Upload Button Icon Add office photos

Filter interviews by

Shree Umiya Infrastructure Civil Engineer Site and Quality Interview Questions, Process, and Tips

Updated 22 Jan 2018

Shree Umiya Infrastructure Civil Engineer Site and Quality Interview Experiences

1 interview found

I applied via Referral and was interviewed before Jan 2017. There were 4 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. How many types of foundation?
  • Ans. 

    There are several types of foundations used in civil engineering.

    • Shallow foundations: spread footings, mat foundations

    • Deep foundations: pile foundations, drilled shafts

    • Special foundations: caissons, cofferdams

    • Combined foundations: raft foundations, pile caps

  • Answered by AI
  • Q2. What is the ratio for ceiling plaster?
  • Ans. 

    The ratio for ceiling plaster is typically 1:4 or 1:5.

    • The ratio refers to the proportion of cement to sand used in the plaster mixture.

    • A common ratio for ceiling plaster is 1 part cement to 4 parts sand.

    • Another common ratio is 1 part cement to 5 parts sand.

    • The specific ratio may vary depending on the project requirements and local building codes.

  • Answered by AI
  • Q3. What is proportion of M30 grade concrete?
  • Ans. 

    The proportion of M30 grade concrete is 1:1:2 (cement:sand:aggregate).

    • M30 grade concrete has a proportion of 1 part cement, 1 part sand, and 2 parts aggregate.

    • This means that for every 1 unit of cement, 1 unit of sand, and 2 units of aggregate are used.

    • For example, if you have 1 bag of cement (50 kg), you would need 50 kg of sand and 100 kg of aggregate.

  • Answered by AI
  • Q4. What is cutting length of steel?
  • Ans. 

    Cutting length of steel is the length of steel bars required for construction purposes.

    • Cutting length of steel refers to the length of steel bars needed for construction projects.

    • It is calculated by subtracting the development length and lap length from the total length of the bar.

    • The cutting length is important for determining the quantity of steel required and for cost estimation.

    • For example, if a steel bar needs to ...

  • Answered by AI
  • Q5. How many holes per inch square in chicken mess for external plaster?
  • Ans. 

    The number of holes per inch square in chicken mesh for external plaster varies depending on the specific requirements of the project.

    • The number of holes per inch square in chicken mesh for external plaster is determined by factors such as the type of plaster being used, the desired level of ventilation, and the size of the mesh.

    • In general, a common range for the number of holes per inch square in chicken mesh for exte...

  • Answered by AI

Interview Preparation Tips

Round: Resume Shortlist
Experience: I submitted the resume to the company's office.

General Tips: I learned a lot from interview. I have seen the fault in me. I removed those fault from myself. Keep working hard and try hard to get success one day.
Skills: Power point, Microsoft word, Microsoft Excel Skills, Autocad, Autocad, Communication, Body Language, Problem Solving
Duration: <1 week

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - Technical 

(3 Questions)

  • Q1. What is the grade of concrete
  • Ans. 

    The grade of concrete refers to its strength and is determined by the ratio of cement to sand to aggregate.

    • The grade of concrete is typically denoted by a number followed by the letter 'M', such as M20, M30, etc.

    • The number in the grade represents the compressive strength of the concrete in megapascals (MPa) after 28 days of curing.

    • For example, M20 concrete has a compressive strength of 20 MPa, while M30 concrete has a ...

  • Answered by AI
  • Q2. What is the unit used for estimating painting work?
  • Ans. 

    The unit used for estimating painting work is square feet.

    • Square feet is commonly used to estimate the amount of paint needed for a project.

    • Other units like square meters can also be used depending on the region.

    • Calculations are based on the surface area to be painted.

  • Answered by AI
  • Q3. What you mean by RL in survey
  • Ans. 

    RL in survey stands for Reduced Level, which is the vertical distance between a point and a reference point.

    • RL is used in surveying to determine the elevation of a point relative to a known reference point.

    • It is commonly used in construction projects to ensure accurate leveling of structures and surfaces.

    • RL can be calculated using leveling instruments such as a dumpy level or a theodolite.

    • For example, if a benchmark ha...

  • Answered by AI
Round 2 - One-on-one 

(2 Questions)

  • Q1. Types of cement
  • Ans. 

    Types of cement include Portland cement, rapid-hardening cement, and sulfate-resistant cement.

    • Portland cement is the most common type and is used in general construction.

    • Rapid-hardening cement sets quickly and is often used in repair work.

    • Sulfate-resistant cement is used in areas where soil or water has high sulfate content.

  • Answered by AI
  • Q2. Size of columns
  • Ans. 

    The size of columns in civil engineering is determined based on the load they will support and the height of the structure.

    • Columns are sized based on the load they will support, with larger loads requiring larger columns.

    • The height of the structure also plays a role in determining column size, with taller structures requiring larger columns for stability.

    • Factors such as material strength, column spacing, and building c...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare for the basic civil engineering concept and knowledge
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in May 2024. There were 3 interview rounds.

Round 1 - One-on-one 

(6 Questions)

  • Q1. How many Concrete blocks is required for 100sft ?
  • Ans. 

    The number of concrete blocks required for 100sft depends on the size of the blocks and the thickness of the wall being built.

    • The number of concrete blocks needed can be calculated by dividing the total area (100sft) by the area of one block.

    • The size of the concrete block and the thickness of the wall will determine the number of blocks needed.

    • For example, if each concrete block is 1ft x 1ft and the wall is 4 inches th

  • Answered by AI
  • Q2. What is Concrete density?
  • Ans. 

    Concrete density is the mass per unit volume of concrete.

    • Concrete density is typically measured in kilograms per cubic meter (kg/m^3).

    • The density of normal concrete is around 2400 kg/m^3.

    • Higher density concrete, such as heavyweight concrete, can have densities up to 4000 kg/m^3.

    • Lightweight concrete, on the other hand, can have densities as low as 1600 kg/m^3.

  • Answered by AI
  • Q3. What is thickness for outer & inner walls Plastering?
  • Ans. 

    The thickness for outer and inner walls plastering typically ranges from 12mm to 20mm.

    • The thickness of plastering for outer walls is usually around 15mm to 20mm.

    • The thickness of plastering for inner walls is typically around 12mm to 15mm.

    • The thickness may vary based on the type of wall surface and the desired finish.

    • It is important to ensure proper curing and finishing for a durable and aesthetically pleasing result.

  • Answered by AI
  • Q4. Which formwork is used in all ur recently worked companies ?
  • Ans. 

    Various types of formwork have been used in my recently worked companies, including timber formwork, steel formwork, and aluminum formwork.

    • Timber formwork is commonly used for small to medium-sized projects due to its cost-effectiveness and flexibility.

    • Steel formwork is preferred for large and complex structures due to its durability and reusability.

    • Aluminum formwork is lightweight and easy to handle, making it suitabl

  • Answered by AI
  • Q5. What is the mix proportion of Plastering mortar?
  • Ans. 

    The mix proportion of plastering mortar typically consists of 1 part cement to 3-4 parts sand.

    • The mix proportion of plastering mortar is usually 1:3 or 1:4 (cement:sand)

    • The mix can also include lime to improve workability and durability

    • Water is added to achieve the desired consistency for application

    • Example: A common mix proportion for plastering mortar is 1 part cement, 3 parts sand, and water as needed

  • Answered by AI
  • Q6. How many materials required in 1m3 Plastering mortar?
  • Ans. 

    The materials required in 1m3 of plastering mortar include cement, sand, and water.

    • Cement is typically used in the ratio of 1:4 for plastering mortar.

    • Sand is used in the ratio of 3-4 times the amount of cement used.

    • Water is added as needed to achieve the desired consistency.

    • For example, for 1m3 of plastering mortar, you may need 0.25m3 of cement, 1m3 of sand, and water as needed.

  • Answered by AI
Round 2 - Aptitude Test 

Test was based on numerical, reasoning and verbal,Geometry,Profit & loss, Algebra, Simplication, trigonometry,Load calculation,etc

Round 3 - HR 

(5 Questions)

  • Q1. What are the roles & responsible in Recently worked company ?
  • Q2. They are analysing that Engineers are good consistency for their project work ?
  • Q3. Are you able to work in other states & countries ?
  • Q4. Will you able to work for 1-3 for our Sobha ltd company so you have to give ur contribution for gaining knowledge in Civil engineering technical world & to growth company also ?
  • Ans. 

    Yes, I am willing to work for 1-3 years at Sobha Ltd to contribute to the growth of the company and gain knowledge in the technical world of Civil engineering.

    • I am committed to continuous learning and professional development in the field of Civil engineering.

    • I understand the importance of gaining practical experience and knowledge to contribute effectively to the growth of the company.

    • I am excited about the opportunit...

  • Answered by AI
  • Q5. What are the designation in ur recently worked companies ?

Interview Preparation Tips

Topics to prepare for Sobha Senior Civil Engineer interview:
  • Civil engineering interview ques
  • User Experience
  • Labour Management
  • According to drawing
  • Civil engineering laws & code
  • Read Is standards
Interview preparation tips for other job seekers - Be always meditate on ur own way in Civil engineering technical world.🦁👍
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Explain mivan slab cycle
  • Ans. 

    Mivan slab cycle is a construction technique using aluminum formwork for casting slabs in a repetitive cycle.

    • Mivan slab cycle involves setting up aluminum formwork panels for casting slabs.

    • The cycle includes fixing reinforcement, pouring concrete, curing, and then dismantling the formwork for reuse.

    • This method is efficient, cost-effective, and results in high-quality finishes.

    • Mivan slab cycle reduces construction time ...

  • Answered by AI
  • Q2. What will you ensure before concreting
  • Ans. 

    Before concreting, ensure proper formwork, reinforcement placement, concrete mix design, and weather conditions.

    • Check formwork for proper alignment and stability

    • Ensure reinforcement bars are correctly placed as per design

    • Verify concrete mix design meets project specifications

    • Monitor weather conditions to prevent issues like rain or extreme temperatures affecting the concrete

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Expected salary if selected
  • Ans. 

    My expected salary is based on my qualifications, experience, and the industry standards.

    • I am looking for a competitive salary that reflects my skills and experience in the civil engineering field.

    • I have researched the average salary range for Civil Site Engineers in this region and industry.

    • I am open to negotiation based on the overall compensation package offered by the company.

    • I am looking for a salary that aligns w...

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. My experience & my qualification &my knowledge
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Abt work Experience?
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. About your self
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Referral and was interviewed in Dec 2023. There were 2 interview rounds.

Round 1 - Group Discussion 

Quality control and waste management

Round 2 - Aptitude Test 

Maths reasoning and core subjects

Interview Preparation Tips

Topics to prepare for Godrej Properties Civil Engineer interview:
  • RCC
Interview preparation tips for other job seekers - Many questions related to ambition box
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Any technical questions ask me
  • Q2. Difrance between OPC cement and PPC cement
  • Ans. 

    OPC cement is made from limestone and clay, while PPC cement is made from fly ash and clay.

    • OPC cement has higher strength and is used for construction of high-rise buildings and bridges.

    • PPC cement has better workability and is used for plastering and finishing works.

    • PPC cement is more eco-friendly as it uses industrial waste as a raw material.

    • OPC cement is costlier than PPC cement.

    • OPC cement is commonly used in areas w...

  • Answered by AI
  • Q3. What is two way slab
  • Ans. 

    A two way slab is a type of reinforced concrete slab that is supported by beams on all four sides.

    • Two way slab is used in buildings with large column spacing

    • It is designed to resist both positive and negative bending moments

    • It is commonly used in parking garages, commercial buildings, and residential buildings

    • Two way slab is more economical than one way slab for larger spans

  • Answered by AI
Round 3 - Assignment 

Dgijvcctuhgcvh hjjcc ghjj

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Normal question about your experience and profile
Round 3 - HR 

(1 Question)

  • Q1. After hr interview they forward to you for technical round

Interview Preparation Tips

Interview preparation tips for other job seekers - Knightfrank is a good company but they will provide multiple locations for work.

Shree Umiya Infrastructure Interview FAQs

What are the top questions asked in Shree Umiya Infrastructure Civil Engineer Site and Quality interview?

Some of the top questions asked at the Shree Umiya Infrastructure Civil Engineer Site and Quality interview -

  1. What is proportion of M30 grade concre...read more
  2. How many holes per inch square in chicken mess for external plast...read more
  3. What is the ratio for ceiling plast...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

JLL Interview Questions
4.1
 • 338 Interviews
CBRE Interview Questions
4.2
 • 253 Interviews
NoBroker Interview Questions
3.1
 • 224 Interviews
Sobha Interview Questions
3.9
 • 124 Interviews
Lodha Group Interview Questions
4.0
 • 122 Interviews
DLF Interview Questions
4.0
 • 72 Interviews
Colliers India Interview Questions
3.9
 • 60 Interviews
View all
Compare Shree Umiya Infrastructure with

JLL

4.1
Compare

CBRE

4.2
Compare

NoBroker

3.2
Compare

Sobha

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview