Premium Employer

i

This company page is being actively managed by Tata Projects Team. If you also belong to the team, you can get access from here

Tata Projects Verified Tick

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Tata Projects Mechanical Technician Interview Questions and Answers

Updated 21 Jul 2022

Tata Projects Mechanical Technician Interview Experiences

1 interview found

I applied via Campus Placement and was interviewed in Jun 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Mechanical Mentenac technician
  • Q2. Mechanical Mentenac Tenchician

Interview Preparation Tips

Interview preparation tips for other job seekers - Mechanical Mentenace mechanical hevi Eukument job metal healing

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Tell about chiller& AHU
  • Ans. 

    A chiller is a machine that removes heat from a liquid via a vapor-compression or absorption refrigeration cycle. An AHU (Air Handling Unit) is a device used to regulate and circulate air as part of a heating, ventilating, and air-conditioning (HVAC) system.

    • Chillers are commonly used in commercial and industrial buildings to cool water or other fluids for air conditioning or process cooling.

    • AHUs are responsible for con...

  • Answered by AI

I applied via Company Website and was interviewed before Jun 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. About my past experiences and myself.
Round 3 - HR 

(1 Question)

  • Q1. What is your salary expectations.
Round 4 - Group Discussion 

Work relevance discussion with others participants.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Luck, Nothing to worry. This is a good company. He will be take care of all employees.
Round 1 - Technical 

(2 Questions)

  • Q1. Design inputs for s&t heat exchanger
  • Ans. 

    Design inputs for s&t heat exchanger

    • Fluid type and flow rate

    • Temperature range and desired heat transfer rate

    • Pressure drop limitations

    • Material selection for tubes and fins

    • Space and weight constraints

    • Environmental factors such as corrosion and fouling

    • Operating conditions and maintenance requirements

  • Answered by AI
  • Q2. Design perameters, tube details, moc,

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare Code related questions available in internet

Interview Questionnaire 

4 Questions

  • Q1. About Fan
  • Q2. About Aph
  • Q3. About mill
  • Q4. About esp
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. About mechanical maintenance and operation
  • Q2. Types of gear boxes and gears used in taht
  • Ans. 

    Types of gear boxes and gears commonly used in mechanical engineering include spur gears, helical gears, bevel gears, and worm gears.

    • Spur gears: most common type, straight teeth parallel to the gear axis

    • Helical gears: angled teeth for smoother and quieter operation

    • Bevel gears: used to change the direction of rotation

    • Worm gears: used for high reduction ratios and high torque applications

  • Answered by AI
  • Q3. Types of conveyors and maintenance to conveyor
  • Ans. 

    Types of conveyors include belt, roller, chain, screw, and pneumatic. Maintenance involves regular inspection, cleaning, lubrication, and replacing worn parts.

    • Types of conveyors: belt, roller, chain, screw, pneumatic

    • Maintenance tasks: regular inspection, cleaning, lubrication, replacing worn parts

    • Examples: Belt conveyor used in manufacturing plants, roller conveyor in warehouses

  • Answered by AI
  • Q4. Trouble shooting on blowers and compressors
  • Ans. 

    Troubleshooting blowers and compressors involves identifying and resolving issues with their operation.

    • Start by checking for any unusual noises or vibrations coming from the blower or compressor.

    • Inspect the filters and ensure they are clean and not clogged, as this can affect performance.

    • Check for any leaks in the system, as this can lead to a decrease in efficiency.

    • Verify that all connections and components are secure...

  • Answered by AI
  • Q5. Overhauling of gear boxes and fans compressors
  • Ans. 

    Overhauling gear boxes and fans compressors involves disassembling, inspecting, repairing, and reassembling the components to ensure optimal performance.

    • Disassemble the gear boxes and fans compressors carefully to inspect for any wear or damage

    • Replace any worn out or damaged parts with new ones

    • Clean and lubricate all components before reassembling

    • Perform tests to ensure proper functioning after overhaul

    • Document the ove

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge in rotary equipments
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in May 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(8 Questions)

  • Q1. About strl erection
  • Q2. About manpower handeling
  • Q3. About codes and standards
  • Q4. About raw material
  • Q5. About contractor handling
  • Q6. About hot work and height job executing
  • Q7. About erection procedures of structure
  • Q8. About safety precautions during hot job

Interview Preparation Tips

Topics to prepare for Worley Mechanical Engineer interview:
  • Fabricatoin
  • Erection
Interview preparation tips for other job seekers - I would like to continue my job in structural fabrication and erection.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before May 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. General past experience questions & technical questions related to pump curves, packages, past equipment handled.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well for the equipment worked on previously. Brush up on general codes & standards.
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is the definition of Lathe?
  • Ans. 

    A lathe is a machine tool that rotates a workpiece about an axis of rotation to perform various operations such as cutting, sanding, drilling, knurling, or deformation.

    • Lathe is used to shape and cut materials such as wood, metal, and plastic.

    • It rotates the workpiece on its axis and a cutting tool is applied to the workpiece to remove material.

    • Lathe can perform various operations such as turning, facing, drilling, borin...

  • Answered by AI
  • Q2. What is the Boiler Drum? & how it's work
  • Ans. 

    Boiler drum is a cylindrical container which is used to store water and steam produced in a boiler.

    • It is a vital component of a boiler system.

    • It is usually made of steel and is located at the top of the boiler.

    • It acts as a reservoir of water/steam and helps to separate steam from water.

    • It also helps to regulate the pressure and temperature of the steam.

    • The level of water in the drum is maintained by a feedwater control...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - For entry level, they ask simple questions.. Which means overall thermal power plant related in a layout..

I applied via Referral and was interviewed before Jun 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Most questions were from prior experience. Since my expertise is into Boilers, Fired heaters, Flares, Packages etc., questions were related to my exposure to these packages. Also, I was asked if I was ok t...
Round 3 - HR 

(1 Question)

  • Q1. Only salary negotiation was done along with basic questions like reason for leaving etc.

Interview Preparation Tips

Interview preparation tips for other job seekers - Study from whatever you have worked on.
I recognised that Worley welcomes all kind of experiences pertaining to their field of operation.

Tata Projects Interview FAQs

How many rounds are there in Tata Projects Mechanical Technician interview?
Tata Projects interview process usually has 2 rounds. The most common rounds in the Tata Projects interview process are Resume Shortlist and Technical.
What are the top questions asked in Tata Projects Mechanical Technician interview?

Some of the top questions asked at the Tata Projects Mechanical Technician interview -

  1. Mechanical Mentenac technic...read more
  2. Mechanical Mentenac Tenchic...read more

Tell us how to improve this page.

Tata Projects Mechanical Technician Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Join Tata Projects Simplify. Create.

Interview Questions from Similar Companies

KEC International Interview Questions
4.0
 • 308 Interviews
TCE Interview Questions
3.8
 • 251 Interviews
Saint-Gobain Interview Questions
4.0
 • 173 Interviews
Worley Interview Questions
4.1
 • 113 Interviews
GMR Group Interview Questions
4.0
 • 84 Interviews
View all

Tata Projects Mechanical Technician Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

3.0

Skill development

3.0

Work-life balance

4.0

Salary

3.0

Job security

5.0

Company culture

1.0

Promotions

3.0

Work satisfaction

Explore 1 Review and Rating
Deputy Manager
1.2k salaries
unlock blur

₹5.8 L/yr - ₹17.5 L/yr

Assistant Manager
723 salaries
unlock blur

₹4 L/yr - ₹14.8 L/yr

Manager
416 salaries
unlock blur

₹8 L/yr - ₹22 L/yr

Senior Engineer
392 salaries
unlock blur

₹3.5 L/yr - ₹12 L/yr

Safety Officer
348 salaries
unlock blur

₹2.1 L/yr - ₹8 L/yr

Explore more salaries
Compare Tata Projects with

Shapoorji Pallonji Group

4.1
Compare

Kalpataru Projects International

4.1
Compare

Nagarjuna Construction Company

4.1
Compare

KEC International

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview