Filter interviews by
Top trending discussions
posted on 1 Sep 2022
I applied via Approached by Company and was interviewed in Mar 2022. There was 1 interview round.
I applied via Campus Placement and was interviewed in Jul 2021. There was 1 interview round.
IRC67 is a code for safety requirements for passenger ships.
IRC stands for International Code of Safety for Ships Carrying Passengers
IRC67 specifically refers to the 1967 version of the code
It outlines safety requirements for passenger ships, including fire safety, life-saving equipment, and stability
The code is regularly updated to reflect new safety standards and technologies
HIRA stands for Hazard Identification and Risk Assessment.
HIRA is a systematic process of identifying potential hazards and assessing the associated risks.
It involves identifying the hazards, evaluating the risks, and implementing control measures to mitigate the risks.
HIRA is an important tool for ensuring workplace safety and preventing accidents.
Examples of hazards that may be identified through HIRA include chemica...
I applied via Company Website and was interviewed before Aug 2020. There were 3 interview rounds.
I have experience in designing and analyzing transmission lines for power distribution.
Designed and analyzed transmission lines for power distribution projects
Performed load flow analysis and short circuit analysis for transmission lines
Experience in using software tools like PLS-CADD and PLS-POLE
Knowledge of industry standards and regulations for transmission line design
Collaborated with cross-functional teams to ensu
Design of foundation is crucial for the stability and safety of any structure.
The type of foundation depends on the soil type and load-bearing capacity.
Factors like building height, weight, and seismic activity must be considered.
Proper drainage and waterproofing must be incorporated.
Foundation design must comply with local building codes and regulations.
Examples of foundation types include shallow, deep, and pile foun
I applied via Other and was interviewed in Oct 2020. There were 3 interview rounds.
Power transmission & operation of batching plant in transit mixer is crucial for efficient concrete mixing.
Power transmission in transit mixer is done through a hydraulic motor which is connected to the mixer drum.
The batching plant is responsible for mixing the ingredients in the right proportion and delivering it to the transit mixer.
The operation of the batching plant involves loading the ingredients into the hopper...
I applied via Company Website and was interviewed before Apr 2021. There were 7 interview rounds.
Accident, incident
Any hazardous
Any near miss
HIRA
I applied via Naukri.com and was interviewed before Jan 2020. There were 4 interview rounds.
I applied via Recruitment Consultant and was interviewed before Oct 2019. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Civil Site Engineer
20
salaries
| ₹0.6 L/yr - ₹3.6 L/yr |
Accounts Officer
8
salaries
| ₹2.7 L/yr - ₹6 L/yr |
Safety Officer
7
salaries
| ₹1.8 L/yr - ₹6.5 L/yr |
Billing Engineer
7
salaries
| ₹2.4 L/yr - ₹8.4 L/yr |
Senior Engineer
6
salaries
| ₹5 L/yr - ₹6 L/yr |
L&T Construction
Simplex Infrastructures
ITD Cementation India
Ashoka Buildcon