Filter interviews by
I applied via AmbitionBox and was interviewed in Sep 2023. There were 4 interview rounds.
Basic aptitude test with mcq and few technical mcq
Scan chain reorder is a technique used in DFT to optimize the order of scan chains for better test coverage.
Scan chain reorder is used to optimize the order of scan chains in a design to improve test coverage.
It involves rearranging the scan chains to minimize test application time and maximize fault coverage.
Linux commands can be used for various DFT tasks such as file manipulation, script execution, and log analysis.
...
Top trending discussions
posted on 28 Mar 2022
Discipline wise deliverables are interdependent and require coordination for successful project completion.
Each discipline has its own set of deliverables that are interdependent on each other.
Coordination is required to ensure timely delivery of each discipline's deliverables.
Examples of discipline wise deliverables include civil engineering drawings, electrical schematics, and mechanical designs.
Codes and standards are crucial for ensuring safety and efficiency in process industries.
ASME B31.3 for piping systems
NFPA 70 for electrical systems
API 650 for storage tanks
OSHA for workplace safety
ISO 9001 for quality management
ANSI/ISA-88 for batch control systems
posted on 27 Jan 2024
I was interviewed before Jan 2023.
Deliverables are the tangible or intangible outputs of a project that are provided to the stakeholders.
Deliverables can be physical products, such as a building or a software application.
Deliverables can also be documents, such as project plans, reports, or specifications.
Deliverables can include completed tasks, milestones, or objectives.
Deliverables should meet the agreed-upon requirements and be delivered within the...
Model reviews are conducted to ensure accuracy and quality of the project's design.
Model reviews are conducted at various stages of the project to identify and resolve any design issues.
The purpose of model reviews is to ensure that the project's design meets the required standards and specifications.
Different types of model reviews include concept reviews, design reviews, and final reviews.
Concept reviews are conducte...
To enable data factory, you need to create a data factory resource in Azure and configure it with linked services, datasets, and pipelines.
Create a data factory resource in Azure portal
Configure linked services to connect to data sources and destinations
Define datasets to represent the data you want to process
Create pipelines to orchestrate the movement and transformation of data
Monitor and manage the data factory usin
To disable data factory, you can stop or delete the data factory resources.
Stop or delete the data factory pipelines and triggers
Deallocate or delete the data factory linked services
Disable or delete the data factory datasets and data flows
I applied via Referral and was interviewed before Dec 2019. There was 1 interview round.
I applied via Company Website
I applied via Naukri.com and was interviewed in Sep 2020. There were 3 interview rounds.
I applied via Referral and was interviewed in Dec 2020. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Apr 2021. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in May 2021. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Senior Engineer
48
salaries
| ₹0 L/yr - ₹0 L/yr |
Physical Design Engineer
48
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Engineer
32
salaries
| ₹0 L/yr - ₹0 L/yr |
Design & Verification Engineer
28
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Physical Design Engineer
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Sankalp Semiconductor
Einfochips
Tata Elxsi
Mistral Solutions