Upload Button Icon Add office photos

Shree Cement

Compare button icon Compare button icon Compare

Filter interviews by

Shree Cement Interview Questions, Process, and Tips

Updated 7 Apr 2025

Top Shree Cement Interview Questions and Answers

View all 103 questions

Shree Cement Interview Experiences

Popular Designations

162 interviews found

Junior Officer Interview Questions & Answers

user image ajaypal ranawat

posted on 4 Nov 2021

I applied via Referral and was interviewed in Oct 2021. There were 3 interview rounds.

Interview Questionnaire 

32 Questions

  • Q1. Advansed knolose
  • Q2. All packing knlose
  • Q3. Operations knlose
  • Q4. Opc bag sige
  • Q5. Ppc cement blain
  • Q6. Bag stacking patern
  • Q7. Weight weration
  • Q8. Truck under tracking
  • Q9. Sap reports
  • Q10. Material extraction problem
  • Ans. 

    Material extraction problem

    • Identify the type of material and its location

    • Determine the most efficient method of extraction

    • Consider environmental impact and regulations

    • Evaluate cost-benefit analysis

    • Develop a plan for transportation and storage of extracted material

  • Answered by AI
  • Q11. Opc cement blain
  • Q12. Loading Main power
  • Q13. House keeping system
  • Q14. Truck in And out system
  • Q15. Truck calling system
  • Q16. Maintenance work
  • Q17. Packer Prasher
  • Q18. Packer calibration
  • Q19. Bag jaming problem issus solution
  • Q20. Issue of canver belt our load treeping
  • Ans. 

    The question is unclear and seems to be incomplete.

    • Please provide more context or clarify the question.

    • It is difficult to provide a meaningful answer without understanding the issue being referred to.

    • Canver belt and load treeping are not familiar terms.

    • Please rephrase the question or provide more information.

  • Answered by AI
  • Q21. Issue of silo airslide material jamming problems
  • Ans. 

    Silo airslide material jamming is a common issue in material handling systems.

    • The issue can be caused by various factors such as improper design, material properties, and operating conditions.

    • Regular maintenance and cleaning of the airslide system can help prevent jamming.

    • Using lubricants or anti-static agents can also help reduce friction and prevent material buildup.

    • Proper training of operators and implementing safet...

  • Answered by AI
  • Q22. Silo material lavels
  • Q23. Aliviter booth lavel problem
  • Ans. 

    I'm sorry, but I cannot understand the question. Please provide more context.

    • Please provide more information about the Aliviter booth lavel problem.

    • What is the context of the problem?

    • What industry or field is this related to?

    • Can you provide any examples or details about the problem?

    • Without more information, it is difficult to provide a meaningful answer.

  • Answered by AI
  • Q24. Packer search hoper over flow problems
  • Ans. 

    Packer search hopper overflow problems

    • Check if the hopper is overfilled

    • Inspect the packer for any malfunctions

    • Ensure proper maintenance of the equipment

    • Implement a regular cleaning schedule

    • Train employees on proper usage and maintenance

  • Answered by AI
  • Q25. Lavel sanser problems
  • Q26. Canver belt out side run problems
  • Ans. 

    The question is unclear and seems to be incomplete.

    • The question is incomplete and lacks context.

    • It is unclear what is meant by 'Canver belt out side run problems'.

    • Further clarification is needed to provide an accurate answer.

  • Answered by AI
  • Q27. Loding machine gyer box problem
  • Ans. 

    The loading machine's gearbox is experiencing a problem.

    • Check for any leaks or damage to the gearbox

    • Inspect the gears and bearings for wear and tear

    • Ensure proper lubrication and oil levels

    • Check for any loose or damaged belts or pulleys

    • Consult the manufacturer's manual for troubleshooting steps

  • Answered by AI
  • Q28. Bag rounding problem
  • Ans. 

    Bag rounding problem involves distributing items into bags with a certain weight limit.

    • The problem requires dividing items into bags with a specific weight limit.

    • The bags must be filled as evenly as possible.

    • The solution may involve using algorithms such as greedy algorithms or dynamic programming.

    • Example: Distributing 10 apples with a weight of 1kg each into 3 bags with a weight limit of 4kg each.

  • Answered by AI
  • Q29. BAG not discharge problems
  • Q30. Bag over & under weight problems
  • Ans. 

    Bag over & under weight problems

    • Overweight bags can cause strain on the body and may exceed weight limits for travel

    • Underweight bags may not contain necessary items and may need to be supplemented with additional items

    • Bag weight should be checked before travel to avoid any issues

  • Answered by AI
  • Q31. Bag holding problems
  • Q32. All type manpower handling operations problem
  • Ans. 

    Manpower handling operations can face various problems.

    • Shortage of skilled manpower

    • Inefficient communication and coordination

    • Safety hazards and accidents

    • Lack of proper training and development

    • Employee turnover and retention

    • Inadequate resources and equipment

    • Poor work-life balance

    • Resistance to change and new technology

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Hold on to your work
Mind sate in over side

Skills evaluated in this interview

Top Shree Cement Junior Officer Interview Questions and Answers

Q1. Issue of silo airslide material jamming problems
View answer (1)

Junior Officer Interview Questions asked at other Companies

Q1. Process and equipments which i have used and worked on it,
View answer (7)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview in Jan 2025.

Round 1 - One-on-one 

(2 Questions)

  • Q1. How do you make growth of the market
  • Ans. 

    To drive market growth, I focus on understanding customer needs, developing strong relationships, implementing effective marketing strategies, and continuously analyzing market trends.

    • Understand customer needs and preferences through market research

    • Develop strong relationships with key stakeholders and customers

    • Implement effective marketing strategies to reach target audience

    • Analyze market trends and adjust strategies ...

  • Answered by AI
  • Q2. What is the achievement of our previous company
  • Ans. 

    Our previous company achieved a 20% increase in sales revenue within one year.

    • Implemented new sales strategies resulting in higher revenue

    • Expanded client base through targeted marketing campaigns

    • Streamlined sales processes for improved efficiency

    • Received industry recognition for outstanding sales performance

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please do not apply in the shree cement limited, this company will make your family away from you

Area Sales Manager Interview Questions asked at other Companies

Q1. How to handling position and how to coverage rout and sales teams
View answer (29)

IT Engineer Interview Questions & Answers

user image Anonymous

posted on 25 Jan 2025

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Dec 2024.

Round 1 - Technical 

(3 Questions)

  • Q1. Network issue resolved
  • Q2. Hardware problem
  • Ans. 

    Diagnosing and troubleshooting hardware problems in IT systems.

    • Identify the specific hardware component causing the issue

    • Check for loose connections or cables

    • Run diagnostic tests to pinpoint the problem

    • Update drivers or firmware if necessary

    • Consider hardware upgrades if outdated or faulty

  • Answered by AI
  • Q3. IT and oitds problem resolved server problem
Round 2 - HR 

(3 Questions)

  • Q1. IT and oitds problem resolved
  • Q2. Server problem hai
  • Q3. Hardware and software issue

IT Engineer Interview Questions asked at other Companies

Q1. What is active directory ? Role of DNS server ? Difference between RAM & ROM ? Knowledge on installation of various softwares and Drivers ? Layers of OSI model ? TCP/IP Configuration ? Knowledge on various types of Networking devices ? ... read more
View answer (2)

Lab Technician Interview Questions & Answers

user image Deepak Kumar

posted on 7 Apr 2025

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Mar 2025, where I was asked the following questions.

  • Q1. Autoclave bar what a in hot presser in out time
  • Q2. How many tipes of cement

Interview Preparation Tips

Interview preparation tips for other job seekers - Shree cement plant culture is not good

Lab Technician Interview Questions asked at other Companies

Q1. Order of draw Cbc parameters and normal range
View answer (42)

Shree Cement interview questions for popular designations

 Assistant Manager

 (7)

 Junior Officer

 (7)

 Engineer

 (6)

 Senior Engineer

 (5)

 Senior Officer

 (3)

 Sales Officer

 (3)

 Production Engineer

 (3)

 Senior Manager

 (3)

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Oct 2024, where I was asked the following questions.

  • Q1. Company benefits and business growth
  • Q2. How to add new vendors
  • Ans. 

    To add new vendors, establish criteria, conduct research, and evaluate potential partners for alignment with business goals.

    • Define vendor criteria: Identify what qualities and capabilities are essential for your business needs.

    • Conduct market research: Use platforms like LinkedIn or industry-specific directories to find potential vendors.

    • Evaluate potential vendors: Assess their reputation, reliability, and financial sta...

  • Answered by AI

Marketing Manager Interview Questions asked at other Companies

Q1. What the big opportunities to handle a sales in a worse situation i.e when prices & demand are low & vice versa
View answer (2)

Get interview-ready with Top Shree Cement Interview Questions

Engineer Interview Questions & Answers

user image Anonymous

posted on 28 Nov 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Kiln operation,raw mix design
  • Q2. Mill operation and optimisation

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep your basics and awareness about cement industry strong.

Top Shree Cement Engineer Interview Questions and Answers

Q1. What is cement ? , cement manufacturing processes?
View answer (1)

Engineer Interview Questions asked at other Companies

Q1. ❖ If a team member is unable to carry out his work, he is doing it repetitively, how would you handle it?, would you like to work only on lifing of components, or would you be ready to shift to other departments?
View answer (7)
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Machine operator for the same
  • Q2. Beg house in samson feeder chain problem
  • Ans. 

    The beg house in Samson feeder chain may be causing a problem.

    • Check for any blockages or obstructions in the beg house

    • Inspect the chain for any signs of wear or damage

    • Ensure proper lubrication of the chain to prevent friction and wear

    • Consider replacing the chain if necessary

  • Answered by AI
  • Q3. Will be grase problem eqiepment
  • Q4. Oli leakage in samson feeders
  • Ans. 

    Oli leakage in Samson feeders can be caused by worn out seals, loose fittings, or improper installation.

    • Check for worn out seals and replace them if necessary

    • Tighten any loose fittings to prevent leakage

    • Ensure proper installation of the feeder to prevent oil leakage

  • Answered by AI
  • Q5. Gearbox motor aliment in chack
  • Ans. 

    Gearbox motor alignment is crucial for optimal performance and longevity of the equipment.

    • Ensure the gearbox and motor are properly aligned to prevent premature wear and damage.

    • Use alignment tools such as dial indicators and laser alignment systems for accurate alignment.

    • Check for any misalignment by measuring the coupling gap and making adjustments as needed.

    • Regularly monitor and maintain the alignment to ensure smoot...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Vibration dipartment

Mechanical Fitter Interview Questions asked at other Companies

Q1. Preventive maintenance of various equipment using for processing
View answer (3)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Campus Placement

Round 1 - Aptitude Test 

It included arithmetic and marketing questions.

Round 2 - HR 

(1 Question)

  • Q1. Job profile and working atmosphere discussion happend
Round 3 - One-on-one 

(1 Question)

  • Q1. It was final interview

Management Trainee Marketing Interview Questions asked at other Companies

Q1. Why do we use a commercial vehicle? What is the difference between commercial and personal vehicles?
View answer (1)
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Jan 2025.

Round 1 - Technical 

(1 Question)

  • Q1. Related weighing machine and Instruments

Senior Engineer L2 Interview Questions asked at other Companies

Q1. What is different between dump unit and slide unit ?
View answer (1)
Interview experience
4
Good
Difficulty level
Hard
Process Duration
4-6 weeks
Result
Selected Selected

I appeared for an interview before Apr 2024, where I was asked the following questions.

  • Q1. Market Potential
  • Q2. Roles and responsibilities of current jobs and Personal profile , brand wise potential
  • Q3. Professional profile

Interview Preparation Tips

Interview preparation tips for other job seekers - If you have second offer than do not join this company

District Officer Interview Questions asked at other Companies

Q1. How to Appiont a dealer in a vacant market
View answer (1)
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

There was a 50 minute proctored online aptitude test, First 20 question was from logical reasoning and other 30 questions where from basic of civil engineering.

Round 2 - Group Discussion 

They just asked about Introduction , Why you want to join Shree Cement?, Would you be able to relocate Pan India.

Round 3 - Technical 

(4 Questions)

  • Q1. They asked about basics of civil engineering question.
  • Q2. They asked about technical questions for cement manufacturing
  • Q3. They asked about History of Shree Cement
  • Q4. Technical specifications, details of shree cement

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared and do great.

B Tech Civil Engineer Interview Questions asked at other Companies

Q1. What is the process of earthquake design of a multi storey building?
View answer (2)

Shree Cement Interview FAQs

How many rounds are there in Shree Cement interview?
Shree Cement interview process usually has 2-3 rounds. The most common rounds in the Shree Cement interview process are Technical, Resume Shortlist and HR.
How to prepare for Shree Cement interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Shree Cement. The most common topics and skills that interviewers at Shree Cement expect are Teaching, Bed, Communication Skills, PRT and Sales.
What are the top questions asked in Shree Cement interview?

Some of the top questions asked at the Shree Cement interview -

  1. Which product will you recommend customer PPC or PSC to us...read more
  2. How to work safe operation and shutdown and startup proced...read more
  3. Issue of silo airslide material jamming proble...read more
How long is the Shree Cement interview process?

The duration of Shree Cement interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Shree Cement Interview Process

based on 210 interviews

Interview experience

4.1
  
Good
View more

Interview Questions from Similar Companies

UltraTech Cement Interview Questions
4.2
 • 600 Interviews
JK Cement Interview Questions
4.1
 • 267 Interviews
Grasim Industries Interview Questions
4.0
 • 213 Interviews
ACC Interview Questions
3.9
 • 195 Interviews
Ambuja Cements Interview Questions
3.9
 • 113 Interviews
Star Cement Interview Questions
4.0
 • 66 Interviews
HIL Limited Interview Questions
4.1
 • 61 Interviews
View all

Shree Cement Reviews and Ratings

based on 2.3k reviews

3.8/5

Rating in categories

3.5

Skill development

3.5

Work-life balance

3.5

Salary

3.3

Job security

3.4

Company culture

3.1

Promotions

3.5

Work satisfaction

Explore 2.3k Reviews and Ratings
Assistant Manager
387 salaries
unlock blur

₹6 L/yr - ₹16.2 L/yr

Deputy Manager
346 salaries
unlock blur

₹8.5 L/yr - ₹20 L/yr

Officer
286 salaries
unlock blur

₹3 L/yr - ₹9.7 L/yr

Senior Engineer
279 salaries
unlock blur

₹3.9 L/yr - ₹11.5 L/yr

Assistant Officer
265 salaries
unlock blur

₹2 L/yr - ₹9 L/yr

Explore more salaries
Compare Shree Cement with

UltraTech Cement

4.2
Compare

JK Cement

4.1
Compare

Grasim Industries

4.0
Compare

ACC

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview