I applied via Approached by Company and was interviewed in Dec 2021. There were 4 interview rounds.
A power tester is a device used to test the functionality and safety of electrical power systems.
Power testers are used to check voltage levels, continuity, and resistance in electrical circuits.
They are commonly used by electricians, technicians, and engineers in various industries.
Power testers can help identify faulty wiring, circuit breakers, and electrical components.
They ensure compliance with safety standards an...
PCC and RCC grades are used to classify the strength of concrete.
PCC stands for Plain Cement Concrete and is classified into M5, M7.5, M10, M15, M20, M25, M30, M35, M40, M45, M50, M55, M60, and M70 grades based on its compressive strength.
RCC stands for Reinforced Cement Concrete and is classified into M15, M20, M25, M30, M35, M40, M45, M50, M55, M60, and M70 grades based on its compressive strength.
The higher the grad...
Underground cable laying specifications
Cables should be laid at a minimum depth of 600mm
Cables should be laid in trenches with a minimum width of 300mm
Trenches should be backfilled with sand or fine soil
Cables should be marked with warning tape at a depth of 300mm
Cables should be tested for insulation resistance before and after installation
Overhead conductors are used to transmit electrical power from one place to another. They come in different specifications based on their application.
Overhead conductors are made of aluminum or copper.
They are used to transmit electrical power over long distances.
The specifications of overhead conductors depend on factors such as the voltage, current, and distance of transmission.
Some common types of overhead conductor...
Top trending discussions
posted on 21 Jun 2024
I applied via Walk-in and was interviewed in May 2024. There were 2 interview rounds.
Maths question, and reasoning
The first law of thermodynamics states that energy cannot be created or destroyed, only transferred or converted.
Energy is conserved in a closed system
Energy can be transferred between different forms (e.g. heat, work)
The total energy of a system remains constant
Mathematically expressed as: ΔU = Q - W, where ΔU is the change in internal energy, Q is heat added to the system, and W is work done by the system
The second law of thermodynamics states that the total entropy of an isolated system can never decrease over time.
Entropy tends to increase in a closed system
Heat energy naturally flows from hot to cold objects
Efficiency of energy conversion processes is limited by the second law
posted on 2 May 2023
I applied via Naukri.com and was interviewed before May 2022. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Jun 2022. There were 5 interview rounds.
About Reasoning, verbal and logical
Some of industrial and GK topics about industry and economical and geographical related
I applied via Naukri.com and was interviewed in Feb 2022. There were 2 interview rounds.
posted on 8 Oct 2021
I applied via Referral and was interviewed in Apr 2021. There were 3 interview rounds.
Project management is the practice of planning, organizing, and executing projects to achieve specific goals within a defined timeframe.
Project management involves defining project objectives, creating a project plan, and allocating resources.
It includes coordinating and communicating with team members, stakeholders, and clients.
Project managers monitor progress, manage risks, and make adjustments to ensure successful ...
Clashing refers to conflicts or clashes between different elements or parties.
Clashing occurs when there is a disagreement or collision between two or more entities.
It can happen in various contexts such as project management, team dynamics, or resource allocation.
Examples of clashing include conflicting priorities, incompatible schedules, or disagreements on project scope.
Clashing can lead to delays, inefficiencies, o...
Recording delays involves documenting the cause, duration, and impact of the delay.
Identify the cause of the delay, such as equipment failure or resource unavailability.
Record the duration of the delay, including start and end times.
Document the impact of the delay on the project timeline, budget, and resources.
Use a standardized format or template to ensure consistency in recording delays.
Include any relevant supporti...
To claim, provide necessary documentation and evidence to support the claim.
Gather all relevant documentation and evidence to support the claim
Prepare a written claim statement explaining the basis of the claim
Submit the claim along with supporting documents to the appropriate authority
Follow up on the claim to ensure it is being processed
Provide any additional information or clarification if requested
The daily log contains a record of activities, progress, issues, and decisions made during a project.
Activities performed by the project team
Progress made on project tasks
Issues encountered and their resolutions
Decisions made during project meetings
Changes to project scope or requirements
Communication with stakeholders
Risks identified and mitigation strategies
Resource allocation and utilization
Budget updates
Milestones
posted on 17 Aug 2023
About technical and resources and manpower deployed to reduce time
Planning and sequence of structure erection involves creating a detailed schedule and coordinating various tasks to ensure efficient and safe construction.
Develop a comprehensive project schedule outlining the sequence of tasks and milestones
Coordinate with subcontractors and suppliers to ensure timely delivery of materials and equipment
Implement safety measures and protocols to protect workers and prevent accidents
Reg...
Planning and scheduling are crucial for project success as they help in setting clear goals, allocating resources efficiently, and ensuring timely completion.
Planning helps in defining project scope, objectives, and deliverables.
Scheduling helps in allocating resources, setting deadlines, and tracking progress.
Effective planning and scheduling reduce risks, improve communication, and increase productivity.
Examples: Gan...
based on 14 reviews
Rating in categories
Manager
1.5k
salaries
| ₹6 L/yr - ₹21 L/yr |
Assistant Manager
1.4k
salaries
| ₹5.2 L/yr - ₹15.5 L/yr |
Senior Manager
1.3k
salaries
| ₹9.2 L/yr - ₹35 L/yr |
Junior Engineer
893
salaries
| ₹2 L/yr - ₹10 L/yr |
Engineer
845
salaries
| ₹2.2 L/yr - ₹11 L/yr |
JSW Steel
Steel Authority Of India
Vedanta Limited
ArcelorMittal Nippon Steel