I applied via Naukri.com and was interviewed before Nov 2020. There were 3 interview rounds.
posted on 16 Apr 2022
My further most career goal is to become a director of project management.
To gain experience in managing large-scale projects
To develop leadership and communication skills
To build a strong network of industry professionals
To continuously learn and stay updated with industry trends
To achieve PMP certification
To work towards becoming a subject matter expert in project management
To mentor and train junior project managers
...
posted on 21 Aug 2024
Steel margin refers to the difference between the cost of producing steel and the selling price.
Steel margin is calculated by subtracting the cost of production (including raw materials, labor, and overhead) from the selling price of steel products.
It is important for companies to maintain a healthy steel margin to ensure profitability and sustainability.
Factors that can impact the steel margin include fluctuations in ...
The percentage of aggregate in gradation test varies depending on the specific requirements of the project.
The percentage of aggregate in gradation test is typically determined by the specifications provided for the project
It can range from 0% to 100% depending on the type of aggregate being used and the desired characteristics of the final mix
For example, in a concrete mix design, the percentage of coarse aggregate ma...
The project manager plays a crucial role in overseeing and coordinating all aspects of a project at the site.
Responsible for planning, organizing, and directing project activities
Ensuring project goals are met within budget and timeline
Managing resources and stakeholders effectively
Problem-solving and decision-making skills are essential
Strong communication and leadership skills are necessary
The overall cost in a project in the role of RCC refers to the total expenses incurred for the Reinforced Cement Concrete work.
Calculate the cost of materials such as cement, aggregates, and reinforcement bars.
Consider the cost of labor for construction and installation of RCC components.
Include any additional costs such as equipment rental, transportation, and overhead expenses.
Factor in the cost of quality control me...
posted on 4 May 2024
I applied via Approached by Company and was interviewed before May 2023. There were 2 interview rounds.
General aptitude of IQ
Concrete compressive strength acceptance criteria is based on specified strength, testing frequency, and acceptance criteria.
Specified strength should be determined by the project requirements or standards.
Testing frequency should be established to ensure consistent quality control.
Acceptance criteria may include minimum strength requirements and statistical analysis.
Example: Specified strength of 28 MPa, testing every...
Project management is the practice of initiating, planning, executing, controlling, and closing the work of a team to achieve specific goals and meet specific success criteria.
Involves initiating, planning, executing, controlling, and closing a project
Focuses on achieving specific goals and meeting success criteria
Requires effective communication, coordination, and resource management
Utilizes tools and techniques such ...
Address the issue directly with the contractor and set clear expectations for improvement.
Schedule a meeting with the contractor to discuss performance concerns
Clearly communicate the areas where the contractor is not meeting expectations
Set specific goals and deadlines for improvement
Offer support or resources to help the contractor improve
Consider consequences if performance does not improve, such as termination of c
EPC stands for Engineering, Procurement, and Construction. An EPC contractor is a company that provides all services required for a project from design to completion.
EPC stands for Engineering, Procurement, and Construction
EPC contractors are responsible for designing, procuring materials, and constructing projects
They are often hired for large-scale projects such as power plants, refineries, and infrastructure project
posted on 21 Jun 2024
I applied via Company Website and was interviewed before Jun 2023. There were 2 interview rounds.
The process of Water Treatment Plant (W.T.P) involves various stages to purify water for consumption.
1. Coagulation: Adding chemicals to water to make particles clump together.
2. Sedimentation: Allowing the clumped particles to settle at the bottom.
3. Filtration: Passing water through filters to remove remaining particles.
4. Disinfection: Adding chlorine or other chemicals to kill bacteria and viruses.
5. Distribution: ...
posted on 8 Jan 2024
SFRA test is a diagnostic test performed on power transformers to assess their mechanical and electrical integrity.
SFRA stands for Sweep Frequency Response Analysis.
It is a non-intrusive test that measures the frequency response of a transformer to a swept sinusoidal input signal.
The test helps in identifying mechanical and electrical faults in the transformer windings.
SFRA test results can be compared with baseline me...
posted on 31 Aug 2022
The grade of concrete normally used for RCC is M20.
The grade of concrete for RCC (Reinforced Cement Concrete) is determined based on the design requirements and structural considerations.
The most commonly used grade of concrete for RCC is M20, which means the concrete mix has a compressive strength of 20 megapascals (MPa) after 28 days of curing.
Other grades of concrete like M25, M30, M35, etc., can also be used depend...
Pre-initiative actions for start piling
Conduct a geotechnical investigation to assess soil conditions
Obtain necessary permits and approvals from local authorities
Develop a detailed piling plan and schedule
Procure required piling equipment and materials
Ensure safety measures are in place for workers and surrounding areas
Prepare the site by clearing any obstacles or debris
Establish proper communication channels with stak...
The duration for deshuttering a beam of span 4 mtr depends on various factors.
The type of formwork used for shuttering the beam
The strength of the concrete used
The ambient temperature and humidity
The curing process followed
The complexity of the beam design
The availability of manpower and equipment
Typically, deshuttering can take anywhere from 7 to 21 days for a beam of span 4 mtr
To define one way and two way slab, we follow different procedures. For two way slab, reinforcement is fixed in both directions.
One way slab is defined as the slab in which the ratio of longer span to shorter span is greater than or equal to 2.
Two way slab is defined as the slab in which the ratio of longer span to shorter span is less than 2.
For two way slab, reinforcement is fixed in both directions to distribute the...
I applied via Naukri.com and was interviewed in Nov 2022. There was 1 interview round.
Design standards for sewerage system
Design standards vary based on location and regulations
Consideration should be given to factors such as population density, topography, and soil type
Standards may include minimum pipe diameter, slope, and depth
Examples of design standards include ASCE 15 and EPA guidelines
posted on 6 Apr 2022
I applied via Company Website
Hi this sudhir here a diploma holder in civil high rise building construction .I know the grade of concrete for building construction and finishing work knowledge also I have.
Admixtures are added to concrete to improve its properties and performance.
Admixtures enhance the workability and durability of concrete.
They can reduce the water content required for a given slump, making the concrete more cohesive.
Admixtures can accelerate or retard the setting time of concrete.
They improve the strength, durability, and resistance to chemical attack of concrete.
Examples of admixtures include water re...
M25 cube strength refers to the compressive strength of concrete with a mix ratio of 1:1:2.
M25 cube strength is a measure of the ability of concrete to withstand compression.
It is denoted by the characteristic strength of a concrete cube tested at 28 days.
M25 grade concrete has a mix ratio of 1:1:2 (cement:sand:aggregate).
The cube strength of M25 concrete is typically around 25 MPa or 3625 psi.
It is important for struc...
posted on 17 Sep 2021
I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.
Take appropriate action against contractors not complying with specifications.
Identify the specific non-compliance issues
Communicate the non-compliance to the contractors
Request corrective actions or modifications to meet the specifications
Monitor and document the progress of corrective actions
Consider penalties or contract termination if non-compliance persists
Project Engineer
28
salaries
| ₹2.8 L/yr - ₹7 L/yr |
Site Engineer
17
salaries
| ₹2 L/yr - ₹3.6 L/yr |
QS Engineer
13
salaries
| ₹4.4 L/yr - ₹4.8 L/yr |
Project Manager
11
salaries
| ₹8 L/yr - ₹9.1 L/yr |
Assistant Manager
9
salaries
| ₹4.5 L/yr - ₹8 L/yr |
DLF
Prestige Group
Godrej Properties
Larsen & Toubro Limited