i
Spar Geo Infra
Filter interviews by
I applied via Approached by Company and was interviewed in May 2023. There were 3 interview rounds.
Maintenance of construction plant & machinery is of significant importance for ensuring operational efficiency and safety.
Regular maintenance schedules should be established to prevent breakdowns and ensure optimal performance.
Proper lubrication, cleaning, and inspection of critical components are essential for longevity.
Training staff on proper maintenance procedures can help in early detection of issues and prevent c...
To ensure high availability percentage of construction plant & machinery, I will implement a proactive maintenance schedule, conduct regular inspections, invest in quality equipment, and have a contingency plan in place.
Implement a proactive maintenance schedule to prevent breakdowns and ensure optimal performance
Conduct regular inspections to identify any potential issues early on
Invest in quality equipment that is re...
Yes, I can organize the operation and repair of all machineries in the central workshop and 6 projects.
Create a maintenance schedule for all machineries in the central workshop and projects
Assign specific technicians or teams to handle maintenance and repairs for each machinery
Ensure all necessary spare parts and tools are available for maintenance and repairs
Regularly inspect and monitor the condition of all machineri...
Yes, I am agree to manage the operation and repair of all construction plant-machinery in the Central Workshop and 6 projects.
Experience in managing operation and repair of construction plant-machinery
Ability to oversee multiple projects simultaneously
Knowledge of maintenance schedules and procedures
Strong leadership and communication skills
Experience in budgeting and resource allocation
Example: Successfully managed op...
I applied via Approached by Company and was interviewed in May 2023. There were 2 interview rounds.
Maintenance is a critical aspect of ensuring the reliability and efficiency of mechanical systems.
Maintenance plays a crucial role in preventing breakdowns and ensuring optimal performance of equipment.
Regular maintenance can extend the lifespan of machinery and reduce overall operating costs.
Proper maintenance schedules and procedures are essential for minimizing downtime and maximizing productivity.
Maintenance also c...
Yes, I will organize the repair and maintenance of construction plant and machinery available on the central workshop and 6 projects.
I will create a maintenance schedule for all the construction plant and machinery.
I will ensure that regular inspections and preventive maintenance are carried out.
I will coordinate with the central workshop and project teams to prioritize and schedule repairs.
I will maintain a record of ...
Yes, I am agreeable to join with an annual salary of Rs 7.2 Lakhs.
I am excited to join the team at the offered salary.
I am ready to start immediately.
I believe my skills and experience align well with the role.
I am looking forward to contributing to the company's success.
I applied via Company Website and was interviewed before Jun 2023. There were 2 interview rounds.
Preventive maintenance of construction plant-machinery is of utmost importance, with a significance of 100%.
Preventive maintenance helps in reducing unexpected breakdowns and costly repairs.
Regular maintenance ensures optimal performance and longevity of the machinery.
It enhances safety for workers and prevents accidents on the construction site.
Proper maintenance also helps in maintaining the resale value of the equip...
Yes, I will organize the maintenance of construction plant & machinery for the Central Workshop and 6 construction projects.
Develop a maintenance schedule for all plant and machinery
Coordinate with maintenance team to ensure timely repairs and servicing
Keep track of inventory and order necessary parts and supplies
Implement safety protocols to prevent accidents and ensure compliance with regulations
I applied via Approached by Company and was interviewed in May 2023. There were 2 interview rounds.
Objective questions.
Preventive maintenance should ideally account for 70-80% of overall maintenance activities.
Preventive maintenance should ideally account for 70-80% of overall maintenance activities.
Regularly scheduled inspections and maintenance tasks can help prevent breakdowns and extend equipment lifespan.
Examples of preventive maintenance tasks include lubrication, filter replacements, and equipment calibration.
My plan is to ensure a minimum of 95% availability of Construction Plant & Machinery through regular maintenance, timely repairs, and efficient utilization.
Implement a preventive maintenance schedule to minimize breakdowns and downtime
Regularly inspect and service all machinery to identify and address any issues early on
Train staff on proper operation and maintenance procedures to prevent misuse and damage
Have spare pa...
Yes, I have experience managing the Operation Maintenance of Construction Plant & Machinery on multiple projects.
I have successfully managed the Operation Maintenance of Construction Plant & Machinery on 6 running Construction Projects in my previous role.
I have experience coordinating maintenance schedules, troubleshooting issues, and ensuring equipment is running efficiently.
I have a strong understanding of preventiv...
Spar Geo Infra interview questions for popular designations
I applied via Approached by Company and was interviewed before May 2023. There was 1 interview round.
I specialize in construction management.
Water cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.
BOQ quantity refers to the Bill of Quantities, which is a document that lists all the materials, labor, and equipment needed for a construction project.
Calculation of BOQ quantity involves estimating the quantities of materials needed for a project based on the project's design a
Client management involves building and maintaining relationships with clients to ensure their satisfaction and retention.
Understanding client needs and expectations
Communicating effectively with clients
Providing timely and quality service
Managing client feedback and complaints
Identifying opportunities for upselling or cross-selling
Maintaining accurate client records
Building long-term relationships with clients
Ensuring
MRS stands for Management Reserve Schedule, which is a contingency budget set aside for unforeseen events.
MRS is calculated by multiplying the total project budget by a percentage set by the project manager.
The percentage is usually between 5-10% of the total budget.
MRS is used to cover unexpected costs or delays that may arise during the project.
It is important to have a well-defined MRS to ensure the project stays on
Top trending discussions
Internal plaster thickness and ratio are important factors in construction projects.
The standard thickness of internal plaster is usually 12mm for walls and 15mm for ceilings.
The ratio of internal plaster is typically 1:6 (1 part cement to 6 parts sand).
The thickness and ratio may vary depending on the specific requirements of the project and the type of surface being plastered.
Slab checking involves verifying the structural integrity and load-bearing capacity of concrete slabs.
Check for proper reinforcement placement and spacing
Verify concrete mix design and curing process
Inspect for any cracks or defects
Ensure slab thickness meets design specifications
Perform load testing if necessary
External plaster thickness and ratio are determined based on the type of surface and desired finish.
External plaster thickness typically ranges from 12mm to 20mm depending on the surface condition.
The ratio of external plaster mix is usually 1:4 (cement:sand) for rough surfaces and 1:6 for smooth finishes.
For better adhesion, a bonding agent may be added to the plaster mix.
Proper curing is essential to ensure the stren
posted on 16 Dec 2023
I applied via LinkedIn and was interviewed in Nov 2024. There was 1 interview round.
I applied via Company Website and was interviewed in Nov 2024. There was 1 interview round.
Joins are used to combine rows from two or more tables based on a related column between them.
Types of joins include INNER JOIN, LEFT JOIN, RIGHT JOIN, and FULL JOIN.
INNER JOIN returns rows when there is at least one match in both tables.
LEFT JOIN returns all rows from the left table and the matched rows from the right table.
RIGHT JOIN returns all rows from the right table and the matched rows from the left table.
FULL ...
I applied via Approached by Company and was interviewed in Oct 2024. There were 2 interview rounds.
5 assignments were given to test the various adobe tools.
Interview experience
based on 45 reviews
Rating in categories
Civil Site Engineer
9
salaries
| ₹2 L/yr - ₹6.7 L/yr |
Planning & Billing Engineer
8
salaries
| ₹4.7 L/yr - ₹10.2 L/yr |
HR Executive
6
salaries
| ₹3 L/yr - ₹3.8 L/yr |
Purchase Executive
6
salaries
| ₹2.5 L/yr - ₹5 L/yr |
Deputy Project Manager
6
salaries
| ₹6.6 L/yr - ₹9 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company