Filter interviews by
To stop Windows update, you can temporarily disable the Windows Update service.
Open the Run dialog by pressing Windows key + R, then type 'services.msc' and press Enter.
Scroll down to find 'Windows Update' in the list of services.
Right-click on 'Windows Update' and select 'Stop'.
To prevent Windows Update from starting again, you can set the startup type of the service to 'Disabled'.
Top trending discussions
I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.
Process engineering involves designing, optimizing, and managing industrial processes to improve efficiency and productivity.
Process engineering focuses on analyzing and improving processes in various industries such as manufacturing, chemical, and pharmaceutical.
It involves identifying bottlenecks, reducing waste, and implementing process improvements to enhance productivity.
Process engineers use tools like process fl...
cp and pp are both commands in Unix-like operating systems, but they have different functionalities.
cp stands for 'copy' and is used to copy files or directories from one location to another.
pp stands for 'print and pause' and is used to print files with pagination, pausing after each page.
cp can be used to create a duplicate of a file or directory, while pp is used for printing files in a controlled manner.
Example: cp...
A control plan is a documented procedure that outlines the steps and measures taken to ensure quality and consistency in a manufacturing process.
Control plans are commonly used in industries such as automotive, aerospace, and electronics.
They include details on the process steps, key characteristics, measurement methods, and acceptable tolerances.
Control plans help identify potential risks, prevent defects, and ensure ...
SMED stands for Single Minute Exchange of Die. It is a lean manufacturing technique used to reduce the time it takes to change over a production process.
SMED is used to minimize downtime during changeovers
It focuses on separating internal and external setup tasks
The goal is to convert as many internal setup tasks to external setup tasks
By reducing setup time, production flexibility and efficiency are improved
Capex stands for capital expenditure, which refers to the funds used by a company to acquire, upgrade, or maintain physical assets.
Capex is an investment made by a company to purchase or improve long-term assets such as buildings, equipment, or technology.
It is different from operational expenses (opex) which are ongoing costs to run the business.
Capex is typically planned and budgeted for in advance.
Examples of capex ...
posted on 29 Jul 2021
I applied via Campus Placement and was interviewed before Jul 2020. There were 4 interview rounds.
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Referral and was interviewed before Sep 2020. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Aug 2021. There were 3 interview rounds.
posted on 19 Jan 2021
I was interviewed in Jul 2020.
I have achieved several milestones throughout my career as a Senior Engineer.
Successfully led a team of engineers to develop and implement a new software system, resulting in a 20% increase in efficiency.
Received recognition for designing and implementing a cost-effective solution that reduced production downtime by 30%.
Contributed to the development of a groundbreaking technology that revolutionized the industry, lead...
posted on 1 Jun 2020
I applied via Naukri.com and was interviewed in May 2020. There were 4 interview rounds.
Die casting and machining defects are common in manufacturing processes.
Die casting defects include porosity, shrinkage, cold shuts, and flash.
Machining defects include burrs, chatter marks, and tool marks.
Die casting defects can be caused by improper temperature, pressure, or metal flow.
Machining defects can be caused by dull tools, improper speeds and feeds, or poor fixturing.
Defects can lead to part failure, reduced
Filling and high speed ratio formula is used to calculate the filling time of a container with a specific volume of liquid at a given flow rate.
Filling and high speed ratio formula is V/Q
V is the volume of the container and Q is the flow rate of the liquid
The formula is used to determine the time it takes to fill a container with a specific volume of liquid at a given flow rate
The higher the flow rate, the faster the c
based on 1 interview
Interview experience
Assistant Engineer
2.7k
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Engineer
1.8k
salaries
| ₹0 L/yr - ₹0 L/yr |
Diploma Trainee Engineer
931
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
412
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
366
salaries
| ₹0 L/yr - ₹0 L/yr |
DENSO
MAHLE Behr India
Sanden Vikas
Valeo