Filter interviews by
Mechanical stoppers are used to limit the movement of a mechanical component or system.
Mechanical stoppers are commonly used in machinery to prevent overtravel or to establish a specific position.
They can be adjustable or fixed depending on the application.
Examples include limit switches, physical barriers, and adjustable bolts.
Proper maintenance and inspection of mechanical stoppers are crucial to ensure safe and effi
PLC stands for Programmable Logic Controller, used in industrial automation to control machinery and processes.
PLCs are used to automate processes in industries such as manufacturing, automotive, and food processing.
They can be programmed to control various devices such as motors, sensors, and valves.
PLCs help improve efficiency, reduce human error, and increase productivity in industrial settings.
Examples of PLC brand...
SMPS stands for Switched Mode Power Supply, which is used to convert electrical power efficiently.
SMPS is a type of power supply that uses a switching regulator to convert electrical power efficiently.
It is commonly used in electronic devices such as computers, televisions, and LED lights.
SMPS is preferred over linear power supplies due to its higher efficiency and smaller size.
It operates by rapidly switching the inpu...
Top trending discussions
posted on 13 May 2022
posted on 13 May 2022
I applied via Company Website and was interviewed before May 2021. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Apr 2020. There were 3 interview rounds.
Feed speed refers to the rate at which the cutting tool moves along the workpiece, while cutting speed refers to the speed at which the workpiece rotates or moves relative to the cutting tool.
Feed speed is measured in units of distance per time, such as inches per minute or millimeters per second.
Cutting speed is measured in units of surface speed, such as feet per minute or meters per second.
Feed speed determines how ...
Production planning is the process of organizing resources and activities to achieve production goals efficiently.
It involves determining the production schedule, allocating resources, and setting production targets.
It helps to ensure that production is carried out in a timely and cost-effective manner.
Factors such as demand, inventory levels, and capacity are taken into account during production planning.
Effective pro...
posted on 1 Jul 2021
OEE stands for Overall Equipment Efficiency. It is a measure of how effectively a manufacturing operation is utilized.
OEE is calculated by multiplying Availability, Performance, and Quality.
Availability measures the percentage of time that equipment is available for production.
Performance measures the speed at which the equipment operates compared to its designed speed.
Quality measures the percentage of good-quality pr...
Production planning in shopfloor involves creating a detailed plan for manufacturing processes to ensure efficient and timely production.
Production planning involves determining the sequence of operations, resources required, and estimated time for each task.
It includes creating a production schedule, allocating resources, and coordinating with different departments.
The goal is to optimize production, minimize downtime...
Productivity is the measure of efficiency and output in relation to the resources used.
Productivity is a measure of how efficiently resources are used to produce goods or services.
It is the ratio of output to input, indicating how much is produced per unit of input.
Higher productivity means achieving more output with the same or fewer resources.
For example, in manufacturing, productivity can be measured by the number o...
5S is a methodology used to organize and maintain a clean, efficient, and safe work environment.
5S stands for Sort, Set in Order, Shine, Standardize, and Sustain.
Sort involves removing unnecessary items from the workplace.
Set in Order focuses on arranging necessary items in a logical and efficient manner.
Shine involves cleaning and maintaining the workplace.
Standardize establishes guidelines and procedures for maintain...
posted on 31 Aug 2022
I applied via Naukri.com and was interviewed in Jul 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before May 2022. There were 2 interview rounds.
Yes, I have experience in both CNC and VMC programming.
I have worked with various CNC machines and have programmed them using G-code and M-code.
I am familiar with VMC programming and have experience in setting up tool paths and creating programs for 3-axis and 4-axis machines.
I have also worked with CAM software such as Mastercam and SolidWorks to create CNC programs.
I am comfortable with reading technical drawings and
Yes, I am familiar with machine setting.
I have experience in setting up machines for production runs.
I am knowledgeable in adjusting machine settings to optimize output and quality.
I am familiar with troubleshooting machine issues related to settings.
For example, I have set up CNC machines for precision cutting and adjusted injection molding machines for consistent product quality.
I applied via Recruitment Consulltant and was interviewed before Aug 2022. There were 3 interview rounds.
posted on 13 Nov 2021
I applied via Company Website and was interviewed in Oct 2021. There was 1 interview round.
posted on 1 Feb 2024
I applied via Walk-in and was interviewed before Feb 2023. There were 2 interview rounds.
Yes, I am ready for relocation.
I am open to moving to a new location for the job.
I am flexible and adaptable to new environments.
I have experience relocating for previous positions.
I am excited about the opportunity to explore a new city or country.
I am willing to make the necessary arrangements and adjustments for relocation.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Assistant Manager
57
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
51
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Inspector
35
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
33
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Production Engineer
16
salaries
| ₹0 L/yr - ₹0 L/yr |
Bharat Forge
Samvardhana Motherson Group
Rane Group
Sona Comstar