Upload Button Icon Add office photos

Filter interviews by

SUEZ Group Interview Questions, Process, and Tips

Updated 18 Feb 2025

Top SUEZ Group Interview Questions and Answers

View all 9 questions

SUEZ Group Interview Experiences

Popular Designations

14 interviews found

Document Controller Interview Questions & Answers

user image Alok kumar tiwari

posted on 26 Oct 2023

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Based on Last job
  • Q2. Based on Last work
Round 3 - One-on-one 

(2 Questions)

  • Q1. Based on Last work
  • Q2. Handling documents

Document Controller Interview Questions asked at other Companies

Q1. How many Engineering Documents will be process if you handle EPC project?
View answer (4)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. Construction of SLF
  • Ans. 

    Construction of sanitary landfill (SLF) involves site selection, design, construction, and operation.

    • Site selection is crucial to ensure minimal environmental impact and proper waste management.

    • Design includes planning for liners, leachate collection systems, and gas collection systems.

    • Construction involves building the cells, compacting waste, and installing necessary infrastructure.

    • Operation includes monitoring gas e...

  • Answered by AI
  • Q2. Construction of SEP Pond
  • Ans. 

    Construction of a Stormwater Pollution Prevention (SEP) Pond involves excavation, lining, and planting vegetation.

    • Excavate the area to create a basin for collecting stormwater runoff

    • Line the pond with impermeable materials to prevent seepage

    • Plant vegetation around the pond to help filter pollutants from the runoff

    • Regular maintenance is required to ensure proper functioning

  • Answered by AI
  • Q3. Construction of F.F.R.P Pond
  • Ans. 

    Construction of F.F.R.P Pond involves using Fiber Reinforced Polymer materials for lining and reinforcement.

    • F.F.R.P stands for Fiber Reinforced Polymer, which is a composite material made of a polymer matrix reinforced with fibers.

    • The construction process involves excavation of the pond area, preparation of the base, installation of F.F.R.P liner, and backfilling around the pond.

    • F.F.R.P ponds are durable, corrosion-res...

  • Answered by AI

Civil Engineer Interview Questions asked at other Companies

Q1. What is the curing formalities for our precast segment???
View answer (22)
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Case Study 

All the questions asked about hydraulic design of water distribution network and hydraulic modeling software like ICM, info works, waterGEMS and SewerGEMS etc.

Assistant Manager Interview Questions asked at other Companies

Q1. You are Handling cash operations then how you manage operations with sales ?
View answer (89)
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Water pipe line work
  • Ans. 

    Water pipe line work involves installation, maintenance, and repair of water distribution systems.

    • Installation of new water pipe lines

    • Maintenance of existing water pipe lines

    • Repairing leaks or damages in water pipe lines

    • Ensuring proper water flow and pressure

    • Following safety protocols and regulations

    • Using specialized tools and equipment

    • Collaborating with other technicians and engineers

    • Testing water quality and pressure

  • Answered by AI
  • Q2. Electrician work
  • Q3. Water pipeline work
  • Ans. 

    Water pipeline work involves installation, maintenance, and repair of pipelines to ensure efficient water distribution.

    • Installation of new water pipelines to expand water distribution network

    • Regular maintenance to prevent leaks and ensure proper flow of water

    • Repairing damaged pipelines to restore water supply

    • Use of specialized tools and equipment for pipeline work

    • Compliance with safety regulations to prevent accidents

  • Answered by AI
  • Q4. Data entry work
  • Q5. Pipeline networking work
  • Ans. 

    Pipeline networking work involves designing, installing, and maintaining networks of pipelines for various purposes.

    • Designing pipeline routes to optimize efficiency and minimize environmental impact

    • Installing pipelines using specialized equipment and techniques

    • Performing regular maintenance and inspections to ensure safety and functionality

    • Troubleshooting and repairing pipeline issues as they arise

    • Coordinating with oth...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Dear Sir, we have side work which is of water pipeline.

Skills evaluated in this interview

Senior Technician Interview Questions asked at other Companies

Q1. What would you do if the computer is turned off and doesn’t turn on ?
View answer (2)

SUEZ Group interview questions for popular designations

 Document Controller

 (2)

 Assistant Manager

 (1)

 Procurement Engineer

 (1)

 Senior Technician

 (1)

 Civil Engineer

 (1)

 Executive

 (1)

 Mechanical Engineer

 (1)

 Customer Service Executive

 (1)

Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Sep 2023. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. In-depth introduction
  • Q2. Qualifications & projects worked on
Round 2 - One-on-one 

(3 Questions)

  • Q1. Introduction & interests
  • Q2. Knowledge regarding the field you've applied for
  • Q3. Expectations & guidence

Interview Preparation Tips

Interview preparation tips for other job seekers - Friendly & helping colleagues.
So much to learn & experience.

Internship Trainee Interview Questions asked at other Companies

Q1. Tell about your UG project? How will you design a table for 1 tonne load and what are all the consideration needed for it? Tell the Equations you know in strength of Materials? What are manufacturing processes involved to fabricate ball bea... read more
View answer (2)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Process control
  • Q2. All parameters testing

Interview Preparation Tips

Interview preparation tips for other job seekers - Water treatment plant ,lab testing,calibration standards

Executive Quality Control Interview Questions asked at other Companies

Q1. How many weights are the in a balance calibration weight box.?
View answer (7)

Jobs at SUEZ Group

View all

Mechanical Engineer Interview Questions & Answers

user image Saumya Mechanical

posted on 2 Jun 2023

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is mechanical engineering
  • Ans. 

    Mechanical engineering is a branch of engineering that involves the design, analysis, and manufacturing of mechanical systems.

    • Involves designing and analyzing mechanical systems such as engines, machines, and tools

    • Focuses on principles of physics, materials science, and mathematics

    • Includes areas like thermodynamics, fluid mechanics, and robotics

    • Mechanical engineers work in industries like automotive, aerospace, and man

  • Answered by AI
  • Q2. Why you chose mechanical engineering

Mechanical Engineer Interview Questions asked at other Companies

Q1. What we need to do if pressure valve fail in boiler
View answer (8)

Document Controller Interview Questions & Answers

user image Alok kumar tiwari

posted on 10 Jan 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. About your work
  • Q2. Previous experiences

Document Controller Interview Questions asked at other Companies

Q1. How many Engineering Documents will be process if you handle EPC project?
View answer (4)

Mechanical Engineer 1 Interview Questions & Answers

user image Saumya Mechanical

posted on 29 Jun 2022

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. What is second low of thermodynamics
  • Ans. 

    The second law of thermodynamics states that the total entropy of a closed system always increases over time.

    • Entropy always increases in a closed system

    • Heat cannot flow from a colder body to a hotter body without external work being done

    • Efficiency of a heat engine cannot be 100%

    • The law explains why perpetual motion machines are impossible

  • Answered by AI
Round 3 - Technical 

(1 Question)

  • Q1. Which pipes used for steam line
  • Ans. 

    Pipes made of carbon steel or alloy steel are commonly used for steam lines.

    • Carbon steel pipes are suitable for low to medium pressure steam

    • Alloy steel pipes are used for high-pressure steam

    • Pipes should be properly insulated to prevent heat loss

    • Regular maintenance and inspection are necessary to prevent leaks and corrosion

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - 4 years complete in mechanical sector and I am happy to here

Mechanical Engineer 1 Interview Questions asked at other Companies

Q1. How to do fast complete job with safety and quality
View answer (1)

Executive Interview Questions & Answers

user image Anonymous

posted on 31 Jan 2022

Round 1 - One-on-one 

(1 Question)

  • Q1. Questions relating to my profile were asked.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good learning experience. All the best

Executive Interview Questions asked at other Companies

Q1. How will you start RS method Development for known drug product?
View answer (16)

I applied via Campus Placement and was interviewed before Aug 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Tell me something about yourself
  • Q2. Why did you opt for dual specialisation
  • Q3. Why do you want to join SUEZ
Round 3 - One-on-one 

(3 Questions)

  • Q1. General field related question
  • Q2. Discussion about my research paper
  • Q3. How do I landed up in FORE

Interview Preparation Tips

Interview preparation tips for other job seekers - Always have a learning attitude to new challenges

Senior Executive Interview Questions asked at other Companies

Q1. If oneday the men power is very less due to some problem and lode is more that day as a senior Exucative, how will u handle your team ?
View answer (56)

SUEZ Group Interview FAQs

How many rounds are there in SUEZ Group interview?
SUEZ Group interview process usually has 1-2 rounds. The most common rounds in the SUEZ Group interview process are Technical, Resume Shortlist and HR.
How to prepare for SUEZ Group interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at SUEZ Group. The most common topics and skills that interviewers at SUEZ Group expect are SAP CO, Arcgis, Bid Management, CRM and Cleaning.
What are the top questions asked in SUEZ Group interview?

Some of the top questions asked at the SUEZ Group interview -

  1. What is second low of thermodynam...read more
  2. Which pipes used for steam l...read more
  3. What is mechanical engineer...read more

Tell us how to improve this page.

SUEZ Group Interview Process

based on 18 interviews

Interview experience

4.4
  
Good
View more

Interview Questions from Similar Companies

Accenture Interview Questions
3.8
 • 8.3k Interviews
Capgemini Interview Questions
3.7
 • 4.8k Interviews
Tech Mahindra Interview Questions
3.5
 • 3.9k Interviews
Tata Steel Interview Questions
4.1
 • 867 Interviews
Google Interview Questions
4.4
 • 841 Interviews
Publicis Sapient Interview Questions
3.5
 • 620 Interviews
JSW Steel Interview Questions
3.9
 • 605 Interviews
UltraTech Cement Interview Questions
4.2
 • 595 Interviews
View all

SUEZ Group Reviews and Ratings

based on 415 reviews

4.2/5

Rating in categories

4.0

Skill development

4.1

Work-life balance

3.8

Salary

4.0

Job security

4.0

Company culture

3.5

Promotions

4.0

Work satisfaction

Explore 415 Reviews and Ratings
Manager- Indirect Tax

Gurgaon / Gurugram

7-8 Yrs

Not Disclosed

Proposal Manager (HO, Gurgaon)

Gurgaon / Gurugram

12-15 Yrs

Not Disclosed

Manager- Direct Tax (Income Tax)

Gurgaon / Gurugram

5-6 Yrs

Not Disclosed

Explore more jobs
Assistant Manager
104 salaries
unlock blur

₹6 L/yr - ₹13.5 L/yr

Senior Engineer
75 salaries
unlock blur

₹4 L/yr - ₹9 L/yr

Engineer
45 salaries
unlock blur

₹2.2 L/yr - ₹5.5 L/yr

Joint Manager
45 salaries
unlock blur

₹9 L/yr - ₹20 L/yr

Civil Site Engineer
38 salaries
unlock blur

₹2.3 L/yr - ₹6.2 L/yr

Explore more salaries
Compare SUEZ Group with

Accenture

3.8
Compare

Capgemini

3.7
Compare

Tech Mahindra

3.5
Compare

Larsen & Toubro Limited

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview