Upload Button Icon Add office photos

Filter interviews by

Target Engineering Construction Company Piping Supervisor Foreman Interview Questions and Answers

Updated 28 Jan 2023

Target Engineering Construction Company Piping Supervisor Foreman Interview Experiences

1 interview found

Piping Supervisor Foreman Interview Questions & Answers

user image VIDYASAGAR CHAUHAN

posted on 28 Jan 2023

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Nature of work,work related question like able to work in workshop or at site ,no people can manage.
  • Q2. Prepare drawing like p&id,GA,ISOMETRIC,PLAN,STRUCTURAL, SUPPORT,ETC.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident what youhave learn during your work.focus on lerning then go for erning.

Interview questions from similar companies

I was interviewed before Feb 2021.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Case Study 

12th

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil formen ho m mari ko job ki jarurt h

I applied via Recruitment Consulltant and was interviewed before Sep 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Some equation of leveling or survey

Interview Preparation Tips

Interview preparation tips for other job seekers - Make connection with other to grow up. Finally change your company when you have enough experience. .

I applied via Campus Placement and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1.  l&t company establishment date
  • Q2. You have a experience in construction line.
  • Q3. What working to be site
  • Ans. Box culvert, returning wall, desk slab, cross bariyar, tow wall etc.
  • Answered by Suman maity

Interview Preparation Tips

Interview preparation tips for other job seekers - I am try to be small time to complete the work. My site is properly safety with 0 accident. It's projected is my responsibility.
I work to rail project, road project, hospital and metro project working in site.

I applied via Campus Placement and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - Aptitude Test 

Aptitude question and reasoning.

Round 2 - interview 

(1 Question)

  • Q1. Design of a building
  • Ans. 

    Design of a building

    • Determine the purpose and function of the building

    • Consider the site and location

    • Create a preliminary design and get feedback

    • Finalize the design and create detailed plans

    • Ensure compliance with building codes and regulations

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - It is good for all freshers. all the facilities and pay scale are quite good.

Interview Questionnaire 

1 Question

  • Q1. Engineering related questions like how to define material volume and weight and density etc..

Interview Preparation Tips

Interview preparation tips for other job seekers - I am in contract base joining job.

I applied via Campus Placement and was interviewed before Feb 2020. There were 5 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Cement test ,initially setting time
  • Q2. Cube mould size
  • Ans. 

    Cube mould size is a standard size used for testing the compressive strength of concrete.

    • Cube moulds are typically made of steel or cast iron.

    • The standard size for cube moulds is 150mm x 150mm x 150mm.

    • Other sizes such as 100mm x 100mm x 100mm and 200mm x 200mm x 200mm are also used.

    • The moulds are filled with concrete and left to cure before being tested for compressive strength.

    • Cube moulds are used to ensure that the c...

  • Answered by AI
  • Q3. 1m. 8mm Dia steel rod weight,how to calculate
  • Ans. 

    To calculate the weight of an 8mm diameter steel rod, use the formula: weight = volume x density.

    • Calculate the volume of the rod using the formula: volume = π x (diameter/2)^2 x length

    • Find the density of steel, which is typically around 7850 kg/m^3

    • Multiply the volume by the density to get the weight of the rod

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical strong.This interview was both knowledge and communication between sub contractor and engineer. Most of the questions related to diploma circling.

I applied via Company Website and was interviewed before Jun 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical question

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical questions .structure work
Related.like road bridge and building.

I applied via Company Website and was interviewed in Jun 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. Why do you want this job?
  • Ans. I positively look forward to give my best to your organization.
  • Answered by Dhinesh Babu
  • Q2. What attracted you to this company?
  • Ans. The company is great are team work.
  • Answered by Dhinesh Babu
  • Q3. What are your strength?
  • Ans. I am very strong analytical skills.
  • Answered by Dhinesh Babu

Interview Preparation Tips

Interview preparation tips for other job seekers - Bring your sense of humor and smile.

Interview Questionnaire 

1 Question

  • Q1. Structure work

Target Engineering Construction Company Interview FAQs

How many rounds are there in Target Engineering Construction Company Piping Supervisor Foreman interview?
Target Engineering Construction Company interview process usually has 2 rounds. The most common rounds in the Target Engineering Construction Company interview process are Resume Shortlist and Technical.

Tell us how to improve this page.

Target Engineering Construction Company Piping Supervisor Foreman Interview Process

based on 1 interview

Interview experience

3
  
Average
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 426 Interviews
Tata Technologies Interview Questions
3.6
 • 256 Interviews
Saint-Gobain Interview Questions
4.0
 • 172 Interviews
Dilip Buildcon Interview Questions
4.0
 • 140 Interviews
G R Infraprojects Interview Questions
4.1
 • 133 Interviews
View all

Target Engineering Construction Company Piping Supervisor Foreman Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

2.0

Skill development

3.0

Work-life balance

3.0

Salary

2.0

Job security

2.0

Company culture

2.0

Promotions

2.0

Work satisfaction

Explore 1 Review and Rating
Site Engineer
10 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Store Keeper
8 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

HSE Officer
8 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Planning Engineer
8 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Procurement Engineer
7 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Target Engineering Construction Company with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Punj Lloyd

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview