Upload Button Icon Add office photos

Filter interviews by

SSV Construction Site Engineer Interview Questions and Answers

Updated 1 Nov 2023

SSV Construction Site Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Tell me abaut your self
Round 3 - Technical 

(1 Question)

  • Q1. Tell me abaut Slump test
  • Ans. 

    Slump test is a concrete consistency test to measure the workability of fresh concrete.

    • It involves filling a cone-shaped mold with fresh concrete, then removing the mold and measuring the amount of slump or settlement.

    • The slump value indicates the consistency of the concrete - higher slump means more workable concrete.

    • Different slump values are required for different types of construction projects.

    • The test helps ensure...

  • Answered by AI

Interview questions from similar companies

I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Tell me about yourself.
  • Q2. Asked me my work experience and my education.
Round 2 - HR 

(1 Question)

  • Q1. About My work experince and my education and my knowledge.
Round 3 - One-on-one 

(2 Questions)

  • Q1. About my work experience and my education and my knowledge.
  • Q2. My Interoduction and my

Interview Preparation Tips

Interview preparation tips for other job seekers - I am very honesty and hord working person.

Interview Questionnaire 

1 Question

  • Q1. He just asked how much will you take?

Interview Preparation Tips

Round: HR Interview
Experience: Nothing much, they are all concerned about money.
Tips: Just tell them as per company standard.

Interview Questionnaire 

3 Questions

  • Q1. Coke oven and blast furnace technical lining questions
  • Q2. Site management cost control
  • Q3. How to Time saving
  • Ans. 

    Time saving can be achieved by optimizing processes, using technology, delegating tasks, and setting priorities.

    • Optimize processes to eliminate inefficiencies and reduce wasted time

    • Utilize technology tools to automate repetitive tasks and streamline workflows

    • Delegate tasks to team members to distribute workload and free up time for higher priority tasks

    • Set clear priorities and focus on important tasks to avoid wasting

  • Answered by AI

I appeared for an interview in Aug 2019.

Interview Questionnaire 

4 Questions

  • Q1. How many types of structure
  • Ans. 

    There are various types of structures, including buildings, bridges, dams, tunnels, and towers.

    • Structures can be classified based on their purpose, design, and materials used.

    • Buildings can be further classified into residential, commercial, and industrial structures.

    • Bridges can be classified into beam, arch, suspension, and cable-stayed bridges.

    • Dams can be classified into gravity, arch, buttress, and embankment dams.

    • Tu...

  • Answered by AI
  • Q2. What is density
  • Ans. 

    Density is the measure of mass per unit volume of a substance.

    • It is a physical property of matter.

    • It is calculated by dividing the mass of a substance by its volume.

    • Units of density include kg/m³, g/cm³, and lb/ft³.

    • Density can be used to identify substances and determine their purity.

    • For example, gold has a density of 19.3 g/cm³, while aluminum has a density of 2.7 g/cm³.

  • Answered by AI
  • Q3. How many types of density construction
  • Ans. 

    There are two types of density construction: compacted and loose.

    • Compacted density construction involves compressing the material to increase its density, such as in road construction.

    • Loose density construction involves leaving the material in its natural state, such as in landscaping.

    • The type of density construction used depends on the intended use of the material and the desired level of compaction.

    • Other factors that...

  • Answered by AI
  • Q4. Which types of tests construction joint
  • Ans. 

    Tests for construction joints include visual inspection, water tightness test, and load transfer test.

    • Visual inspection to check for proper joint alignment and sealant application

    • Water tightness test to ensure no water leakage through the joint

    • Load transfer test to verify the joint can handle the intended load

    • Other tests may include pull-out test, shear test, and compression test

    • Testing frequency and methods may vary d...

  • Answered by AI

Skills evaluated in this interview

I applied via Campus Placement and was interviewed before Feb 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Why are you looking for a change?
  • Q2. What are your salary expectations?
  • Q3. Why should we hire you?
Round 3 - One-on-one 

(1 Question)

  • Q1. What you know about core?
  • Ans. 

    Core is the central part of a structure or object that provides strength and stability.

    • Core is commonly used in construction and engineering.

    • It is the central part of a building or structure that provides support and stability.

    • In fitness, core refers to the muscles in the abdomen, back, and pelvis that support the spine.

    • Examples of core materials include concrete, steel, and wood.

    • A strong core is important for maintain

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident on what you know.

Skills evaluated in this interview

I applied via Campus Placement and was interviewed before Mar 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical Questions branch related
Round 3 - Group Discussion 

HR technical department group discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - KEC company is a very good company it sees all the employees with one eye and has good behavior

Interview Questionnaire 

1 Question

  • Q1. What is production?
  • Ans. 

    Production refers to the process of creating goods or services using resources and labor.

    • Production involves transforming raw materials into finished products or providing services to customers.

    • It includes activities such as manufacturing, assembly, packaging, and distribution.

    • Examples of production include car manufacturing, food processing, and software development.

    • Efficient production is essential for businesses to

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Concrete related in details
  • Q2. Soil types soil investigations related
  • Ans. Details of soil types, investigation methods
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare for soil concrete related technical in details
Interview experience
4
Good
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. What is the ratio of M 25 you have used in your project?
  • Ans. 

    The ratio of M 25 used in the project is 1:1:2.

    • The ratio of M 25 concrete is 1 part cement, 1 part fine aggregates, and 2 parts coarse aggregates.

    • This ratio ensures the desired strength and durability of the concrete mix.

    • For example, if we need to prepare 1 cubic meter of M 25 concrete, we would use 350 kg of cement, 350 kg of fine aggregates, and 700 kg of coarse aggregates.

  • Answered by AI
Round 3 - HR 

(3 Questions)

  • Q1. What is salary expectation?
  • Ans. Tell him your expected gross salary monthly/annual.
  • Answered Anonymously
  • Q2. What is your current salary?
  • Q3. Tell him truthly your salary per month/annual

Interview Preparation Tips

Topics to prepare for Nagarjuna Construction Company Site Engineer interview:
  • RCC
  • Reinforcement
  • Brick Work
  • Plastering
  • Form work
  • Layout
  • Drawing
Interview preparation tips for other job seekers - Prepare your past and current role and responsibilities what ever you doing.

SSV Construction Interview FAQs

How many rounds are there in SSV Construction Site Engineer interview?
SSV Construction interview process usually has 3 rounds. The most common rounds in the SSV Construction interview process are Resume Shortlist, HR and Technical.

Tell us how to improve this page.

SSV Construction Site Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
SSV Construction Site Engineer Salary
based on 4 salaries
₹0.5 L/yr - ₹2 L/yr
68% less than the average Site Engineer Salary in India
View more details

SSV Construction Site Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Site Engineer
4 salaries
unlock blur

₹0.4 L/yr - ₹2 L/yr

Civil Site Engineer
4 salaries
unlock blur

₹2 L/yr - ₹2 L/yr

Civil Engineer
4 salaries
unlock blur

₹1.2 L/yr - ₹3.2 L/yr

Explore more salaries
Compare SSV Construction with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview