Filter interviews by
I expect a challenging role where I can utilize my skills and experience to make a significant impact.
Opportunity for growth and advancement
Collaborative work environment
Clear expectations and goals
Supportive leadership
Opportunities for learning and development
I am seeking a Senior Officer role to utilize my extensive experience in project management and leadership.
Seeking a role that aligns with my skills and experience in project management
Looking for opportunities to lead and mentor a team
Interested in contributing to the growth and success of the organization
I applied via Recruitment Consulltant and was interviewed before May 2022. There was 1 interview round.
I appeared for an interview before Feb 2021.
I applied via Company Website and was interviewed in Nov 2020. There were 3 interview rounds.
I applied via Newspaper Ad and was interviewed before Apr 2023. There was 1 interview round.
Depot fleet refers to a group of vehicles or equipment stored in a central location for maintenance, repair, or distribution purposes.
Depot fleet is commonly used in industries such as transportation, logistics, and military.
It helps in efficiently managing and organizing the maintenance and distribution of vehicles or equipment.
Examples include a fleet of buses stored at a central depot for maintenance and a fleet of
posted on 19 Jan 2018
I applied via Walk-in and was interviewed before Jun 2021. There were 2 interview rounds.
I applied via Recruitment Consultant and was interviewed in Jan 2020. There were 3 interview rounds.
MHr stands for Man-Hour. Costing is done by calculating the total number of man-hours required for a task and multiplying it by the cost per hour.
MHr stands for Man-Hour, which is a unit of measurement for the amount of work performed by an individual in one hour.
Costing is done by determining the total number of man-hours required for a specific task or project.
The cost per hour is then multiplied by the total number ...
I do not have the current pricing information for ADC 12 & plastic resins.
I apologize, but I do not have the current pricing information for ADC 12 & plastic resins.
I would need to conduct research or consult with a colleague who has access to this information.
Pricing for these materials can fluctuate frequently based on market demand and other factors.
Costing of plastic and casting parts involves analyzing material costs, production processes, and overhead expenses.
Analyze the material costs by considering the type and quantity of plastic or casting material required.
Evaluate the production processes involved in manufacturing the parts, including molding or casting techniques.
Consider the labor costs, machine costs, and energy costs associated with the production pr...
To determine the machine and tool cost for a plastic part.
Analyze the dimensions and material of the plastic part
Identify the required tolerances and surface finish
Consider the production volume and lead time
Research the available machines and their capabilities
Calculate the tooling cost based on the chosen machine
Consider the maintenance and operating costs of the machine
I applied via Naukri.com and was interviewed before Aug 2020. There was 1 interview round.
based on 3 interviews
2 Interview rounds
based on 10 reviews
Rating in categories
Assistant Engineer
2.7k
salaries
| ₹1.5 L/yr - ₹4 L/yr |
Deputy Engineer
1.8k
salaries
| ₹1.5 L/yr - ₹4.5 L/yr |
Diploma Trainee Engineer
926
salaries
| ₹1.2 L/yr - ₹3 L/yr |
Engineer
409
salaries
| ₹1.7 L/yr - ₹7 L/yr |
Production Engineer
343
salaries
| ₹1.2 L/yr - ₹6.9 L/yr |
JBM Group
Endurance Technologies
Spark Minda
Gabriel India