i
TCS
Filter interviews by
I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.
I applied via Referral and was interviewed in May 2021. There were 5 interview rounds.
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
I applied via Newspaper Ad and was interviewed in Apr 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.
Mark to market is the process of valuing a financial asset based on its current market price.
Mark to market is used to accurately reflect the current value of an asset on a company's balance sheet.
It involves adjusting the value of the asset to reflect the current market price rather than the purchase price.
This process is commonly used for securities such as stocks, bonds, and derivatives.
Mark to market helps investor...
I applied via Campus Placement and was interviewed before Oct 2023. There was 1 interview round.
I applied via Walk-in and was interviewed in Dec 2024. There was 1 interview round.
posted on 18 Dec 2024
I applied via Naukri.com and was interviewed in Jun 2024. There were 3 interview rounds.
There are just a few logical and reasoning questions, and the second part of the test pertains to English proficiency.
Lack of growth opportunities and stagnant work environment.
Limited opportunities for career advancement
Feeling of being undervalued or unappreciated
Stagnant work environment with no new challenges or learning opportunities
I have worked on various projects including implementing quality assurance processes, conducting test cases, and analyzing data.
Implemented quality assurance processes to ensure product quality
Conducted test cases to identify bugs and issues
Analyzed data to improve product performance
Worked on projects in industries such as software development and healthcare
Some of the biggest challenges I faced in my previous organization included managing tight deadlines, resolving conflicts within teams, and adapting to changing project requirements.
Managing tight deadlines for multiple projects simultaneously
Resolving conflicts within teams and promoting effective communication
Adapting to changing project requirements and priorities
A pivot table is a data processing tool used to summarize, analyze, and present large amounts of data in a structured format.
Pivot tables allow users to rearrange and summarize data from a spreadsheet or database table to analyze trends and patterns.
They help in identifying relationships between different data points and making data-driven decisions.
Pivot tables can be used to calculate averages, sums, counts, and othe...
The seven tools of quality are a set of techniques used for quality control and improvement in manufacturing and service industries.
Check sheet: Used for collecting and analyzing data, such as defects or errors.
Control chart: Monitors process variation over time to identify trends or patterns.
Histogram: Displays data distribution to identify patterns or outliers.
Pareto chart: Helps prioritize issues by showing the most...
The formula for calculating variance is the sum of squared differences between each data point and the mean, divided by the total number of samples. Error percentage is the absolute difference between the actual and predicted values, divided by the actual value, multiplied by 100.
Variance = Σ((X - μ)²) / N, where X is each data point, μ is the mean, and N is the total number of samples
Error percentage = |(Actual - Pred...
RCA is a systematic process used to identify the underlying causes of problems or issues in order to prevent their recurrence.
RCA involves investigating an issue or problem to determine the root cause(s) rather than just addressing the symptoms.
It helps in identifying systemic issues within processes or systems that may be contributing to the problem.
RCA aims to prevent the recurrence of issues by addressing the root c...
Test case for login page using Selenium
Verify that the login page loads successfully
Enter valid credentials and verify successful login
Enter invalid credentials and verify appropriate error message
Check for password encryption
Verify the 'Forgot Password' functionality
Java program to find max in array
Iterate through the array and compare each element to find the maximum value
Initialize a variable to store the maximum value and update it as needed
Handle edge cases like empty array or null input
I applied via Naukri.com and was interviewed in Aug 2024. There was 1 interview round.
Sanction countries are nations that have been subjected to economic or political sanctions by other countries or international organizations.
Sanction countries may be restricted from trading with certain countries or organizations.
Sanctions are often imposed as a form of diplomatic or economic pressure to encourage a change in behavior.
Examples of sanction countries include Iran, North Korea, Russia, and Venezuela.
Trust is a belief in the reliability, truth, or ability of someone or something. Types of trust include interpersonal trust, institutional trust, and situational trust.
Interpersonal trust is trust between individuals based on personal relationships and experiences.
Institutional trust is trust in organizations, institutions, or systems, such as government or businesses.
Situational trust is trust that is context-specific...
Interview experience
based on 30 reviews
Rating in categories
System Engineer
1.1L
salaries
| ₹1 L/yr - ₹9 L/yr |
IT Analyst
67.4k
salaries
| ₹5.1 L/yr - ₹16 L/yr |
AST Consultant
51.3k
salaries
| ₹8 L/yr - ₹25 L/yr |
Assistant System Engineer
29.9k
salaries
| ₹2.2 L/yr - ₹5.6 L/yr |
Associate Consultant
29k
salaries
| ₹9 L/yr - ₹32 L/yr |
Amazon
Wipro
Infosys
Accenture