Synchronous motor runs at a constant speed while hysteresis motor has a rotor that follows the rotating magnetic field.
Synchronous motor is used in applications where constant speed is required, such as in clocks and timers.
Hysteresis motor is used in applications where precise control of speed is required, such as in record players and tape recorders.
Synchronous motor has a stator and rotor that rotate at the same spe...
PLC is a hardware device that controls industrial processes, while SCADA is a software system that monitors and controls those processes.
PLC is a programmable logic controller that controls the input/output of industrial processes.
SCADA is a supervisory control and data acquisition system that collects and analyzes data from the industrial processes.
PLC is a hardware device, while SCADA is a software system.
PLC is used...
Relays are used for low power applications while contactors are used for high power applications.
Relays are typically used in control circuits to switch low power loads such as lights and fans.
Contactors are used to switch high power loads such as motors and compressors.
Relays have a lower current rating than contactors.
Contactors have larger contacts and can handle higher currents than relays.
Relays are typically smal...
Switches are used to control the flow of current in a circuit, while relays are used to switch a circuit on or off.
Switches are manually operated, while relays are electrically operated.
Switches are used in low voltage applications, while relays are used in high voltage applications.
Switches are simple in construction, while relays are more complex.
Examples of switches include light switches and toggle switches, while ...
Switch is an electronic component used to connect or disconnect a circuit while a timer is a device used to measure time intervals.
Switch is used to turn on/off a device while timer is used to control the duration of a device's operation.
Switch is a binary device with two states (on/off) while timer can be analog or digital and can measure time in seconds, minutes, or hours.
Examples of switches include light switches, ...
I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.
Costing and estimation assignment for Senior Engineer position
Understand the scope of the project and gather all relevant information
Break down the project into smaller tasks and estimate the time and cost for each task
Consider factors such as materials, labor, equipment, and overhead costs
Use historical data or industry benchmarks to validate your estimates
Provide a detailed cost breakdown and justification for your e
Computer software skills
Estimation & costing related work
posted on 14 Feb 2024
I applied via Naukri.com and was interviewed before Feb 2023. There were 2 interview rounds.
posted on 23 Sep 2022
I applied via Walk-in
posted on 5 Nov 2023
I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.
Electrical testing for equipment involves verifying functionality and safety through various tests.
Perform insulation resistance tests to check for any leakage currents
Conduct continuity tests to ensure proper electrical connections
Verify voltage and current ratings are within acceptable limits
Test for proper grounding to prevent electrical hazards
Use specialized equipment like multimeters and insulation testers
Documen
Different cable types have varying current carrying capacities and methods of laying, impacting overall electrical system performance.
Different cable types such as PVC, XLPE, and rubber have different current carrying capacities.
Current carrying capacity is influenced by factors like conductor size, insulation material, and ambient temperature.
Methods of laying cables include direct burial, conduit installation, and ov...
I applied via Recruitment Consulltant and was interviewed before Apr 2023. There were 2 interview rounds.
posted on 30 Nov 2024
I appeared for an interview before Nov 2023, where I was asked the following questions.
Experienced Senior Engineer with a strong background in software development, project management, and team leadership.
Over 10 years of experience in software engineering, specializing in full-stack development.
Led a team of 5 engineers in developing a scalable e-commerce platform that increased sales by 30%.
Proficient in multiple programming languages including Java, Python, and JavaScript.
Implemented Agile methodologi...
Led engineering projects, collaborated with cross-functional teams, and ensured timely delivery of high-quality software solutions.
Managed a team of 5 engineers, overseeing project timelines and deliverables.
Designed and implemented scalable software architectures, improving system performance by 30%.
Collaborated with product managers to define project requirements and prioritize features.
Conducted code reviews and men...
I employ a structured approach, combining analytical thinking, collaboration, and iterative testing to solve complex engineering problems.
Define the problem clearly: For instance, when faced with a performance issue, I gather metrics to understand the scope.
Break down the problem: I decompose complex issues into smaller, manageable parts, like isolating components in a system.
Use root cause analysis: I apply techniques...
based on 4 reviews
Rating in categories
Manager
274
salaries
| ₹14 L/yr - ₹35 L/yr |
Deputy Manager
247
salaries
| ₹13 L/yr - ₹32 L/yr |
Senior Manager
131
salaries
| ₹15 L/yr - ₹38 L/yr |
Graduate Apprentice Trainee
125
salaries
| ₹0.7 L/yr - ₹3 L/yr |
Senior Engineer
82
salaries
| ₹10 L/yr - ₹27 L/yr |
Havells
GAO Tek
Polycab Wires
CG Power and Industrial Solutions