Upload Button Icon Add office photos

Stanley Black & Decker

Compare button icon Compare button icon Compare

Filter interviews by

Stanley Black & Decker Billing Engineer Interview Questions and Answers

Be the first one to contribute and help others!

Interview questions from similar companies

I applied via Recruitment Consultant and was interviewed in Mar 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Questions were related to the post John Deere were offering to candidates. For me it was Diagnostics Author position.

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be aware that answer as simple as you can.
If you don't know the answer don't try to attempt simply say that you don't know and assure interviewer that if you ll get a chance you will definitely answer that.

Be optimistic and attentive.

I applied via Company Website and was interviewed in Jan 2018. There were 2 interview rounds.

Interview Preparation Tips

Round: Test
Experience: technical round
no. of questions 30

Round: Test
Experience: Questions related to NPD
no. of questions 10


Round: Test
Experience: VP Round
all questions reated to job 10


Round: Test
Experience: HR round ..

General Tips: Know the JD before interview
Skills: Communication, Body Language, Decision Making Skills
Duration: 1-4 weeks

I applied via Recruitment Consultant and was interviewed in Mar 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Questions will be related to the post which company is offering.
  • Q2. Should be very accurate to all electronics queries

Interview Preparation Tips

Interview preparation tips for other job seekers - Be smart and to the point answers will help.

I applied via Recruitment Consultant and was interviewed in Jul 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. CNC programming

Interview Preparation Tips

Interview preparation tips for other job seekers - Be very technical

I applied via Referral and was interviewed before Jun 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Questions on Process,Simulation, CAD

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Nov 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. What is your highest qualification
  • Ans. 

    My highest qualification is a Master's degree in Electrical Engineering.

    • Master's degree in Electrical Engineering

    • Specialized in power systems

    • Thesis focused on renewable energy integration

    • Completed advanced courses in control systems

    • Published research papers in IEEE conferences

  • Answered by AI
Round 3 - Technical 

(1 Question)

  • Q1. What is your role and responsibilities in the project quality?
  • Ans. 

    As a Senior Engineer, my role in project quality is to ensure that all deliverables meet the required standards and specifications.

    • Developing and implementing quality assurance processes and procedures

    • Conducting regular audits and inspections to identify any quality issues

    • Collaborating with cross-functional teams to address and resolve quality concerns

    • Creating and maintaining quality documentation, including test plans...

  • Answered by AI

I applied via Walk-in and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Explain Compilation process steps?
  • Ans. 

    Compilation process involves several steps to convert source code into executable code.

    • Preprocessing: Includes header file inclusion, macro expansion, and conditional compilation.

    • Compilation: Translates source code into assembly code.

    • Assembly: Converts assembly code into machine code.

    • Linking: Combines object files and libraries to create an executable file.

    • Loading: Loads the executable file into memory and prepares it

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well prior the interview, revise all the basic concepts of Embedded C and MATLAB if you have applied for embedded systems.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About Basic work and basic concept of engineering and related to engine application.
Round 3 - One-on-one 

(1 Question)

  • Q1. Your interpersonal skills and related to behaviour , situation base understanding.
Round 4 - HR 

(1 Question)

  • Q1. Not much regarding salary aspects

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well,be yourself and confident.Dont hide anything . policy are strick.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Latest trends in welding
  • Ans. 

    Some latest trends in welding include automation, additive manufacturing, and advancements in materials.

    • Automation in welding processes to increase efficiency and precision

    • Additive manufacturing techniques like 3D printing being used in welding for complex geometries

    • Advancements in materials like high-strength steels and aluminum alloys for improved weld quality

  • Answered by AI
  • Q2. Explain Gmaw welding
  • Ans. 

    Gmaw welding stands for Gas Metal Arc Welding, a welding process that uses a continuous solid wire electrode and shielding gas to protect the weld pool from contamination.

    • Uses a continuous solid wire electrode as filler material

    • Shielding gas is used to protect the weld pool from contamination

    • Commonly used in industries like automotive, construction, and manufacturing

  • Answered by AI
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - One-on-one 

(2 Questions)

  • Q1. Technical trainings, working of engine, part location and identification
  • Q2. Making pots, ms office skills
Round 2 - One-on-one 

(1 Question)

  • Q1. Work ethics, project management, ms office usage skills, data automation skills, etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Get the job description clarified properly without any errors or confuion, because their hiring agent exotalent has a reputation of giving out erraneous job description and the job offered will be completely different from expected, and surprisingly your job roles will not be present in the offer letter.

Tell us how to improve this page.

Interview Questions from Similar Companies

ABB Interview Questions
4.1
 • 243 Interviews
John Deere Interview Questions
4.1
 • 237 Interviews
Caterpillar Inc Interview Questions
4.2
 • 178 Interviews
KONE Interview Questions
4.1
 • 109 Interviews
Atlas Copco Interview Questions
4.2
 • 85 Interviews
Hitachi Interview Questions
4.0
 • 82 Interviews
TÜV SÜD Interview Questions
3.9
 • 65 Interviews
TKIL Interview Questions
4.2
 • 59 Interviews
View all
Area Sales Manager
40 salaries
unlock blur

₹6.7 L/yr - ₹19.8 L/yr

Production Engineer
40 salaries
unlock blur

₹1.2 L/yr - ₹4.5 L/yr

Junior Technician
35 salaries
unlock blur

₹1.8 L/yr - ₹3.8 L/yr

Trainee
34 salaries
unlock blur

₹1.2 L/yr - ₹2.2 L/yr

Maintenance Engineer
28 salaries
unlock blur

₹1.6 L/yr - ₹7.5 L/yr

Explore more salaries
Compare Stanley Black & Decker with

John Deere

4.1
Compare

ABB

4.1
Compare

KONE

4.1
Compare

Caterpillar Inc

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview