Premium Employer

i

This company page is being actively managed by Tata Projects Team. If you also belong to the team, you can get access from here

Tata Projects

Compare button icon Compare button icon Compare
4.3

based on 4.9k Reviews

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Tata Projects Electrical Maintenance Technician Interview Questions and Answers

Updated 16 Feb 2023

Tata Projects Electrical Maintenance Technician Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jan 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

HT ELCTRICALE HT,RM,VCB,CABALE INSULET JOINT,LT INDUSTRI CONTROL PYANAL WAIRING AND ALL ELECTRICALE SERVESE MENTAINENS

Round 3 - Technical 

(2 Questions)

  • Q1. 1/Wat ht vcb worck For Ht use
  • Ans. 

    The question is asking about how a VCB (Vacuum Circuit Breaker) works for high voltage (HT) applications.

    • VCB is a type of circuit breaker that uses vacuum as the arc quenching medium.

    • It is commonly used in high voltage applications to interrupt or isolate electrical circuits.

    • When the VCB is closed, the contacts are in physical contact, allowing the current to flow.

    • When the VCB is opened, the contacts are separated, cre...

  • Answered by AI
  • Q2. 2/ LT HOW TO USE ANS-
  • Ans. 

    LT HOW TO USE is a question about the proper usage of LT (Low Tension) equipment.

    • Read the user manual or instructions provided by the manufacturer.

    • Ensure proper installation and grounding of the LT equipment.

    • Follow safety protocols and use personal protective equipment (PPE) when working with LT equipment.

    • Regularly inspect and maintain the LT equipment to ensure its optimal performance.

    • Train and educate yourself on the...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - NEW SAIT CONSTRECTION
ELECTRICALE WORK KLEARENSE NEW ROOT

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in Nov 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. According to machinery hem
  • Q2. Hydraulic
Round 2 - Technical 

(2 Questions)

  • Q1. Heavy Arth movers equipment
  • Q2. Engine, transmission
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Engineer * Supervising the manufacturing processes ensuring qualitywork is done in a safe efficient manner. * Responsibility of maintenance & Quality of both lines planning day to day maintenance to ...
  • Q2. Engineer * Supervising the manufacturing processes ensuring quality work is done in a safe efficient manner. * I have worked erection & commissioning of All motor conveyor Dpc gear box maintenance work ...
  • Q3. Bucket elevator
  • Q4. Hello sir my name is Ranjeet Kumar

Interview Preparation Tips

Interview preparation tips for other job seekers - Key Responsibilities in Project Stage
Review Plans and specifications according to the plan.
Preparing of fabrication & erection bar chart.
Fabrication and erection of hopper, transition piece .
Preparation of Fabrication and Erection bill & checking. schedule during the progress of the site works with regards to Fabrication team.
Manage day to day work of the MECH team.
Review the Contractor’s installation method statements.
Monitor and promote health and safety on the site and keep the record. Keeping close watch on various activities of Project (like delivery of materials, site clearance, duration of activities, “Holds” etc.)
Keeping abreast of advancements in engineering and production, and sharing knowledge with co-workers.
Prepare measurement sheet from on-site data & drawings. Engineer
* Supervising the manufacturing processes ensuring quality work is done in a safe efficient manner.
* I have worked erection & commissioning of All motor conveyor Dpc gear box maintenance work
* No repeat of break downs.

I applied via Referral and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Lt motor and HT motors and all electrical safety device
  • Q2. What is your current job and what are you doing

Interview Preparation Tips

Interview preparation tips for other job seekers - Yes I help me and hard working and nice to talk and senior parson talk to nice
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Oct 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Why did you like doing electrical work?
  • Q2. With science and technolog
Round 3 - Technical 

(1 Question)

  • Q1. What thing are you doing to him? Amp, volt ,ohm
Round 4 - Technical 

(1 Question)

  • Q1. Which is more deficult .AC&DC
  • Ans. 

    AC and DC both have their own challenges, but AC is generally considered more difficult due to its changing voltage and frequency.

    • AC involves constantly changing voltage and frequency, which can be more challenging to work with compared to the steady flow of DC.

    • AC circuits require additional components like capacitors and inductors to manage voltage and current fluctuations.

    • DC circuits are simpler to understand and tro...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Office staff good working area good
Site staff more deficult people

Interview Questionnaire 

4 Questions

  • Q1. What is work of Pressure part in Boiler Shutdown.
  • Ans. 

    Pressure parts in boiler shutdown are inspected and maintained to ensure safe and efficient operation.

    • Pressure parts include boiler tubes, headers, and drums.

    • During shutdown, pressure parts are inspected for signs of wear, corrosion, and damage.

    • Maintenance tasks may include cleaning, repairing, or replacing pressure parts as needed.

    • Proper maintenance of pressure parts is crucial for preventing accidents and ensuring ef

  • Answered by AI
  • Q2. Tell me your self and about your previous job.
  • Q3. Asking about boiler tube material.
  • Q4. Work safely procedure.

I applied via Approached by Company and was interviewed before Mar 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. What is CB operation and use?
  • Ans. 

    CB operation and use refers to the operation and use of circuit breakers in electrical systems.

    • CBs are used to protect electrical systems from overloads and short circuits.

    • They work by interrupting the flow of current when a fault is detected.

    • CBs can be manually or automatically operated.

    • They come in different types, such as air, oil, vacuum, and SF6 CBs.

    • CBs are commonly used in residential, commercial, and industrial

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - 3 manths traning and doing any working condition

Tata Projects Interview FAQs

How many rounds are there in Tata Projects Electrical Maintenance Technician interview?
Tata Projects interview process usually has 3 rounds. The most common rounds in the Tata Projects interview process are Resume Shortlist, Aptitude Test and Technical.
What are the top questions asked in Tata Projects Electrical Maintenance Technician interview?

Some of the top questions asked at the Tata Projects Electrical Maintenance Technician interview -

  1. 1/Wat ht vcb worck For Ht ...read more
  2. 2/ LT HOW TO USE A...read more

Tell us how to improve this page.

Join Tata Projects Simplify. Create.

Interview Questions from Similar Companies

KEC International Interview Questions
4.1
 • 286 Interviews
TCE Interview Questions
3.8
 • 239 Interviews
Saint-Gobain Interview Questions
4.0
 • 169 Interviews
Worley Interview Questions
4.1
 • 105 Interviews
View all

Tata Projects Electrical Maintenance Technician Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-Life balance

5.0

Salary & Benefits

5.0

Job Security

5.0

Company culture

5.0

Promotions/Appraisal

5.0

Work Satisfaction

Explore 1 Review and Rating
Deputy Manager
1.1k salaries
unlock blur

₹5.7 L/yr - ₹17 L/yr

Assistant Manager
708 salaries
unlock blur

₹5 L/yr - ₹14.8 L/yr

Senior Engineer
389 salaries
unlock blur

₹3.5 L/yr - ₹13.5 L/yr

Manager
388 salaries
unlock blur

₹8 L/yr - ₹24.1 L/yr

Senior Manager
347 salaries
unlock blur

₹12 L/yr - ₹32.5 L/yr

Explore more salaries
Compare Tata Projects with

Larsen & Toubro Limited

4.0
Compare

Reliance Infrastructure

4.1
Compare

GMR Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview