Suzlon Group
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
Clear (1)
I applied via Referral and was interviewed in Jan 2024. There was 1 interview round.
A capacitor is an electronic component that stores and releases electrical energy in a circuit.
Capacitors are used to filter out noise in electronic circuits.
They can also be used to store energy in flash cameras.
Capacitors are measured in Farads (F).
PCB stands for Printed Circuit Board, it is a board made of non-conductive material with conductive tracks for electronic components.
PCB is used to mechanically support and electrically connect electronic components using conductive pathways.
Components are soldered onto the PCB to create a functional electronic circuit.
PCB assembly involves placing components on the board, soldering them in place, and testing the circu...
Top trending discussions
I applied via Company Website and was interviewed in Jun 2024. There was 1 interview round.
I have extensive experience working with wind turbines, including maintenance, troubleshooting, and repairs.
Performed regular maintenance checks on wind turbines to ensure optimal performance
Troubleshooted and repaired mechanical and electrical issues as needed
Worked with a team to install new wind turbines and ensure they were functioning correctly
Utilized specialized tools and equipment to perform tasks safely and ef
Site incharge oversees operations, manages resources, ensures safety, and coordinates with stakeholders.
Managing day-to-day operations at the site
Supervising and coordinating with on-site staff and contractors
Ensuring compliance with safety regulations and protocols
Managing resources effectively to meet project deadlines
Communicating with clients, vendors, and other stakeholders
Troubleshooting technical issues and prov...
Focus on communication skill.
I was interviewed in Jan 2025.
Failure in coupling in Ganesa WTG can occur due to misalignment, wear and tear, or lack of lubrication.
Misalignment of the coupling can lead to failure, causing vibration and noise.
Wear and tear of the coupling components can result in reduced efficiency and eventual failure.
Lack of proper lubrication can cause increased friction and overheating, leading to coupling failure.
The quality issue with 0 max coupling refers to a problem with the maximum coupling value in a system.
Investigate the root cause of the quality issue with 0 max coupling
Check for any software or hardware malfunctions causing the problem
Ensure proper calibration and maintenance of the system
Implement corrective actions to resolve the quality issue
My current CTC is $60,000 per year.
My current CTC is $60,000 per year
I am currently earning $5,000 per month
My total compensation package is $60,000 annually
My expected CTC is negotiable based on the job responsibilities and market standards.
My expected CTC is based on my experience, skills, and the job requirements.
I am open to discussing the compensation package during the interview process.
I am looking for a competitive salary that reflects my qualifications and contributions.
I am flexible and willing to consider a range of compensation options.
I am seeking a fair and r...
MES stands for Manufacturing Execution System, which is a software system used in manufacturing to track and control production processes.
MES helps in monitoring and controlling production processes in real-time
It provides data collection, analysis, and reporting capabilities
MES helps in improving efficiency, quality, and compliance in manufacturing operations
Examples of MES software include Siemens SIMATIC IT, Rockwel...
I was interviewed in Oct 2024.
DFIG stands for Doubly Fed Induction Generator, a type of generator used in wind turbines.
DFIG is a type of generator commonly used in wind turbines
It has two sets of windings - one connected to the grid and the other connected to a converter
The converter allows control of the generator's output power and speed
DFIG is known for its ability to provide variable speed operation and improved efficiency
It is a popular choic...
Wind power is generated by harnessing the kinetic energy of wind to turn turbines, which then convert the energy into electricity.
Wind turbines capture the kinetic energy of the wind and convert it into mechanical energy.
The mechanical energy is then used to turn a generator, which produces electricity.
Wind power is a renewable energy source that is clean and sustainable.
Wind farms are large areas with multiple wind tu...
I applied via Walk-in and was interviewed in Feb 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Mar 2022. There were 2 interview rounds.
based on 1 interview
Interview experience
Electrical Engineer
567
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
538
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
517
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
353
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
279
salaries
| ₹0 L/yr - ₹0 L/yr |
Vestas
Inox Wind
GE Vernova
Siemens Gamesa Renewable Power Private Limited