i
Tata Projects
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
Clear (1)
I applied via Company Website and was interviewed before Aug 2021. There were 3 interview rounds.
Underground Metro segment casting yard steam curing is a process used to accelerate the strength gain of concrete segments for tunnel construction.
Steam curing involves applying high temperature steam to the concrete segments to speed up the hydration process.
This method helps in achieving the required strength of the segments in a shorter time period.
Steam curing is often used in precast concrete production for underg...
Segment casting cycle is the process of creating segments for construction projects using precast concrete.
Segments are cast in a controlled environment to ensure quality and consistency.
The casting cycle includes preparing molds, pouring concrete, curing, demolding, and finishing.
Segments are then transported to the construction site and assembled to form the final structure.
Segments repairing process involves identifying and fixing issues in different sections of a product or system.
Identify the specific segment that needs repair
Analyze the root cause of the issue
Develop a plan for repairing the segment
Implement the repair process
Test the repaired segment to ensure functionality
Top trending discussions
posted on 28 Feb 2024
I applied via Company Website and was interviewed before Dec 2022. There were 2 interview rounds.
The water-cement (w/c) ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.
The w/c ratio is a crucial factor in determining the strength and durability of concrete.
A lower w/c ratio typically results in stronger and more durable concrete.
The w/c ratio should be carefully controlled to achieve the desired concrete properties.
For example, a w/c ratio of 0.5 means that for every 1 kg o
I applied via Walk-in and was interviewed in Aug 2023. There was 1 interview round.
posted on 10 Sep 2017
I was interviewed before Sep 2016.
posted on 10 Sep 2015
I applied via PLACEMENT
posted on 11 May 2018
posted on 12 May 2018
I was interviewed before Mar 2020.
posted on 18 Jan 2020
I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.
Maintain elevation of underground piping by using level instruments and proper installation techniques.
Use a level instrument to check the elevation of the piping during installation.
Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.
Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.
Consider using supports o...
In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.
Managed a team of employees and delegated tasks effectively
Handled customer complaints and resolved issues in a timely manner
Created and implemented strategies to improve efficiency and productivity
Collaborated with other departments to achieve company goals
Conducted performanc
Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.
Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.
Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.
Cast iron electrodes have a high nickel content to prevent cracking.
Aluminum electrodes have a special coating ...
based on 2 interviews
Interview experience
based on 13 reviews
Rating in categories
Deputy Manager
1.2k
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
719
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
407
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
387
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Manager
367
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Reliance Infrastructure
GMR Group
Hindustan Construction Company