Filter interviews by
Clear (1)
I applied via Company Website and was interviewed in May 2022. There were 2 interview rounds.
I applied via Company Website and was interviewed in May 2022. There were 2 interview rounds.
Top trending discussions
posted on 28 Oct 2021
I applied via Referral and was interviewed in Sep 2021. There were 3 interview rounds.
posted on 3 May 2023
I applied via Approached by Company and was interviewed in Nov 2022. There were 3 interview rounds.
Yes, I have knowledge in CNC machines.
I have experience in programming and operating CNC machines.
I am familiar with G-code and M-code programming languages.
I have worked with various types of CNC machines such as lathes, mills, and routers.
I have knowledge in setting up and maintaining CNC machines.
I am aware of safety protocols and procedures when working with CNC machines.
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
posted on 29 Jan 2022
I applied via Other and was interviewed in Jul 2021. There were 4 interview rounds.
Metallurgy parameters inspection standards ensure quality control in metal manufacturing.
Metallurgical inspection standards involve testing for chemical composition, mechanical properties, and microstructure.
Standards such as ASTM, ISO, and ASME provide guidelines for inspection procedures and acceptance criteria.
Inspection methods include visual inspection, ultrasonic testing, radiography, and metallography.
Metallurgi...
I applied via Walk-in and was interviewed before Dec 2021. There were 3 interview rounds.
GD&T symbols are used to specify the geometric requirements of a part or assembly.
GD&T stands for Geometric Dimensioning and Tolerancing
Symbols include: flatness, circularity, perpendicularity, concentricity, position, and more
Each symbol has a specific meaning and is used to communicate precise engineering requirements
GD&T is used in industries such as aerospace, automotive, and manufacturing
Example: A position symbol...
Cp, Cpk, Pp, and Ppk are statistical process control indices used to measure process capability and performance.
Cp and Cpk measure how well a process meets its specifications, with Cpk being more accurate for non-centered processes.
Pp and Ppk measure how well a process performs relative to its natural variation, with Ppk being more accurate for non-centered processes.
All four indices are calculated using the process me...
Casting should be thorough
Aluminium die Casting
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
Senior Associate Engineer
250
salaries
| ₹0 L/yr - ₹0 L/yr |
Associate Engineer
147
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
139
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
139
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
133
salaries
| ₹0 L/yr - ₹0 L/yr |
MAHLE Behr India
Federal Mogul Goetze
Rane Engine Valve Limited
UNO Minda