Filter interviews by
I applied via Naukri.com and was interviewed before Jan 2023. There was 1 interview round.
Top trending discussions
posted on 4 Oct 2024
I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.
I have previous experience working on construction sites as a Document Controller.
Managed and organized all project documentation
Ensured all documents were up to date and easily accessible
Collaborated with project teams to maintain accurate records
Implemented document control procedures to streamline processes
posted on 14 May 2024
I applied via Walk-in and was interviewed before May 2023. There were 2 interview rounds.
Questions for job role and perform task (for job role).
Discussion with senior, manager and Hod
posted on 23 Aug 2024
I applied via Approached by Company and was interviewed before Aug 2023. There was 1 interview round.
Plant modification process involves planning, design, approval, implementation, and documentation.
Initial assessment of plant needs and feasibility of modification
Designing the modifications with input from engineers and stakeholders
Obtaining necessary approvals from regulatory bodies
Implementing the modifications with proper supervision
Documenting the entire process for future reference
Different statuses and revisions of drawings include preliminary, approved, issued, and as-built.
Preliminary drawings are initial drafts that may undergo multiple revisions before being approved.
Approved drawings have been reviewed and accepted for use.
Issued drawings are distributed to relevant parties for construction or reference.
As-built drawings reflect the final state of a project after construction is completed.
The final status of a drawing is typically marked as 'Approved' or 'Released'.
Final status of drawing is usually 'Approved' or 'Released'
Once a drawing is approved, it is considered final and can be used for construction or manufacturing
The final status indicates that the drawing has been reviewed and accepted for use
posted on 26 Nov 2024
It was really good. Concrete on the vocabulary.
I applied via Naukri.com and was interviewed before Nov 2022. There were 3 interview rounds.
Basic aptitude test..watch some videos on YouTube and then you are good
posted on 22 Aug 2024
I applied via Recruitment Consulltant and was interviewed before Aug 2023. There was 1 interview round.
Discuss about my overall work experience and my working style to process the document.
posted on 27 May 2024
I applied via Naukri.com and was interviewed in Nov 2023. There was 1 interview round.
Processing of documents involves receiving, reviewing, approving, distributing, and archiving documents.
Receive documents from various sources such as email, mail, or file sharing platforms
Review documents for accuracy, completeness, and compliance with standards
Approve documents by obtaining necessary signatures or stamps
Distribute documents to relevant stakeholders or departments
Archive documents in a secure and orga
Engineering departments involved in EPCM sector include civil, mechanical, electrical, and process engineering.
Civil Engineering
Mechanical Engineering
Electrical Engineering
Process Engineering
P&ID stands for Piping and Instrumentation Diagram, a detailed diagram used in engineering to show the piping of a process flow. Isometric is a 3D representation of a piping system.
P&ID is a detailed diagram that shows the piping of a process flow, along with the instruments and control devices used in the process.
Isometric drawings are 3D representations of a piping system, showing the layout and connections in three ...
I have used various document management softwares such as SharePoint, Documentum, and FileNet.
SharePoint
Documentum
FileNet
posted on 23 Aug 2024
I applied via Approached by Company and was interviewed before Aug 2023. There was 1 interview round.
Plant modification process involves planning, design, approval, implementation, and documentation.
Initial assessment of plant needs and feasibility of modification
Designing the modifications with input from engineers and stakeholders
Obtaining necessary approvals from regulatory bodies
Implementing the modifications with proper supervision
Documenting the entire process for future reference
Different statuses and revisions of drawings include preliminary, approved, issued, and as-built.
Preliminary drawings are initial drafts that may undergo multiple revisions before being approved.
Approved drawings have been reviewed and accepted for use.
Issued drawings are distributed to relevant parties for construction or reference.
As-built drawings reflect the final state of a project after construction is completed.
The final status of a drawing is typically marked as 'Approved' or 'Released'.
Final status of drawing is usually 'Approved' or 'Released'
Once a drawing is approved, it is considered final and can be used for construction or manufacturing
The final status indicates that the drawing has been reviewed and accepted for use
based on 2 interviews
Interview experience
based on 2 reviews
Rating in categories
Lead Engineer
5
salaries
| ₹8.5 L/yr - ₹16.8 L/yr |
Engineer Trainee
5
salaries
| ₹2 L/yr - ₹3.5 L/yr |
Operations Manager
5
salaries
| ₹1.2 L/yr - ₹21 L/yr |
Assistant Manager - EHS
3
salaries
| ₹4.4 L/yr - ₹8.5 L/yr |
Executive Engineer
3
salaries
| ₹2.8 L/yr - ₹4.8 L/yr |
TCS
Accenture
Wipro
Cognizant