Filter interviews by
I applied via Walk-in and was interviewed in Jun 2022. There was 1 interview round.
Top trending discussions
posted on 30 Jan 2025
posted on 10 May 2024
I applied via Campus Placement and was interviewed in Apr 2024. There were 2 interview rounds.
Group discussion is very friendly way ☺️
posted on 21 Jun 2024
Great knowledge on c
An H bridge is an electronic circuit that enables a voltage to be applied across a load in either direction.
Consists of four switching elements (transistors or MOSFETs)
Allows bidirectional control of a load
Commonly used in motor control applications
Can be used to control the direction of DC motors
A transformer in an appliance is a device that converts high voltage electricity to lower voltage for safe use.
Transformers consist of primary and secondary coils of wire wrapped around a core
They work on the principle of electromagnetic induction
Examples include transformers in power adapters for electronic devices
posted on 15 Apr 2024
My interested field is in manufacturing and production processes.
I have a strong interest in optimizing production efficiency and quality control.
I enjoy working with machinery and understanding how different components come together to create a final product.
I have experience in lean manufacturing principles and continuous improvement techniques.
I am always looking for ways to streamline processes and reduce waste in
I have 5 years of experience working as a Production Operator in a manufacturing plant.
Operated machinery and equipment to produce high-quality products
Followed safety protocols and procedures to ensure a safe working environment
Performed quality checks and inspections to maintain product standards
Collaborated with team members to meet production goals
Troubleshooted equipment issues and performed minor maintenance task
Basic electronics components are fundamental parts used in electronic circuits to control the flow of electricity.
Resistors: limit the flow of current
Capacitors: store and release electrical energy
Diodes: allow current to flow in one direction
Transistors: amplify or switch electronic signals
Inductors: store energy in a magnetic field
posted on 11 Mar 2024
posted on 10 Sep 2022
I applied via Naukri.com and was interviewed in Aug 2022. There was 1 interview round.
OEE calculation is a measure of manufacturing productivity that combines availability, performance, and quality.
OEE stands for Overall Equipment Efficiency.
It is calculated by multiplying availability, performance, and quality percentages.
Availability measures the actual production time compared to the planned production time.
Performance measures the actual production rate compared to the ideal production rate.
Quality ...
Torque is a rotational force that causes an object to rotate, while force is a push or pull that causes an object to move or change shape.
Torque is the product of force and the distance from the axis of rotation.
Torque is measured in units of force multiplied by distance, such as Newton-meters or foot-pounds.
Force is a vector quantity that has both magnitude and direction.
Force can be applied in various ways, such as p...
Group kaizen is a continuous improvement approach that involves a team of employees working together to identify and implement process improvements.
Group kaizen is a collaborative approach to problem-solving and process improvement.
It involves a team of employees from different departments or areas of expertise.
The team works together to identify areas for improvement and develop solutions.
Group kaizen encourages emplo...
Poka-yoke is a technique used in manufacturing to prevent errors, while CAPA stands for Corrective and Preventive Action.
Poka-yoke is a Japanese term that means 'mistake-proofing' or 'error-proofing'.
It involves designing processes or systems in a way that prevents mistakes or errors from occurring.
Poka-yoke techniques can include using physical devices, visual cues, or alarms to prevent errors.
For example, a car manuf...
Minor stoppage kaizen is a continuous improvement technique aimed at reducing small interruptions in production processes.
Minor stoppage kaizen focuses on identifying and eliminating minor stoppages or interruptions in production processes.
It involves analyzing the root causes of these stoppages and implementing countermeasures to prevent their recurrence.
Examples of minor stoppages include equipment jams, material sho...
TPM stands for Total Productive Maintenance. It is a systematic approach to equipment maintenance that aims to maximize productivity and minimize downtime.
TPM focuses on proactive and preventive maintenance to improve equipment reliability.
It involves the participation of all employees in the maintenance process.
TPM pillars are the key principles or areas of focus in implementing TPM.
There are typically 8 TPM pillars, ...
5S is a workplace organization method that improves efficiency and safety. JH stands for Job Hazard Analysis. Poka Yoke is a mistake-proofing technique.
5S is a systematic approach to organizing and maintaining a clean, safe, and efficient workplace.
It involves five steps: Sort, Set in Order, Shine, Standardize, and Sustain.
JH, or Job Hazard Analysis, is a process of identifying and evaluating potential hazards in a job...
Manpower handling refers to the management and coordination of human resources in a production environment.
It involves assigning tasks and responsibilities to workers
Monitoring and evaluating their performance
Providing training and development opportunities
Ensuring a safe and productive work environment
Managing work schedules and shifts
Addressing employee concerns and grievances
Optimizing workforce efficiency and produ...
Rejection handling is the process of managing and addressing rejected or failed products or components in production.
Rejection handling involves identifying and analyzing the reasons for rejection.
It includes implementing corrective actions to prevent future rejections.
Rejection handling may involve reworking or repairing rejected products.
It also includes documenting and reporting rejection data for analysis and impro...
posted on 26 Sep 2021
I applied via Walk-in and was interviewed in Sep 2021. There was 1 interview round.
posted on 17 Oct 2021
I applied via Walk-in and was interviewed in Sep 2021. There was 1 interview round.
posted on 11 Dec 2024
I applied via Referral and was interviewed in Nov 2024. There was 1 interview round.
Assistant Manager
6
salaries
| ₹3 L/yr - ₹5 L/yr |
Deputy Manager Marketing
6
salaries
| ₹4.2 L/yr - ₹6.1 L/yr |
Mechanical Engg. Design
5
salaries
| ₹5 L/yr - ₹6 L/yr |
Executive
5
salaries
| ₹1.5 L/yr - ₹2 L/yr |
Assistant General Manager Marketing
4
salaries
| ₹9 L/yr - ₹14 L/yr |
Asian Paints
Berger Paints
Pidilite Industries
Grasim Industries