Upload Button Icon Add office photos

Filter interviews by

Steel Engineering Technology Maintenance Manager Interview Questions and Answers

Updated 11 Oct 2023

Steel Engineering Technology Maintenance Manager Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Case Study 

I found my job via LinkedIn through MD contect discussion asked my past experience, viewed my LinkedIn profile, my experience certificate verified and talked me in phonic interview from qatar to india via wattsup. I selected i worked well and modified too machines etc.

Round 3 - One-on-one 

(2 Questions)

  • Q1. Past my experience, certificate verification and my kirby kuwait experience count, sSL kenya work counted.
  • Q2. Past my experience confirmation and related topic.

Interview Preparation Tips

Interview preparation tips for other job seekers - LinkedIn is the best platform for your jobs without any investment. 🙏

Interview questions from similar companies

I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Basic based on work related
Round 2 - HR 

(1 Question)

  • Q1. About salary discuss

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared for basic of technical & work related
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. About hydroulic system of your plant
Round 2 - One-on-one 

(1 Question)

  • Q1. What is the tecnic of manager
  • Ans. 

    The technique of a maintenance manager involves planning, organizing, directing, and controlling maintenance activities.

    • A maintenance manager should have strong leadership and communication skills.

    • They should be able to prioritize tasks and manage time effectively.

    • They should have knowledge of maintenance procedures and equipment.

    • They should be able to analyze data and make informed decisions.

    • They should be able to mot...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Dec 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Hard core technical question? Hydraulic calculations? Bearing types? Electrode type?
  • Q2. Bearing types? Alignment methods?

Interview Preparation Tips

Interview preparation tips for other job seekers - Go with technical knowledge
Hr questions
Better self intro
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Gear box replacement work

Round 2 - HR 

(5 Questions)

  • Q1. Discharge chute replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old discharge chute remove and new discharge chute replace and bolt nut ti...
  • Q2. Barring checking and replacement work and safety first and paper work and walked away clean and fresh and try out and blumber block top cover open and old slue barring remove and new slue barring fix and n...
  • Q3. Motor replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old motor remove and new motor replace and bolt nut tightening sure and dayal guage ...
  • Q4. Gear box replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old gear box remove and new gear box replace and bolt nut tightening sure and day...
  • Q5. V-scraper replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old v-scraper remove and new v-scraper replace and bolt nut tightening sure and ...

Interview Preparation Tips

Topics to prepare for ArcelorMittal Nippon Steel Assistant Manager Maintenance interview:
  • Gear box replacement work
Interview preparation tips for other job seekers - Because of the growth of opportunity and advancement
Interview experience
1
Bad
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. What is your qualification?
  • Ans. 

    Bachelor's degree in Mechanical Engineering with 5 years of experience in maintenance and troubleshooting of mechanical systems.

    • Bachelor's degree in Mechanical Engineering

    • 5 years of experience in maintenance and troubleshooting

    • Proficient in analyzing mechanical systems and implementing solutions

  • Answered by AI
  • Q2. Are you willing to work 12 hours?
  • Ans. 

    Yes, I am willing to work 12 hours as needed for the job.

    • I am committed to meeting the demands of the job, including working long hours when necessary.

    • I understand the importance of completing tasks on time and am willing to put in the extra hours to ensure that.

    • I have previous experience working long shifts and am comfortable with the schedule.

    • I am dedicated to my work and will prioritize the job requirements over per

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - This company is one of the worst company and here working hours are more than 12 hours so employees are leaving this company within a two years, this plant is located in Karnataka but here kannadigas are slave up Telugu speaking management.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(13 Questions)

  • Q1. What is relay what do work
  • Ans. 

    A relay is an electrical device that acts as a switch to control the flow of current in an electrical circuit.

    • Relays are used to control high-power devices with low-power signals.

    • They consist of an electromagnet and a set of contacts.

    • When the electromagnet is energized, it creates a magnetic field that attracts or releases the contacts, allowing or interrupting the flow of current.

    • Relays are commonly used in industrial...

  • Answered by AI
  • Q2. What is reverse forward draw the control wirring
  • Ans. 

    Reverse forward draw is a control wiring method used in electrical systems to control the direction of rotation of a motor.

    • Reverse forward draw is used to control the direction of rotation of a motor.

    • It involves the use of a forward contactor and a reverse contactor.

    • The control wiring includes connections between the contactors, motor, and power supply.

    • By energizing the forward contactor, the motor rotates in one direc...

  • Answered by AI
  • Q3. What is ac motor
  • Ans. 

    An AC motor is a type of electric motor that operates on alternating current.

    • AC motor stands for Alternating Current motor.

    • It converts electrical energy into mechanical energy.

    • AC motors are commonly used in household appliances, industrial machinery, and vehicles.

    • They are more efficient and require less maintenance compared to DC motors.

    • Examples of AC motors include induction motors, synchronous motors, and brushless m

  • Answered by AI
  • Q4. What is different between ac and dc motor
  • Ans. 

    AC motors and DC motors differ in their power source, construction, speed control, and applications.

    • AC motors run on alternating current, while DC motors run on direct current.

    • AC motors are more commonly used in household appliances, industrial machinery, and electric vehicles.

    • DC motors are often found in battery-powered devices, such as laptops, electric cars, and robots.

    • AC motors have a simpler construction with fewe...

  • Answered by AI
  • Q5. What is. MCB
  • Ans. 

    MCB stands for Miniature Circuit Breaker.

    • MCB is an electrical switch that automatically interrupts the flow of current in an electrical circuit during an overload or short circuit.

    • It is a type of circuit breaker that is commonly used in residential and commercial buildings.

    • MCBs are designed to protect electrical circuits and appliances from damage caused by excessive current.

    • They are compact in size and can be easily i...

  • Answered by AI
  • Q6. What is timer what do work
  • Ans. 

    A timer is a device that measures and controls the passage of time.

    • A timer is used to initiate or stop a process at a specific time or after a specific duration.

    • Timers can be mechanical or electronic.

    • They are commonly used in various applications such as appliances, industrial machinery, and automation systems.

    • Examples of timers include kitchen timers, programmable thermostats, and countdown timers in sports events.

  • Answered by AI
  • Q7. What is VFD
  • Ans. 

    VFD stands for Variable Frequency Drive.

    • VFD is an electronic device used to control the speed and torque of an electric motor.

    • It adjusts the frequency and voltage supplied to the motor, allowing for precise control of motor speed.

    • VFDs are commonly used in industrial applications to save energy, improve motor performance, and enable soft starting and stopping.

    • They are also known as AC drives, adjustable speed drives, or...

  • Answered by AI
  • Q8. What is PLC what do work
  • Ans. 

    PLC stands for Programmable Logic Controller. It is a digital computer used for automation of electromechanical processes.

    • PLC is a specialized computer designed to control industrial processes.

    • It uses a programmable memory to store instructions and execute them in a sequential manner.

    • PLCs are commonly used in manufacturing plants, power stations, and other industrial settings.

    • They can be programmed to control various d...

  • Answered by AI
  • Q9. What is ac motor
  • Ans. 

    An AC motor is a type of electric motor that operates on alternating current.

    • AC motor stands for alternating current motor.

    • It converts electrical energy into mechanical energy.

    • AC motors are commonly used in household appliances, industrial machinery, and vehicles.

    • They are more efficient and require less maintenance compared to DC motors.

    • Examples of AC motors include induction motors, synchronous motors, and brushless m

  • Answered by AI
  • Q10. What is rectifier
  • Ans. 

    A rectifier is an electrical device that converts alternating current (AC) to direct current (DC).

    • Rectifiers are commonly used in power supplies to convert AC voltage to DC voltage.

    • They are made up of diodes, which allow current to flow in only one direction.

    • Rectifiers can be half-wave or full-wave, depending on the number of diodes used.

    • Examples of rectifiers include bridge rectifiers, vacuum tube rectifiers, and soli

  • Answered by AI
  • Q11. What is. diode
  • Ans. 

    A diode is an electronic component that allows current to flow in one direction and blocks it in the opposite direction.

    • Diodes are commonly used in rectifier circuits to convert AC to DC.

    • They have two terminals: an anode (positive) and a cathode (negative).

    • When the voltage across a diode is forward-biased, it allows current to flow.

    • When the voltage is reverse-biased, it blocks the current.

    • Diodes are often used for volt...

  • Answered by AI
  • Q12. What is plc working
  • Ans. 

    PLC stands for Programmable Logic Controller. It is a digital computer used for automation of electromechanical processes.

    • PLC is used to control and monitor industrial processes.

    • It is programmed using ladder logic or other programming languages.

    • PLCs are commonly used in manufacturing, power plants, and transportation systems.

    • They can be used to control motors, valves, sensors, and other devices.

    • PLCs provide real-time m...

  • Answered by AI
  • Q13. What is timer
  • Ans. 

    A timer is a device or software that measures and controls the passage of time.

    • A timer can be a physical device with buttons and a display, or it can be a software program on a computer or smartphone.

    • Timers are commonly used in various applications such as cooking, sports, and industrial processes.

    • They can be set to count down from a specific time or count up from zero.

    • Some timers have additional features like alarms, ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I am raja kushwaha I have five years experience I do diploma electrical engineering

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Working principal of pump
  • Ans. 

    Pumps work by creating a pressure difference to move fluid from one place to another.

    • Pumps use mechanical energy to increase the pressure of a fluid and move it through a system

    • They can be classified into different types such as centrifugal pumps, positive displacement pumps, etc.

    • The working principle involves the conversion of mechanical energy into hydraulic energy

    • Examples include water pumps in buildings, fuel pumps

  • Answered by AI
  • Q2. What is working principal of cooling tower
  • Ans. 

    Cooling towers work on the principle of evaporative cooling to remove heat from a process or building.

    • Cooling towers use water as a cooling medium to absorb heat from a process or building.

    • The hot water is pumped to the top of the tower and distributed over the fill media.

    • As the water flows over the fill media, some of it evaporates, taking away heat and cooling the rest of the water.

    • The cooled water is then collected ...

  • Answered by AI
  • Q3. Pollution bag filter specifications
  • Ans. 

    Pollution bag filter specifications include material type, filtration efficiency, airflow capacity, and pressure drop.

    • Material type: Bag filters can be made of various materials such as polyester, polypropylene, or fiberglass.

    • Filtration efficiency: This indicates the percentage of particles the filter can capture. Higher efficiency filters are more effective but may have higher pressure drops.

    • Airflow capacity: The maxi...

  • Answered by AI
  • Q4. Softner water parameter
  • Q5. What is the formula of centrifugal pump head
  • Ans. 

    The formula for centrifugal pump head is H = (Q * SG) / (3.14 * D^2 * 2.31)

    • Head (H) is calculated using the flow rate (Q), specific gravity (SG), and diameter of the impeller (D)

    • The formula is derived from the basic equation for head in a centrifugal pump

    • Example: H = (100 gpm * 1.0) / (3.14 * 0.5^2 * 2.31) = 45.75 ft

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - To prepare technical question and answer
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Pump main tenec
  • Q2. Machine maintenance
Round 2 - Technical 

(2 Questions)

  • Q1. Machanical work
  • Q2. Crean maintenance
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Ptm all parts Reapair
  • Q2. Bearing, Neumatic cyclender
  • Q3. Hydrolic cyclender
  • Q4. Wheel reapair, Gear box

Interview Preparation Tips

Interview preparation tips for other job seekers - Name- Susanta naik
At-Dulesara Dist- Jharsuguda
Mob-XXXXX
*****

Steel Engineering Technology Interview FAQs

How many rounds are there in Steel Engineering Technology Maintenance Manager interview?
Steel Engineering Technology interview process usually has 3 rounds. The most common rounds in the Steel Engineering Technology interview process are One-on-one Round, Resume Shortlist and Case Study.

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Steel Interview Questions
4.1
 • 818 Interviews
JSW Steel Interview Questions
3.9
 • 560 Interviews
Jindal Stainless Interview Questions
4.2
 • 197 Interviews
JSW Group Interview Questions
3.9
 • 105 Interviews
Jindal Saw Interview Questions
4.0
 • 97 Interviews
Rashmi Metaliks Interview Questions
3.5
 • 75 Interviews
Viraj Profiles Interview Questions
3.8
 • 71 Interviews
View all

Steel Engineering Technology Maintenance Manager Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

3.0

Skill development

4.0

Work-Life balance

4.0

Salary & Benefits

4.0

Job Security

5.0

Company culture

4.0

Promotions/Appraisal

4.0

Work Satisfaction

Explore 1 Review and Rating
Maintenance Manager
3 salaries
unlock blur

₹15 L/yr - ₹15 L/yr

Explore more salaries
Compare Steel Engineering Technology with

Tata Steel

4.1
Compare

JSW Steel

3.9
Compare

Jindal Steel and Power

4.0
Compare

ArcelorMittal Nippon Steel

4.1
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview