Implementing lean manufacturing principles can help reduce cycle time and setup time.
Implementing Single Minute Exchange of Die (SMED) techniques to reduce setup time
Optimizing production flow to minimize waiting time and bottlenecks
Utilizing automation and technology to streamline processes
Training employees on efficient work practices and continuous improvement
Regularly reviewing and analyzing production data to iden
posted on 31 Oct 2023
I applied via Recruitment Consulltant and was interviewed before Oct 2022. There were 2 interview rounds.
posted on 14 Apr 2022
I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.
Line balancing is the process of optimizing workloads across a production line to improve efficiency and reduce bottlenecks.
It involves analyzing the tasks required to complete a product and assigning them to workstations in a way that minimizes idle time and maximizes throughput.
Line balancing can help reduce production costs, increase output, and improve quality.
Examples of line balancing techniques include time stud...
Manpower allocation is based on project requirements, skill sets, availability, and workload.
Manpower allocation is a crucial aspect of production engineering.
It involves identifying the required skill sets for a project.
Availability of resources is also taken into consideration.
Workload is another factor that determines manpower allocation.
The allocation process is dynamic and can change based on project progress and
posted on 16 Nov 2022
I applied via Recruitment Consulltant and was interviewed before Nov 2021. There were 2 interview rounds.
8D, 7QC tools, FMEA, and CP are problem-solving methodologies used in manufacturing.
8D is an eight-step problem-solving process used to identify, correct, and prevent problems.
7QC tools are seven basic quality control tools used to identify and solve quality problems.
FMEA is a failure mode and effects analysis used to identify and prevent potential failures.
CP is a process capability analysis used to determine if a pro...
posted on 10 May 2024
I applied via Campus Placement and was interviewed in Apr 2024. There were 2 interview rounds.
Group discussion is very friendly way ☺️
Synchronous motor runs at a constant speed while hysteresis motor has a rotor that follows the rotating magnetic field.
Synchronous motor is used in applications where constant speed is required, such as in clocks and timers.
Hysteresis motor is used in applications where precise control of speed is required, such as in record players and tape recorders.
Synchronous motor has a stator and rotor that rotate at the same spe...
PLC is a hardware device that controls industrial processes, while SCADA is a software system that monitors and controls those processes.
PLC is a programmable logic controller that controls the input/output of industrial processes.
SCADA is a supervisory control and data acquisition system that collects and analyzes data from the industrial processes.
PLC is a hardware device, while SCADA is a software system.
PLC is used...
Relays are used for low power applications while contactors are used for high power applications.
Relays are typically used in control circuits to switch low power loads such as lights and fans.
Contactors are used to switch high power loads such as motors and compressors.
Relays have a lower current rating than contactors.
Contactors have larger contacts and can handle higher currents than relays.
Relays are typically smal...
Switches are used to control the flow of current in a circuit, while relays are used to switch a circuit on or off.
Switches are manually operated, while relays are electrically operated.
Switches are used in low voltage applications, while relays are used in high voltage applications.
Switches are simple in construction, while relays are more complex.
Examples of switches include light switches and toggle switches, while ...
Switch is an electronic component used to connect or disconnect a circuit while a timer is a device used to measure time intervals.
Switch is used to turn on/off a device while timer is used to control the duration of a device's operation.
Switch is a binary device with two states (on/off) while timer can be analog or digital and can measure time in seconds, minutes, or hours.
Examples of switches include light switches, ...
based on 1 review
Rating in categories
Deputy Manager
29
salaries
| ₹7.4 L/yr - ₹15 L/yr |
Assistant Manager
22
salaries
| ₹6 L/yr - ₹12.6 L/yr |
Design Engineer
19
salaries
| ₹3 L/yr - ₹10 L/yr |
Senior Engineer
11
salaries
| ₹5.8 L/yr - ₹10 L/yr |
Manager
9
salaries
| ₹13.4 L/yr - ₹16.6 L/yr |
BHEL
GAO Tek
Amphenol Interconnect
Legrand