transmission over long distances
Offshore connections require specialized equipment and installation techniques
HVDC is used for offshore connections to transmit power from offshore wind farms to the mainland
Examples of HVDC projects incl...
posted on 28 Mar 2022
I applied via Recruitment Consulltant and was interviewed in Sep 2021. There were 3 interview rounds.
I applied via LinkedIn and was interviewed before Jul 2021. There were 2 interview rounds.
Project flow steps involve planning, design, implementation, testing, and maintenance.
Planning: Define project scope, objectives, and requirements.
Design: Develop a detailed plan and create schematics.
Implementation: Install and integrate components.
Testing: Verify functionality and performance.
Maintenance: Monitor and update system as needed.
Examples: Building a power distribution system, designing a control panel for
based on 1 interview
Interview experience
based on 4 reviews
Rating in categories
Process Engineer
124
salaries
| ₹5 L/yr - ₹14 L/yr |
Senior Engineer
116
salaries
| ₹7.2 L/yr - ₹20 L/yr |
Piping Designer
116
salaries
| ₹3.7 L/yr - ₹14.7 L/yr |
Senior Principal Engineer
109
salaries
| ₹15 L/yr - ₹32 L/yr |
Deputy Manager
91
salaries
| ₹7 L/yr - ₹23 L/yr |
L&T Energy Hydrocarbon
Baker Hughes
McDermott International
Saipem