Filter interviews by
Clear (1)
I applied via Approached by Company and was interviewed before Jun 2023. There were 2 interview rounds.
Unshaped refractories are versatile materials used in various industries, each with its own unique culture.
Unshaped refractories are materials that can be molded and shaped to fit specific applications without the need for pre-fabrication.
They are commonly used in industries such as steelmaking, cement production, and petrochemical refining.
Each industry has its own unique culture and practices when it comes to the use...
Steel making process involves converting iron ore into steel through various processes like smelting, refining, and casting.
Iron ore is first mined and then processed to remove impurities.
The purified iron ore is then melted in a blast furnace with coke and limestone to produce molten iron.
The molten iron is then converted into steel through processes like basic oxygen steelmaking or electric arc furnace.
The steel is t...
Top trending discussions
I applied via Company Website and was interviewed in Jul 2021. There were 3 interview rounds.
I applied via Own and was interviewed before Aug 2022. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Mar 2022. There were 2 interview rounds.
Power station design involves the planning and construction of facilities that generate electricity.
Design includes selection of appropriate technology and equipment
Consideration of environmental impact and safety measures
Layout and construction of buildings and infrastructure
Integration with power grid and transmission systems
Examples include thermal power plants, hydroelectric power plants, and wind farms
Efficiency of a power station is the ratio of output power to input power.
Efficiency can be improved by using advanced technologies and equipment.
Regular maintenance and cleaning of equipment can also improve efficiency.
Efficiency can be affected by factors such as fuel quality, weather conditions, and demand for electricity.
For example, a power station using combined cycle technology can achieve an efficiency of up to...
I applied via Recruitment Consulltant and was interviewed in Nov 2023. There was 1 interview round.
GTG operation involves multiple generators working together to share the load and ensure continuous power supply.
GTG stands for Gas Turbine Generator
In GTG operation, multiple generators are synchronized to work together
Load sharing ensures that the power demand is distributed evenly among the generators
This helps in maintaining a stable power supply and prevents overloading of any single generator
I applied via Campus Placement
Go through Numerical Ability and DI in depth
Current Topics mostly is given as Agenda
I applied via Referral and was interviewed in Nov 2024. There were 2 interview rounds.
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed before Apr 2020. There were 3 interview rounds.
Yes, I have experience handling pressure in my previous roles.
I prioritize tasks and manage my time effectively to meet deadlines
I remain calm and focused under pressure
I communicate effectively with my team to ensure everyone is on the same page
For example, in my previous job as a shift supervisor, I had to handle a busy shift with a shortage of staff. I delegated tasks efficiently and communicated clearly with my tea...
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Manager
21
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
15
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
13
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Supervisor
10
salaries
| ₹0 L/yr - ₹0 L/yr |
TRL Krosaki Refractories
IFGL Refractories
Dalmia-OCL
Dalmia Bharat Group