Filter interviews by
I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.
The amount of cubic metre of concrete that can be poured in a day depends on various factors such as the size of the project, number of workers, equipment used, weather conditions, etc.
The size of the project plays a major role in determining the amount of concrete that can be poured in a day
The number of workers and equipment used also affect the productivity of the project
Weather conditions such as temperature, humid...
Seeking new challenges and growth opportunities in a dynamic and innovative company.
Looking for a company that values continuous improvement and innovation.
Seeking a more challenging role that allows me to utilize my skills and expertise.
Interested in working with a diverse team and learning from their experiences.
Wanting to contribute to a company that aligns with my values and goals.
Desire to work in a company that o
I am expecting a competitive salary that reflects my skills, experience, and the responsibilities of the role.
Research the average salary range for QA QC Engineers in your location and industry.
Consider your qualifications, experience, and the value you can bring to the company.
Be prepared to negotiate and discuss salary expectations during the interview process.
Avoid giving a specific number initially, instead focus o...
Unit weight of steel and cement varies based on their composition and type.
The unit weight of steel ranges from 7.75 to 8.05 kN/m3 depending on its composition.
The unit weight of cement ranges from 1.1 to 1.5 kN/m3 depending on its type.
The unit weight of steel reinforcement bars is 7.85 kN/m3.
The unit weight of Portland cement is 1.5 kN/m3.
The unit weight of fly ash cement is 1.1 kN/m3.
Minimum cement content for M30 grade
The minimum cement content for M30 grade varies based on the type of cement used
As per IS 456:2000, the minimum cement content for M30 grade is 320 kg/m3
The water-cement ratio should not exceed 0.45 for M30 grade concrete
Nominal mix ratio for M20 is 1:1.5:3
Nominal mix ratio for M20 is 1 part cement : 1.5 parts sand : 3 parts aggregate
M20 is a standard mix used for construction purposes
The strength of M20 concrete is 20 N/mm² after 28 days of curing
Top trending discussions
I applied via Job Portal and was interviewed before Dec 2021. There were 3 interview rounds.
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.
I applied via Naukri.com and was interviewed before Jan 2021. There were 2 interview rounds.
The question is about requirements for WPS PQR, piping, and tank RT.
WPS (Welding Procedure Specification) and PQR (Procedure Qualification Record) are required for welding processes.
Piping requirements include material selection, design, fabrication, installation, and testing.
Tank RT (Radiographic Testing) requirements involve inspecting welds and joints for defects using X-rays or gamma rays.
All of these requirements ...
posted on 14 Apr 2024
I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.
posted on 11 Oct 2021
I applied via Company Website and was interviewed in Sep 2021. There was 1 interview round.
based on 1 review
Rating in categories
Senior Engineer
28
salaries
| ₹5.2 L/yr - ₹11 L/yr |
Junior Engineer
20
salaries
| ₹1.9 L/yr - ₹3.5 L/yr |
Civil Site Engineer
17
salaries
| ₹1.8 L/yr - ₹6 L/yr |
Asst Store
16
salaries
| ₹1.8 L/yr - ₹4.2 L/yr |
Executive Accountant
15
salaries
| ₹4.1 L/yr - ₹5.2 L/yr |
AECOM
L&T Energy Hydrocarbon
Apco Infratech
Saipem