i
Sharika Enterprises
Filter interviews by
I applied via Naukri.com and was interviewed in Sep 2021. There was 1 interview round.
The reason for living is to make a positive impact on the world and find personal fulfillment.
To contribute to the advancement of technology and society
To solve complex problems and improve efficiency
To create innovative solutions that enhance people's lives
To continuously learn and grow as an engineer
To leave a lasting legacy and make a difference
Electrical clearance refers to the minimum distance required between conductive parts to prevent electrical breakdown.
Electrical clearance is important to ensure safety and prevent electrical arcing or short circuits.
For a 220 kV line, the electrical clearance would typically be larger than that for a 33 kV line.
The specific clearance requirements depend on various factors such as voltage level, environmental condition...
Top trending discussions
posted on 13 Nov 2024
I applied via campus placement at National Institute of Technology (NIT), Hamirpur and was interviewed in Oct 2024. There were 3 interview rounds.
Round 1 was a online test on Microsoft forms, 50 questions were there to be done in 60 minutes, consist of quantitative and verbal aptitude and subject matter.
The cutoff for civil engineering was 40/50, you can qualify this test, if you are giving placement tests seriously.
I am a dedicated Civil Engineer with a passion for designing and constructing sustainable infrastructure.
Graduated with a degree in Civil Engineering from XYZ University
Experienced in designing and managing construction projects
Skilled in using AutoCAD and other engineering software
Strong understanding of structural analysis and building codes
Completed internships at construction firms like ABC Construction
Calculating BBS for columns involves determining the quantity and spacing of reinforcement bars.
Calculate the total length of reinforcement bars required for the column
Determine the spacing between the bars based on design requirements
Consider the diameter and spacing of the bars to ensure proper structural integrity
Use software or manual calculations to determine the BBS accurately
Mix ratios of concrete refer to the proportions of cement, sand, and aggregate used in a concrete mix.
Mix ratios are typically expressed as a series of numbers representing the amount of each ingredient in the mix.
For example, a common mix ratio for concrete is 1:2:4, which means 1 part cement, 2 parts sand, and 4 parts aggregate.
The mix ratio can vary depending on the strength and durability requirements of the concre...
Design mix concrete is prepared as per the mix design provided by a structural engineer, while standard mix concrete follows a standard ratio of ingredients.
Design mix concrete is customized based on specific project requirements and strength criteria.
Standard mix concrete follows a fixed ratio of cement, sand, and aggregates, such as 1:2:4.
Design mix concrete may require testing and adjustments to achieve desired prop...
A firewall is a network security system that monitors and controls incoming and outgoing network traffic based on predetermined security rules.
Acts as a barrier between a trusted internal network and untrusted external network
Filters network traffic based on rules set by the administrator
Can be hardware-based or software-based
Examples include Cisco ASA, Palo Alto Networks, and Windows Firewall
I am a dedicated and detail-oriented PMO Analyst with a strong background in project management and data analysis.
I have a Bachelor's degree in Business Administration with a focus on project management.
I have experience in creating and maintaining project plans, tracking project progress, and analyzing project data.
I am proficient in using project management tools such as Microsoft Project and Jira.
I have excellent co...
I applied via Approached by Company and was interviewed in Apr 2024. There were 4 interview rounds.
I have 5 years of experience handling and managing plant materials in a warehouse setting.
Managed inventory of plant materials including seeds, fertilizers, and pesticides
Ensured proper storage conditions to maintain quality and prevent spoilage
Implemented inventory tracking systems to monitor stock levels and reorder supplies as needed
Collaborated with suppliers to ensure timely delivery of plant materials
Performed re...
Strore group comunication
posted on 20 Jul 2024
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
I applied via Referral and was interviewed in Mar 2024. There was 1 interview round.
FIDIC contract is a standard form of contract used in the construction industry.
FIDIC stands for International Federation of Consulting Engineers.
It provides a framework for the rights and obligations of parties involved in construction projects.
Commonly used in international construction projects.
Includes different types of contracts such as Red Book, Yellow Book, and Silver Book.
Variation refers to the degree of difference or deviation from a standard or expected value.
Variation can be caused by factors such as changes in materials, labor costs, or market conditions.
It is important for cost managers to analyze variation in order to understand the reasons behind cost fluctuations.
Examples of variation include price changes for raw materials, unexpected delays in project timelines, and fluctuati
GCC stands for Guaranteed Cost Contract and SCC stands for Self-Insured Retention Contract in construction projects.
GCC is a type of contract where the contractor is paid a fixed amount regardless of the actual project costs.
SCC is a type of contract where the contractor is responsible for a certain amount of project costs before insurance coverage kicks in.
GCC provides cost certainty for the project owner while SCC ma...
MIS stands for Management Information System, which is a computerized database that collects, processes, and presents information to support decision-making.
MIS helps in organizing and analyzing data to provide managers with information needed for decision-making.
It includes software systems, hardware, procedures, and people involved in the collection, processing, and dissemination of information.
Examples of MIS includ...
based on 19 reviews
Rating in categories
Manager
5
salaries
| ₹6 L/yr - ₹7 L/yr |
Engineer
5
salaries
| ₹2.8 L/yr - ₹5.1 L/yr |
Assistant Accounts Manager
5
salaries
| ₹4.7 L/yr - ₹7.5 L/yr |
Assistant Manager
4
salaries
| ₹6 L/yr - ₹8.5 L/yr |
Project Manager
4
salaries
| ₹7.3 L/yr - ₹7.8 L/yr |
GAMMON INDIA
McNally Bharat Engineering
Military Engineer Services
Chetak Enterprises