Round 1 - Coding Test 

Great knowledge on c

Round 2 - Technical 

(2 Questions)

  • Q1. What is H bridge
  • Ans. 

    An H bridge is an electronic circuit that enables a voltage to be applied across a load in either direction.

    • Consists of four switching elements (transistors or MOSFETs)

    • Allows bidirectional control of a load

    • Commonly used in motor control applications

    • Can be used to control the direction of DC motors

  • Answered by AI
  • Q2. What is a transformer in an appliance
  • Ans. 

    A transformer in an appliance is a device that converts high voltage electricity to lower voltage for safe use.

    • Transformers consist of primary and secondary coils of wire wrapped around a core

    • They work on the principle of electromagnetic induction

    • Examples include transformers in power adapters for electronic devices

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Great company moderate interview

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Education related Questions Asked

Round 3 - One-on-one 

(4 Questions)

  • Q1. How many types of gates? ,And its truth tables
  • Ans. 

    There are seven basic types of logic gates: AND, OR, NOT, NAND, NOR, XOR, and XNOR.

    • AND gate: output is high only if all inputs are high

    • OR gate: output is high if any input is high

    • NOT gate: output is the inverse of the input

    • NAND gate: output is low only if all inputs are high

    • NOR gate: output is low if any input is high

    • XOR gate: output is high if inputs are different

    • XNOR gate: output is high if inputs are the same

  • Answered by AI
  • Q2. Electronic and Electrical related types questions
  • Q3. About to himself?
  • Q4. Questions paper

Interview Preparation Tips

Interview preparation tips for other job seekers - Very hard interview
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. About injection molding

I applied via Naukri.com and was interviewed in Aug 2022. There was 1 interview round.

Round 1 - One-on-one 

(9 Questions)

  • Q1. What's is oee calculation
  • Ans. 

    OEE calculation is a measure of manufacturing productivity that combines availability, performance, and quality.

    • OEE stands for Overall Equipment Efficiency.

    • It is calculated by multiplying availability, performance, and quality percentages.

    • Availability measures the actual production time compared to the planned production time.

    • Performance measures the actual production rate compared to the ideal production rate.

    • Quality ...

  • Answered by AI
  • Q2. What's is torque and force
  • Ans. 

    Torque is a rotational force that causes an object to rotate, while force is a push or pull that causes an object to move or change shape.

    • Torque is the product of force and the distance from the axis of rotation.

    • Torque is measured in units of force multiplied by distance, such as Newton-meters or foot-pounds.

    • Force is a vector quantity that has both magnitude and direction.

    • Force can be applied in various ways, such as p...

  • Answered by AI
  • Q3. What's is group kaizen
  • Ans. 

    Group kaizen is a continuous improvement approach that involves a team of employees working together to identify and implement process improvements.

    • Group kaizen is a collaborative approach to problem-solving and process improvement.

    • It involves a team of employees from different departments or areas of expertise.

    • The team works together to identify areas for improvement and develop solutions.

    • Group kaizen encourages emplo...

  • Answered by AI
  • Q4. What's is Poka-yoke and capa
  • Ans. 

    Poka-yoke is a technique used in manufacturing to prevent errors, while CAPA stands for Corrective and Preventive Action.

    • Poka-yoke is a Japanese term that means 'mistake-proofing' or 'error-proofing'.

    • It involves designing processes or systems in a way that prevents mistakes or errors from occurring.

    • Poka-yoke techniques can include using physical devices, visual cues, or alarms to prevent errors.

    • For example, a car manuf...

  • Answered by AI
  • Q5. What is Minor stoppage kaizen
  • Ans. 

    Minor stoppage kaizen is a continuous improvement technique aimed at reducing small interruptions in production processes.

    • Minor stoppage kaizen focuses on identifying and eliminating minor stoppages or interruptions in production processes.

    • It involves analyzing the root causes of these stoppages and implementing countermeasures to prevent their recurrence.

    • Examples of minor stoppages include equipment jams, material sho...

  • Answered by AI
  • Q6. What is tpm and tpm piller
  • Ans. 

    TPM stands for Total Productive Maintenance. It is a systematic approach to equipment maintenance that aims to maximize productivity and minimize downtime.

    • TPM focuses on proactive and preventive maintenance to improve equipment reliability.

    • It involves the participation of all employees in the maintenance process.

    • TPM pillars are the key principles or areas of focus in implementing TPM.

    • There are typically 8 TPM pillars, ...

  • Answered by AI
  • Q7. What is 5s and and jh and poka yoke
  • Ans. 

    5S is a workplace organization method that improves efficiency and safety. JH stands for Job Hazard Analysis. Poka Yoke is a mistake-proofing technique.

    • 5S is a systematic approach to organizing and maintaining a clean, safe, and efficient workplace.

    • It involves five steps: Sort, Set in Order, Shine, Standardize, and Sustain.

    • JH, or Job Hazard Analysis, is a process of identifying and evaluating potential hazards in a job...

  • Answered by AI
  • Q8. What is manpower handling
  • Ans. 

    Manpower handling refers to the management and coordination of human resources in a production environment.

    • It involves assigning tasks and responsibilities to workers

    • Monitoring and evaluating their performance

    • Providing training and development opportunities

    • Ensuring a safe and productive work environment

    • Managing work schedules and shifts

    • Addressing employee concerns and grievances

    • Optimizing workforce efficiency and produ...

  • Answered by AI
  • Q9. What is rejection handling
  • Ans. 

    Rejection handling is the process of managing and addressing rejected or failed products or components in production.

    • Rejection handling involves identifying and analyzing the reasons for rejection.

    • It includes implementing corrective actions to prevent future rejections.

    • Rejection handling may involve reworking or repairing rejected products.

    • It also includes documenting and reporting rejection data for analysis and impro...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge company profile and his department In present working

Skills evaluated in this interview

I applied via Walk-in and was interviewed in Sep 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Tell me about your self

Interview Preparation Tips

Interview preparation tips for other job seekers - Proper communication and written proper skill Excel
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is the MCCB
  • Ans. 

    MCCB stands for Molded Case Circuit Breaker, a type of electrical protection device.

    • MCCBs are used to protect electrical circuits from overloads and short circuits.

    • They have adjustable trip settings for different levels of protection.

    • Commonly used in industrial and commercial applications.

    • Examples include Siemens, Schneider Electric, and ABB MCCBs.

  • Answered by AI
  • Q2. What is the Panel size
  • Ans. 

    The panel size refers to the dimensions of the control panel used in the production process.

    • Panel size can vary depending on the specific equipment and machinery being used.

    • Common panel sizes include 24x24 inches, 36x36 inches, and 48x48 inches.

    • Panel size is important for determining the layout and placement of components within the control panel.

    • Panel size may also impact the overall footprint of the production equipm

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Feb 2024.

Round 1 - Technical 

(4 Questions)

  • Q1. Machine parameters and instruments and products process, material
  • Q2. Reduce cycle time and setup time suggestion
  • Q3. Cutting tool specification and drill tap.
  • Q4. Threading knurling grooving pramater deep

I applied via Naukri.com and was interviewed in Aug 2022. There was 1 interview round.

Round 1 - One-on-one 

(9 Questions)

  • Q1. What's is oee calculation
  • Ans. 

    OEE calculation is a measure of manufacturing productivity that combines availability, performance, and quality.

    • OEE stands for Overall Equipment Efficiency.

    • It is calculated by multiplying availability, performance, and quality percentages.

    • Availability measures the actual production time compared to the planned production time.

    • Performance measures the actual production rate compared to the ideal production rate.

    • Quality ...

  • Answered by AI
  • Q2. What's is torque and force
  • Ans. 

    Torque is a rotational force that causes an object to rotate, while force is a push or pull that causes an object to move or change shape.

    • Torque is the product of force and the distance from the axis of rotation.

    • Torque is measured in units of force multiplied by distance, such as Newton-meters or foot-pounds.

    • Force is a vector quantity that has both magnitude and direction.

    • Force can be applied in various ways, such as p...

  • Answered by AI
  • Q3. What's is group kaizen
  • Ans. 

    Group kaizen is a continuous improvement approach that involves a team of employees working together to identify and implement process improvements.

    • Group kaizen is a collaborative approach to problem-solving and process improvement.

    • It involves a team of employees from different departments or areas of expertise.

    • The team works together to identify areas for improvement and develop solutions.

    • Group kaizen encourages emplo...

  • Answered by AI
  • Q4. What's is Poka-yoke and capa
  • Ans. 

    Poka-yoke is a technique used in manufacturing to prevent errors, while CAPA stands for Corrective and Preventive Action.

    • Poka-yoke is a Japanese term that means 'mistake-proofing' or 'error-proofing'.

    • It involves designing processes or systems in a way that prevents mistakes or errors from occurring.

    • Poka-yoke techniques can include using physical devices, visual cues, or alarms to prevent errors.

    • For example, a car manuf...

  • Answered by AI
  • Q5. What is Minor stoppage kaizen
  • Ans. 

    Minor stoppage kaizen is a continuous improvement technique aimed at reducing small interruptions in production processes.

    • Minor stoppage kaizen focuses on identifying and eliminating minor stoppages or interruptions in production processes.

    • It involves analyzing the root causes of these stoppages and implementing countermeasures to prevent their recurrence.

    • Examples of minor stoppages include equipment jams, material sho...

  • Answered by AI
  • Q6. What is tpm and tpm piller
  • Ans. 

    TPM stands for Total Productive Maintenance. It is a systematic approach to equipment maintenance that aims to maximize productivity and minimize downtime.

    • TPM focuses on proactive and preventive maintenance to improve equipment reliability.

    • It involves the participation of all employees in the maintenance process.

    • TPM pillars are the key principles or areas of focus in implementing TPM.

    • There are typically 8 TPM pillars, ...

  • Answered by AI
  • Q7. What is 5s and and jh and poka yoke
  • Ans. 

    5S is a workplace organization method that improves efficiency and safety. JH stands for Job Hazard Analysis. Poka Yoke is a mistake-proofing technique.

    • 5S is a systematic approach to organizing and maintaining a clean, safe, and efficient workplace.

    • It involves five steps: Sort, Set in Order, Shine, Standardize, and Sustain.

    • JH, or Job Hazard Analysis, is a process of identifying and evaluating potential hazards in a job...

  • Answered by AI
  • Q8. What is manpower handling
  • Ans. 

    Manpower handling refers to the management and coordination of human resources in a production environment.

    • It involves assigning tasks and responsibilities to workers

    • Monitoring and evaluating their performance

    • Providing training and development opportunities

    • Ensuring a safe and productive work environment

    • Managing work schedules and shifts

    • Addressing employee concerns and grievances

    • Optimizing workforce efficiency and produ...

  • Answered by AI
  • Q9. What is rejection handling
  • Ans. 

    Rejection handling is the process of managing and addressing rejected or failed products or components in production.

    • Rejection handling involves identifying and analyzing the reasons for rejection.

    • It includes implementing corrective actions to prevent future rejections.

    • Rejection handling may involve reworking or repairing rejected products.

    • It also includes documenting and reporting rejection data for analysis and impro...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge company profile and his department In present working

Skills evaluated in this interview

I applied via Campus Placement

Interview Questionnaire 

1 Question

  • Q1. F P I REALLY where is use
  • Ans. 

    FPI (Floating Point Interpolation) is used in computer graphics to smooth out curves and edges.

    • FPI is a mathematical algorithm used to interpolate values between two points.

    • It is commonly used in computer graphics to create smooth curves and edges.

    • FPI is also used in audio processing to interpolate between samples.

    • Examples of FPI in action include anti-aliasing, texture mapping, and image resizing.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Work
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(5 Questions)

  • Q1. Personal and family
  • Q2. Education acadmic and extra activities
  • Q3. Past experience
  • Q4. Behavior and salery expectations
  • Q5. Why r u choosing this Company

Interview Preparation Tips

Topics to prepare for Amphenol Interconnect Production Engineer interview:
  • Engineering
  • mba
Interview preparation tips for other job seekers - Be prepare as per your resume.

Great White Global Interview FAQs

How many rounds are there in Great White Global Production Engineer interview?
Great White Global interview process usually has 2 rounds. The most common rounds in the Great White Global interview process are Coding Test and Technical.
What are the top questions asked in Great White Global Production Engineer interview?

Some of the top questions asked at the Great White Global Production Engineer interview -

  1. What is a transformer in an applia...read more
  2. What is H bri...read more

Tell us how to improve this page.

Great White Global Production Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Great White Global Production Engineer Salary
based on 7 salaries
₹3 L/yr - ₹5.6 L/yr
15% more than the average Production Engineer Salary in India
View more details

Great White Global Production Engineer Reviews and Ratings

based on 4 reviews

3.0/5

Rating in categories

3.0

Skill development

4.4

Work-life balance

3.0

Salary

3.6

Job security

2.4

Company culture

2.5

Promotions

3.1

Work satisfaction

Explore 4 Reviews and Ratings
Sales Executive
16 salaries
unlock blur

₹3.2 L/yr - ₹4.7 L/yr

Territory Sales Manager
15 salaries
unlock blur

₹4.5 L/yr - ₹9.4 L/yr

Senior Executive
13 salaries
unlock blur

₹3.2 L/yr - ₹5.6 L/yr

Area Sales Manager
12 salaries
unlock blur

₹7 L/yr - ₹14.1 L/yr

Accounts Officer
11 salaries
unlock blur

₹2.2 L/yr - ₹5 L/yr

Explore more salaries
Compare Great White Global with

Havells

4.0
Compare

Panasonic Life Solutions India

4.0
Compare

Legrand

3.7
Compare

Schneider Electric

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview