I applied via Walk-in and was interviewed in Jan 2023. There were 3 interview rounds.
Injection Moulding Working Process.
Injection moulding is a manufacturing process used to produce parts by injecting molten material into a mould.
Injection moulding is a widely used method for manufacturing plastic parts.
It involves injecting molten material, typically plastic, into a mould cavity.
The molten material solidifies inside the mould, taking its shape.
The mould is then opened, and the finished part is ejected.
Injection moulding allows for high...
I applied via Walk-in and was interviewed in Nov 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via Campus Placement and was interviewed before Jun 2022. There were 2 interview rounds.
Injection moulding is a manufacturing process where molten material is injected into a mould cavity to create a solid object.
Molten material is injected into a mould cavity under high pressure
The material cools and solidifies to form the desired shape
Commonly used for producing plastic parts in mass production
Used in various industries such as automotive, medical, and consumer goods
Injection moulding is a manufacturing process used to produce parts by injecting material into a mould.
Injection moulding involves melting a material and injecting it into a mould cavity
The material solidifies inside the mould and is then ejected as a finished part
Common materials used in injection moulding include plastics, metals, and glass
Sundaram Auto Components interview questions for popular designations
I applied via Recruitment Consultant and was interviewed in Apr 2020. There were 3 interview rounds.
Feed speed refers to the rate at which the cutting tool moves along the workpiece, while cutting speed refers to the speed at which the workpiece rotates or moves relative to the cutting tool.
Feed speed is measured in units of distance per time, such as inches per minute or millimeters per second.
Cutting speed is measured in units of surface speed, such as feet per minute or meters per second.
Feed speed determines how ...
Production planning is the process of organizing resources and activities to achieve production goals efficiently.
It involves determining the production schedule, allocating resources, and setting production targets.
It helps to ensure that production is carried out in a timely and cost-effective manner.
Factors such as demand, inventory levels, and capacity are taken into account during production planning.
Effective pro...
posted on 1 Jul 2021
OEE stands for Overall Equipment Efficiency. It is a measure of how effectively a manufacturing operation is utilized.
OEE is calculated by multiplying Availability, Performance, and Quality.
Availability measures the percentage of time that equipment is available for production.
Performance measures the speed at which the equipment operates compared to its designed speed.
Quality measures the percentage of good-quality pr...
Production planning in shopfloor involves creating a detailed plan for manufacturing processes to ensure efficient and timely production.
Production planning involves determining the sequence of operations, resources required, and estimated time for each task.
It includes creating a production schedule, allocating resources, and coordinating with different departments.
The goal is to optimize production, minimize downtime...
Productivity is the measure of efficiency and output in relation to the resources used.
Productivity is a measure of how efficiently resources are used to produce goods or services.
It is the ratio of output to input, indicating how much is produced per unit of input.
Higher productivity means achieving more output with the same or fewer resources.
For example, in manufacturing, productivity can be measured by the number o...
5S is a methodology used to organize and maintain a clean, efficient, and safe work environment.
5S stands for Sort, Set in Order, Shine, Standardize, and Sustain.
Sort involves removing unnecessary items from the workplace.
Set in Order focuses on arranging necessary items in a logical and efficient manner.
Shine involves cleaning and maintaining the workplace.
Standardize establishes guidelines and procedures for maintain...
posted on 31 Aug 2022
I applied via Naukri.com and was interviewed in Jul 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before May 2022. There were 2 interview rounds.
Yes, I have experience in both CNC and VMC programming.
I have worked with various CNC machines and have programmed them using G-code and M-code.
I am familiar with VMC programming and have experience in setting up tool paths and creating programs for 3-axis and 4-axis machines.
I have also worked with CAM software such as Mastercam and SolidWorks to create CNC programs.
I am comfortable with reading technical drawings and
Yes, I am familiar with machine setting.
I have experience in setting up machines for production runs.
I am knowledgeable in adjusting machine settings to optimize output and quality.
I am familiar with troubleshooting machine issues related to settings.
For example, I have set up CNC machines for precision cutting and adjusted injection molding machines for consistent product quality.
I applied via Recruitment Consulltant and was interviewed before Aug 2022. There were 3 interview rounds.
posted on 13 Nov 2021
I applied via Company Website and was interviewed in Oct 2021. There was 1 interview round.
Some of the top questions asked at the Sundaram Auto Components interview for freshers -
The duration of Sundaram Auto Components interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 3 interviews
Interview experience
based on 273 reviews
Rating in categories
Assistant Manager
57
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
51
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Inspector
35
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
33
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Production Engineer
16
salaries
| ₹0 L/yr - ₹0 L/yr |
Bharat Forge
Samvardhana Motherson Group
Rane Group
Sona Comstar