Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Simplex Infrastructures Team. If you also belong to the team, you can get access from here

Simplex Infrastructures Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Simplex Infrastructures Chief Manager Interview Questions and Answers

Updated 19 Feb 2025

Simplex Infrastructures Chief Manager Interview Experiences

1 interview found

Chief Manager Interview Questions & Answers

user image Abhijit Bora

posted on 17 Feb 2025

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected
Round 1 - HR 

(1 Question)

  • Q1. Lots of HR related Quotation.
Round 2 - Technical 

(1 Question)

  • Q1. Deep Technical test , Ability test etv
Round 3 - Technical 

(1 Question)

  • Q1. Technical Director check ability
Round 4 - HR 

(1 Question)

  • Q1. Salary & location
Round 5 - Assignment 

Documents verification

Interview questions from similar companies

Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-

Interview Questionnaire 

2 Questions

  • Q1. Power Transmission line how many gangs do you have in your hand.
  • Ans. 

    As Chief Manager, I oversee multiple power transmission lines and manage various gangs responsible for maintenance and operations.

    • I have multiple gangs under my supervision, each assigned to different sections of the power transmission line.

    • Each gang is responsible for specific tasks such as maintenance, repair, and inspection of the transmission line.

    • Examples of gangs include line crews, tower climbers, and maintenanc...

  • Answered by AI
  • Q2. How many months will take TL Ss completion. Bla bla bla.......
  • Ans. 

    The completion of TL Ss will take approximately 6 months.

    • The completion of TL Ss typically takes around 6 months.

    • Factors such as project complexity, team size, and resources available can impact the timeline.

    • For example, a smaller project with a highly skilled team may be completed in less than 6 months, while a larger project with limited resources may take longer.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't go for interview to this company. Waste of time. Sallary very poor and there is mismatch of payslip and commitment during offer letter. Don't join this company.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jan 2023. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. As mentioned in your CV experience education and family background etc.
  • Q2. Experience and why we hire you,
Round 2 - Technical 

(1 Question)

  • Q1. About what's you do in your previous organisation, and what you mentioned in your CV related technical questions,
Round 3 - Salary negotiate  

(1 Question)

  • Q1. Kitna loge kb join karoge

Interview Preparation Tips

Topics to prepare for Welspun Enterprises Chief Engineer interview:
  • Transformers
  • Timers
  • Pumps
  • HT LT
  • VCBS
Interview preparation tips for other job seekers - Don't be over smart, just focus on your CV what you mentioned in the CV they were ask the technical questions from work you done in previous organisation,
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-

Interview Questionnaire 

2 Questions

  • Q1. Power Transmission line how many gangs do you have in your hand.
  • Ans. 

    As Chief Manager, I oversee multiple power transmission lines and manage various gangs responsible for maintenance and operations.

    • I have multiple gangs under my supervision, each assigned to different sections of the power transmission line.

    • Each gang is responsible for specific tasks such as maintenance, repair, and inspection of the transmission line.

    • Examples of gangs include line crews, tower climbers, and maintenanc...

  • Answered by AI
  • Q2. How many months will take TL Ss completion. Bla bla bla.......
  • Ans. 

    The completion of TL Ss will take approximately 6 months.

    • The completion of TL Ss typically takes around 6 months.

    • Factors such as project complexity, team size, and resources available can impact the timeline.

    • For example, a smaller project with a highly skilled team may be completed in less than 6 months, while a larger project with limited resources may take longer.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't go for interview to this company. Waste of time. Sallary very poor and there is mismatch of payslip and commitment during offer letter. Don't join this company.

Simplex Infrastructures Interview FAQs

How many rounds are there in Simplex Infrastructures Chief Manager interview?
Simplex Infrastructures interview process usually has 5 rounds. The most common rounds in the Simplex Infrastructures interview process are HR, Technical and Assignment.

Tell us how to improve this page.

Simplex Infrastructures Chief Manager Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 735 Interviews
Tata Projects Interview Questions
4.2
 • 422 Interviews
TCE Interview Questions
3.8
 • 246 Interviews
AECOM Interview Questions
4.2
 • 113 Interviews
Apco Infratech Interview Questions
3.7
 • 112 Interviews
View all
Simplex Infrastructures Chief Manager Salary
based on 27 salaries
₹8.6 L/yr - ₹25 L/yr
8% less than the average Chief Manager Salary in India
View more details

Simplex Infrastructures Chief Manager Reviews and Ratings

based on 2 reviews

5.0/5

Rating in categories

5.0

Skill development

3.9

Work-life balance

4.7

Salary

5.0

Job security

4.1

Company culture

3.8

Promotions

5.0

Work satisfaction

Explore 2 Reviews and Ratings
Assistant Manager
222 salaries
unlock blur

₹3.5 L/yr - ₹11.1 L/yr

Assistant Engineer
154 salaries
unlock blur

₹1.8 L/yr - ₹5 L/yr

Assistant Engineer - Civil
153 salaries
unlock blur

₹2.6 L/yr - ₹4.5 L/yr

Project Engineer
135 salaries
unlock blur

₹2.9 L/yr - ₹7.8 L/yr

Deputy Manager
111 salaries
unlock blur

₹5.5 L/yr - ₹12.6 L/yr

Explore more salaries
Compare Simplex Infrastructures with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview