I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Tell about your technically experience
  • Ans. Explained about my experience in my previous projects
  • Answered Anonymously
Round 2 - Technical 

(1 Question)

  • Q1. Asked about cloud technology

Interview Preparation Tips

Interview preparation tips for other job seekers - Two rounds of interview,
Both rounds are technically, panelists are good , asked about your previous experience and high level on cloud technically.

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. 1m3 concrete use cement
  • Q2. 1sqm2 plaster use cement kg

Interview Questionnaire 

23 Questions

  • Q1. Bill of material of 1 KM 11 KV line
  • Ans. 

    The bill of material for a 1 KM 11 KV line includes various components such as conductors, insulators, transformers, and poles.

    • Conductors: Copper or aluminum cables used to transmit electricity.

    • Insulators: Materials like porcelain or polymer used to support and isolate the conductors.

    • Transformers: Devices used to step up or step down the voltage.

    • Poles: Structures to support the conductors and maintain their position.

    • Ot...

  • Answered by AI
  • Q2. Bill of material of 1 KM AB cable line
  • Ans. 

    The bill of material for a 1 KM AB cable line includes various components.

    • The cable itself

    • Insulators

    • Connectors

    • Poles or towers

    • Grounding equipment

    • Hardware such as bolts and clamps

    • Tools for installation

    • Safety equipment

    • Transportation costs

    • Labor costs

  • Answered by AI
  • Q3. Bill of material of 1KM underground line 33 KV ,11,KV,LT lines
  • Ans. 

    The bill of material for a 1KM underground line with 33KV, 11KV, and LT lines.

    • The bill of material should include all necessary components for the underground line.

    • Components may include cables, transformers, switchgear, and other electrical equipment.

    • The quantity of each component should be specified in the bill of material.

    • The bill of material should also include any necessary accessories such as clamps, connectors,

  • Answered by AI
  • Q4. Testing commissioning of RMU ,relay setting
  • Ans. 

    Testing and commissioning of RMU and relay setting is a crucial aspect of project engineering.

    • Testing and commissioning of RMU involves verifying the functionality of the switchgear and ensuring it is safe for operation.

    • Relay setting involves configuring the protection relays to ensure they operate correctly in the event of a fault.

    • Testing and commissioning should be carried out in accordance with relevant standards an...

  • Answered by AI
  • Q5. Transformer earthing
  • Q6. What is lightning arrestor
  • Ans. 

    A lightning arrestor is a device used to protect electrical equipment from lightning strikes.

    • It is also known as a surge arrester or lightning diverter.

    • It works by providing a low-impedance path for lightning current to flow to the ground.

    • It is commonly used in power distribution systems, telecommunication networks, and buildings.

    • Examples include metal oxide varistors, gas discharge tubes, and carbon block arrestors.

  • Answered by AI
  • Q7. Soil conductivity test
  • Q8. Transformer testing
  • Q9. ACSR conductor testing ABC testing Pannel testing Structure testing
  • Q10. Earthing Earthing of transformer Earthing of lightning arrester Earthing of sub station Earthing of single pole Earthing of pannels
  • Q11. What is discharge rods
  • Ans. 

    Discharge rods are grounding devices used to discharge static electricity from equipment or machinery.

    • Also known as grounding rods or earthing rods

    • Typically made of copper or aluminum

    • Used in industries such as oil and gas, chemical, and manufacturing

    • Prevents damage to equipment and potential safety hazards

    • Example: Discharge rods are commonly used in refineries to prevent explosions caused by static electricity buildup.

  • Answered by AI
  • Q12. Size of conductors Size of cables
  • Ans. 

    The size of conductors and cables is an important factor in determining their electrical properties and performance.

    • The size of a conductor is determined by its cross-sectional area, which affects its resistance and current-carrying capacity.

    • Cable size is determined by the current it needs to carry and the distance it needs to travel.

    • Larger conductors and cables can carry more current and have lower resistance, but may...

  • Answered by AI
  • Q13. What is GTP What is MQP What is FQP
  • Ans. 

    GTP is a protocol used in cellular communication. MQP and FQP are not commonly used acronyms.

    • GTP stands for GPRS Tunnelling Protocol

    • It is used in cellular communication to allow data transfer between different networks

    • MQP and FQP are not commonly used acronyms and may refer to specific organizations or products

  • Answered by AI
  • Q14. Transformer oil testing
  • Q15. Cable insulation testing Continuity testing High pot test
  • Q16. What is HDD machine
  • Ans. 

    HDD machine is a drilling machine used for horizontal directional drilling.

    • HDD stands for Horizontal Directional Drilling

    • It is used for underground drilling without disturbing the surface

    • It is commonly used for laying pipelines, cables, and conduits

    • The machine uses a drill stem and a drilling fluid to bore through the ground

    • It requires skilled operators and engineers to operate and plan the drilling process

  • Answered by AI
  • Q17. PSC pole STP pole RS joist pole Rail pole
  • Q18. HDPE PIPE GI PIPE PLB duct
  • Q19. Chemical earthing Electrical earthing
  • Q20. Jointing of cables Jointing of conductors
  • Ans. 

    Jointing of cables and conductors is a crucial aspect of project engineering.

    • Jointing involves connecting two or more cables or conductors to ensure continuity of electrical flow.

    • Various methods of jointing include crimping, soldering, and welding.

    • Factors such as the type of cable, voltage, and current capacity must be considered when selecting a jointing method.

    • Proper insulation and sealing of joints is essential to p...

  • Answered by AI
  • Q21. Tell me about yourself
  • Ans. 

    Experienced project engineer with a background in civil engineering and a passion for problem-solving and team collaboration.

    • Bachelor's degree in Civil Engineering

    • 5+ years of experience in project management

    • Proficient in AutoCAD and project management software

    • Strong communication and leadership skills

    • Successfully led a team in completing a major infrastructure project on time and within budget

  • Answered by AI
  • Q22. Previous company and project details
  • Q23. Salary discussion

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I applied via Walk-in

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Boq of 1 KM 11 kV line.
  • Q2. Boq of 1 km LT line
  • Ans. 

    BOQ of 1 km LT line is a document that lists all the items required for the construction of a 1 km low tension line.

    • BOQ stands for Bill of Quantities

    • The BOQ includes details of materials, quantities, and prices

    • The BOQ helps in estimating the total cost of the project

    • Example items in the BOQ for a 1 km LT line: conductor, insulators, poles, transformers, hardware fittings, etc.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare basics of site. 11 KV, LT, Distribution Transformer
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
-

I applied via Recruitment Consulltant and was interviewed in Sep 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Standerd size of brick
  • Ans. 

    Standard size of a brick is 3 5/8 inches x 2 1/4 inches x 8 inches.

    • Standard size of a brick is 3 5/8 inches x 2 1/4 inches x 8 inches

    • Brick sizes can vary slightly depending on the manufacturer or region

    • Bricks are commonly used in construction for building walls, pavements, and other structures

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Previous works related questions in detail.
  • Q2. Water supply related question will put in front of you, if you are working in the same field.
Round 3 - One-on-one 

(1 Question)

  • Q1. If clear the round 1 then 2nd round will not be much difficult for that person.
Round 4 - HR 

(1 Question)

  • Q1. Salary negotiations will done in this round.
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
No response

I applied via Walk-in and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. About yourself?
  • Q2. Power sector experience?

I applied via Naukri.com and was interviewed before Jul 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Coding Test 

Plsql,sql , sql queries, aptitude

Round 3 - One-on-one 

(1 Question)

  • Q1. Basic questions sql,plsql and java(I mentioned in my cv)

Interview Preparation Tips

Interview preparation tips for other job seekers - Just prepare the mentioned skills in resume.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in May 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Prepare all the things related to your work
Round 3 - One-on-one 

(1 Question)

  • Q1. General discussion about my life and sallery.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Mar 2023. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Lte architecture and ip based questions
Round 3 - Technical 

(1 Question)

  • Q1. Lte architecture, ip based
Round 4 - Technical 

(1 Question)

  • Q1. Lte architecture and ip
Round 5 - HR 

(1 Question)

  • Q1. What is region for job change and salary expectations

Sterlite Technologies Interview FAQs

How many rounds are there in Sterlite Technologies Devops Engineer interview?
Sterlite Technologies interview process usually has 2 rounds. The most common rounds in the Sterlite Technologies interview process are Technical.
How to prepare for Sterlite Technologies Devops Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Sterlite Technologies. The most common topics and skills that interviewers at Sterlite Technologies expect are Ansible, Jenkins, Devops, Shell Scripting and Docker.

Tell us how to improve this page.

Interview Questions from Similar Companies

Cisco Interview Questions
4.2
 • 374 Interviews
Indus Towers Interview Questions
3.8
 • 181 Interviews
Nvidia Interview Questions
3.7
 • 104 Interviews
BT Business Interview Questions
4.0
 • 80 Interviews
Tejas Networks Interview Questions
4.0
 • 75 Interviews
Arista Networks Interview Questions
4.2
 • 43 Interviews
Redington Interview Questions
4.0
 • 34 Interviews
View all
Sterlite Technologies Devops Engineer Salary
based on 36 salaries
₹2.8 L/yr - ₹12.2 L/yr
15% less than the average Devops Engineer Salary in India
View more details

Sterlite Technologies Devops Engineer Reviews and Ratings

based on 6 reviews

2.5/5

Rating in categories

2.6

Skill development

2.8

Work-life balance

3.5

Salary

2.3

Job security

2.3

Company culture

2.5

Promotions

2.5

Work satisfaction

Explore 6 Reviews and Ratings
Process Associate
655 salaries
unlock blur

₹2 L/yr - ₹5.6 L/yr

Field Engineer
290 salaries
unlock blur

₹2.4 L/yr - ₹6.1 L/yr

Senior Software Engineer
245 salaries
unlock blur

₹5.8 L/yr - ₹16 L/yr

Technical Lead
215 salaries
unlock blur

₹9.6 L/yr - ₹27.2 L/yr

Associate Officer
215 salaries
unlock blur

₹3 L/yr - ₹7.9 L/yr

Explore more salaries
Compare Sterlite Technologies with

Indus Towers

3.8
Compare

Cisco

4.2
Compare

BT Business

4.0
Compare

Lumen Technologies

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview