Filter interviews by
I was interviewed before Jan 2024.
Critical provides a variety of materials for production.
Raw materials such as metals, plastics, and fabrics
Components like screws, bolts, and electronic parts
Tools and equipment for manufacturing processes
Packaging materials for finished products
Robot handling refers to the process of programming and controlling robots to perform specific tasks in a production environment.
Robot handling involves programming robots to perform tasks such as picking, placing, and moving objects in a production line.
It requires knowledge of robotics, automation, and programming languages such as C++, Python, or ROS.
Robot handling can improve efficiency, accuracy, and safety in man...
Top trending discussions
Explain gear box and electrical Motors
I applied via Job Portal and was interviewed in Jan 2022. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Nov 2024. There were 3 interview rounds.
I have 5 years of experience in production engineering.
I have worked in the production engineering field for 5 years.
My experience includes optimizing production processes and improving efficiency.
I have successfully implemented cost-saving measures in previous roles.
I have a strong understanding of manufacturing principles and technologies.
I have experience working with cross-functional teams to achieve production goa
Manpower can be effectively handled by proper planning, communication, training, and motivation.
Develop a clear organizational structure and job roles
Communicate effectively with the team to ensure understanding of goals and expectations
Provide necessary training and resources for skill development
Motivate and reward employees for their hard work and achievements
Regularly evaluate performance and provide feedback for i
Salary expectations are based on industry standards, experience, and location.
Research industry standards for Production Engineers in your area
Consider your level of experience and skills
Factor in the cost of living in the location of the job
Be prepared to negotiate based on benefits and perks offered
Provide a range rather than a specific number
posted on 15 Dec 2024
I applied via Recruitment Consulltant and was interviewed in Jun 2024. There were 2 interview rounds.
What is your role in the company, and how did you achieve your target?
I was interviewed in Aug 2024.
English, maths and puzzles basic preparation.
Question
Add four work before work,guard to make meaningful word
I applied via Recruitment Consulltant and was interviewed before Apr 2021. There were 2 interview rounds.
I was interviewed in Aug 2023.
My KPI as a Production Engineer is to ensure efficient production processes, minimize downtime, and optimize product quality.
Monitoring and improving production efficiency
Reducing downtime through preventive maintenance
Implementing quality control measures
Optimizing production output
Analyzing and improving production costs
OEE (Overall Equipment Efficiency) can be calculated by multiplying Availability, Performance, and Quality percentages.
Calculate Availability by dividing the total operating time by the planned production time.
Calculate Performance by dividing the actual production rate by the maximum production rate.
Calculate Quality by dividing the good units produced by the total units produced.
Multiply the Availability, Performance
4M is a methodology used in production engineering. Retroactive refers to actions taken after an event, while prospective refers to actions taken before an event.
4M is a methodology used in production engineering that stands for Man, Machine, Material, and Method.
Man refers to the human resources involved in the production process.
Machine refers to the equipment and tools used in production.
Material refers to the raw m...
The base documents of a control plan include process flow diagrams, work instructions, and quality standards.
Process flow diagrams outline the sequence of steps in the production process.
Work instructions provide detailed instructions on how to perform each step of the process.
Quality standards define the criteria for acceptable quality and specify the required inspections and tests.
Other base documents may include con...
5W 1H is a technique used to gather information by asking five 'W' questions and one 'H' question.
5W 1H stands for Who, What, When, Where, Why, and How.
It is commonly used in journalism, problem-solving, and project management.
By asking these questions, one can gather comprehensive information about a situation or problem.
For example, in a production engineering context, the 5W 1H questions could be: Who is responsible...
based on 1 interview
Interview experience
Assistant Manager
24
salaries
| ₹5.4 L/yr - ₹9 L/yr |
Senior Engineer
21
salaries
| ₹3.6 L/yr - ₹5.4 L/yr |
Production Engineer
16
salaries
| ₹3 L/yr - ₹4 L/yr |
Senior Engineer Purchase
12
salaries
| ₹3 L/yr - ₹5.4 L/yr |
Quality Engineer
10
salaries
| ₹2.9 L/yr - ₹4 L/yr |
TCS
Infosys
Wipro
HCLTech