Filter interviews by
I appeared for an interview before Feb 2024.
Production line can stop due to various reasons such as equipment malfunction, shortage of raw materials, human error, or maintenance issues.
Equipment malfunction
Shortage of raw materials
Human error
Maintenance issues
I applied via Naukri.com and was interviewed in May 2022. There were 5 interview rounds.
I applied via Recruitment Consulltant and was interviewed in May 2024. There were 2 interview rounds.
Jigs guide the cutting tool, while fixtures hold the workpiece in place during machining.
Jigs are used to guide the cutting tool, ensuring accuracy and repeatability.
Fixtures are used to hold the workpiece in place during machining operations.
Jigs are often used in drilling, tapping, and reaming operations.
Fixtures are commonly used in milling, grinding, and welding processes.
Mould flow analysis is a simulation technique used to predict how molten plastic will flow in a mold during the injection molding process.
Helps optimize the design of the mold and the injection molding process
Identifies potential issues such as air traps, weld lines, and sink marks
Allows for adjustments to be made before physical production begins
Can improve part quality and reduce manufacturing costs
Cp and Cpk are process capability indices used to assess the ability of a process to produce output within specification limits.
Cp is a measure of process capability that compares the spread of the process to the width of the specification limits.
Cpk takes into account the centering of the process within the specification limits as well.
Higher values of Cp and Cpk indicate better process capability.
For Cp, a value of 1...
PPAP typically consists of 18 documents including items like control plans, FMEAs, and PSWs.
PPAP typically consists of 18 documents
Some key documents in PPAP include control plans, FMEAs, PSWs, and dimensional results
Each document serves a specific purpose in ensuring product quality and compliance
To improve your personality, focus on communication skills, empathy, positivity, and self-awareness.
Work on improving your communication skills by actively listening, speaking clearly, and being assertive.
Practice empathy by putting yourself in others' shoes and showing understanding and compassion.
Maintain a positive attitude, even in challenging situations, to inspire and uplift those around you.
Increase self-awarene...
I appeared for an interview before Jan 2024.
Total runout is the combination of radial and axial runout, while runout refers to the deviation of a surface from a true circular path.
Total runout includes both radial and axial components of runout.
Runout specifically refers to the deviation of a surface from a true circular path.
Total runout is a more comprehensive measurement of overall part quality.
Runout is typically measured using a dial indicator or similar to...
8D is a problem-solving methodology used to identify, correct, and prevent recurring problems in manufacturing processes.
8D stands for Eight Disciplines
It is commonly used in the automotive industry
Each of the 8 disciplines represents a step in the problem-solving process, from defining the problem to preventing recurrence
Examples of the 8 disciplines include creating a team, defining the problem, implementing short-te...
Use a straight edge or surface plate to check flatness of uneven surface.
Use a straight edge or surface plate to check for any gaps or rocking on the surface
Measure the deviation from flatness using feeler gauges or dial indicators
Check for any high spots or low spots on the surface
Repeat the process in multiple directions to ensure overall flatness
I applied via Naukri.com
I applied via Naukri.com and was interviewed in Aug 2023. There were 4 interview rounds.
Core tools of AIAG include FMEA, PPAP, MSA, SPC, and APQP.
FMEA (Failure Mode and Effects Analysis) is used to identify and prioritize potential failure modes in a process.
PPAP (Production Part Approval Process) is used to ensure that suppliers meet customer requirements.
MSA (Measurement Systems Analysis) is used to assess the quality of measurement systems.
SPC (Statistical Process Control) is used to monitor and contro...
I have experienced failures in project deadlines, communication, and technical solutions.
Missed project deadlines due to underestimating tasks
Miscommunication with team members leading to misunderstandings
Implemented technical solutions that did not meet requirements
Heat treatment process is a method used to alter the physical and sometimes chemical properties of a material through heating and cooling.
Involves heating the material to a specific temperature
Holding it at that temperature for a set amount of time
Then cooling it at a controlled rate
Can be used to increase hardness, improve machinability, or enhance other properties
Common techniques include annealing, quenching, temper
I applied via Walk-in and was interviewed in Jun 2021. There were 5 interview rounds.
I applied via Naukri.com and was interviewed in Dec 2023. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
NPD Engineer
7
salaries
| ₹2.5 L/yr - ₹4.2 L/yr |
Area Sales Manager
5
salaries
| ₹2.2 L/yr - ₹4.5 L/yr |
MIS Executive
5
salaries
| ₹2.4 L/yr - ₹3.2 L/yr |
Quality Manager /MR
4
salaries
| ₹5.2 L/yr - ₹14 L/yr |
Rubber Technologist
4
salaries
| ₹3 L/yr - ₹9.1 L/yr |
ZF Steering Gear
Ag Industries
Toyoda Gosei Minda
Ralson Tyres Limited