I applied via Recruitment Consulltant and was interviewed before Jun 2022. There were 2 interview rounds.
Rate analysis for brick work involves calculating the cost of materials, labor, and equipment for a specific quantity of brick work.
Determine the quantity of bricks required for the work
Calculate the cost of bricks per unit
Estimate the cost of labor and equipment needed for the work
Add all costs together to get the total cost of the brick work
Rates of materials refer to the cost of various construction materials used in a project.
Rates of materials can vary depending on factors such as location, quality, and quantity needed.
It is important for a Quantity Surveyor to accurately estimate the rates of materials to ensure the project stays within budget.
Examples of materials with varying rates include concrete, steel, timber, and insulation.
Quantity Surveyors m...
Top trending discussions
based on 1 interview
Interview experience
Civil Site Engineer
7
salaries
| ₹1.8 L/yr - ₹5.6 L/yr |
Accountant
4
salaries
| ₹2.2 L/yr - ₹3.2 L/yr |
Site Engineer
4
salaries
| ₹2.1 L/yr - ₹2.4 L/yr |
Executive Accountant
4
salaries
| ₹3 L/yr - ₹5 L/yr |
Senior Engineer
3
salaries
| ₹6 L/yr - ₹6 L/yr |
TCS
Accenture
Wipro
Cognizant