The capacity of pumps used in operations varies depending on the specific needs of the system.
The capacity of pumps is typically measured in terms of flow rate, expressed in gallons per minute (GPM) or liters per second (L/s).
Different pumps have different capacities based on factors such as size, power, and efficiency.
For example, a centrifugal pump may have a capacity of 500 GPM, while a diaphragm pump may have a cap
Top trending discussions
posted on 11 Jul 2024
I ensure proper maintenance and utilization of both old and new machines in the execution field.
Regularly schedule maintenance for old machines to prevent breakdowns
Train staff on proper usage and maintenance of both old and new machines
Monitor performance of old machines and consider upgrades if necessary
Implement a system for tracking usage and maintenance history of all machines
Salary round discussion,anyhow you have to explain your ability to manage every question and grow attention of immediate boss
posted on 21 May 2023
I applied via Referral and was interviewed in Nov 2022. There were 2 interview rounds.
Different types of materials have different requirements for handling and storage.
Materials can be classified as hazardous or non-hazardous.
Hazardous materials require special handling and storage procedures to ensure safety.
Some materials may require specific temperature or humidity conditions for storage.
Materials may also have expiration dates that need to be monitored.
Examples of materials include chemicals, pharma...
An inspection and test plan can be prepared by following these steps:
Identify the scope of the inspection and testing
Determine the acceptance criteria
Identify the inspection and testing methods
Determine the frequency of inspection and testing
Identify the personnel responsible for inspection and testing
Document the inspection and test plan
Review and approve the plan with relevant stakeholders
posted on 25 Jun 2024
I applied via Approached by Company and was interviewed before Jun 2023. There was 1 interview round.
Project operations can be handled effectively by setting clear goals, establishing timelines, assigning tasks, monitoring progress, and adapting to changes.
Set clear goals and objectives for the project
Establish timelines and deadlines for each phase of the project
Assign tasks and responsibilities to team members based on their skills and expertise
Monitor progress regularly to ensure that the project is on track
Adapt t...
Senior Engineer
30
salaries
| ₹5.4 L/yr - ₹9.5 L/yr |
Junior Engineer
20
salaries
| ₹1.8 L/yr - ₹3.5 L/yr |
Civil Site Engineer
16
salaries
| ₹1.8 L/yr - ₹4.8 L/yr |
Asst Store
15
salaries
| ₹1.8 L/yr - ₹4.2 L/yr |
Civil Engineer
14
salaries
| ₹2.6 L/yr - ₹6.1 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GMR Group