Upload Button Icon Add office photos

Filter interviews by

Super Smelters Deputy Project Manager Interview Questions and Answers

Updated 24 Nov 2019

Super Smelters Deputy Project Manager Interview Experiences

1 interview found

I applied via Referral and was interviewed in May 2019. There were 3 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. How you can handle manpower having team of 50 people
  • Q2. Describe about project experience
  • Q3. How you can coordinate with your senior
  • Q4. What is your role in your team
  • Q5. Describe me about your achievement and about your failure a

Interview Preparation Tips

Interview preparation tips for other job seekers - Be honest about your Proffeseon and cool.
During negotiations be clever.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Hard
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Nov 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Explain GTG Operation and load sharing
  • Ans. 

    GTG operation involves multiple generators working together to share the load and ensure continuous power supply.

    • GTG stands for Gas Turbine Generator

    • In GTG operation, multiple generators are synchronized to work together

    • Load sharing ensures that the power demand is distributed evenly among the generators

    • This helps in maintaining a stable power supply and prevents overloading of any single generator

  • Answered by AI

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What challenges u had face
  • Ans. 

    I have faced various challenges in my career, including adapting to new technologies and managing difficult team members.

    • Adapting to new technologies and software

    • Managing difficult team members and conflicts

    • Meeting tight deadlines and handling high-pressure situations

    • Learning new skills and taking on new responsibilities

    • Dealing with unexpected setbacks and obstacles

  • Answered by AI
  • Q2. How you handel situation
  • Ans. 

    I handle situations by staying calm, assessing the problem, and finding a solution.

    • I remain calm and composed in high-pressure situations

    • I analyze the situation to understand the root cause of the problem

    • I prioritize tasks and delegate responsibilities to team members

    • I communicate effectively with all stakeholders to ensure a smooth resolution

    • For example, when a customer was dissatisfied with our service, I listened to...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Bring confidence in yourself you can do it
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jun 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Unshaped refractories and types of industry culture
  • Ans. 

    Unshaped refractories are versatile materials used in various industries, each with its own unique culture.

    • Unshaped refractories are materials that can be molded and shaped to fit specific applications without the need for pre-fabrication.

    • They are commonly used in industries such as steelmaking, cement production, and petrochemical refining.

    • Each industry has its own unique culture and practices when it comes to the use...

  • Answered by AI
  • Q2. Steel making process
  • Ans. 

    Steel making process involves converting iron ore into steel through various processes like smelting, refining, and casting.

    • Iron ore is first mined and then processed to remove impurities.

    • The purified iron ore is then melted in a blast furnace with coke and limestone to produce molten iron.

    • The molten iron is then converted into steel through processes like basic oxygen steelmaking or electric arc furnace.

    • The steel is t...

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Location, Previous industry background
  • Q2. Previous CTC , 5 and half day leave and why you change your current job
Round 1 - Technical 

(1 Question)

  • Q1. Quation related siemens plc automation and dc/ ac motors/drives

Interview Preparation Tips

Interview preparation tips for other job seekers - Focus on technical questions and the dc motor maintenance,scheduling the pm

Interview Questionnaire 

2 Questions

  • Q1. Which area in the M/C, you are expert ?
  • Ans. 

    I am an expert in the sales and marketing area of the M/C.

    • I have extensive experience in developing and implementing successful sales strategies.

    • I am skilled in market research and analysis, identifying customer needs and preferences.

    • I have a proven track record of achieving sales targets and increasing revenue.

    • I am proficient in digital marketing, including social media and email marketing.

    • I have excellent communicati...

  • Answered by AI
  • Q2. You have to know everything in engine.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepar for interviews.
Interview experience
4
Good
Difficulty level
Hard
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Details of power station design
  • Ans. 

    Power station design involves the planning and construction of facilities that generate electricity.

    • Design includes selection of appropriate technology and equipment

    • Consideration of environmental impact and safety measures

    • Layout and construction of buildings and infrastructure

    • Integration with power grid and transmission systems

    • Examples include thermal power plants, hydroelectric power plants, and wind farms

  • Answered by AI
  • Q2. Efficiency of Power station
  • Ans. 

    Efficiency of a power station is the ratio of output power to input power.

    • Efficiency can be improved by using advanced technologies and equipment.

    • Regular maintenance and cleaning of equipment can also improve efficiency.

    • Efficiency can be affected by factors such as fuel quality, weather conditions, and demand for electricity.

    • For example, a power station using combined cycle technology can achieve an efficiency of up to...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Stick to the basiscs and don't show overconfidence. Details overall knowledge must have to crack the interview

I applied via Company Website and was interviewed in Jul 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Regarding project procurement, negotiations, some personal questions, vendor development

Interview Preparation Tips

Interview preparation tips for other job seekers - be prepared for project related questions and SAP

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Steel Interview Questions
4.1
 • 830 Interviews
JSW Steel Interview Questions
3.9
 • 569 Interviews
Metso Outotec Interview Questions
4.3
 • 65 Interviews
Vedanta Limited Interview Questions
3.8
 • 44 Interviews
Hindustan Zinc Interview Questions
3.8
 • 43 Interviews
View all

Fast track your campus placements

View all
Super Smelters Deputy Project Manager Salary
based on 4 salaries
₹6 L/yr - ₹7.7 L/yr
39% less than the average Deputy Project Manager Salary in India
View more details
Assistant Engineer
207 salaries
unlock blur

₹1.5 L/yr - ₹4 L/yr

Engineer
153 salaries
unlock blur

₹1.6 L/yr - ₹5.6 L/yr

Assistant Manager
78 salaries
unlock blur

₹3.7 L/yr - ₹10 L/yr

Senior Engineer
62 salaries
unlock blur

₹3.4 L/yr - ₹6.2 L/yr

Electrical Engineer
39 salaries
unlock blur

₹1.6 L/yr - ₹4.8 L/yr

Explore more salaries
Compare Super Smelters with

Tata Steel

4.1
Compare

JSW Steel

3.9
Compare

Steel Authority Of India

4.1
Compare

Vedanta Limited

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview