Filter interviews by
I applied via campus placement at National Power Training Institute (NPTI) and was interviewed before Jun 2022. There were 3 interview rounds.
Technical Related Question Mcqs
Top trending discussions
Nitrogen gas is used in accumulators due to its inert properties and ability to maintain pressure for extended periods of time.
Nitrogen gas is inert, meaning it does not react with other substances, making it ideal for maintaining pressure without causing corrosion or contamination.
It is also non-flammable, which reduces the risk of fire hazards in accumulator systems.
Nitrogen gas has a stable temperature range, allowi...
Accumulator is used in WTG to store excess energy generated by the wind turbine for later use.
Accumulator helps in smoothing out the power output from the wind turbine.
It allows for energy storage when the demand is low and release of stored energy when the demand is high.
Accumulators can also help in providing backup power during periods of low wind.
Examples of accumulators used in WTG include batteries, flywheels, an
To improve Performance Ratio, focus on optimizing system efficiency, reducing losses, and maximizing output.
Optimize system design and operation to increase efficiency
Reduce losses through better maintenance and monitoring
Maximize output by utilizing advanced technologies and techniques
Capacity utilization factor is a measure of how much of a system's capacity is being utilized.
Capacity utilization factor is calculated by dividing the actual output by the maximum possible output.
It is often expressed as a percentage.
A high capacity utilization factor indicates efficient use of resources, while a low factor may suggest underutilization or inefficiency.
For example, if a factory has a maximum output of ...
GHI stands for Gross Heating Input, GTI stands for Gross Thermal Efficiency, and GPR stands for Gross Production Rate.
GHI is a measure of the total heat input to a system or appliance.
GTI is a measure of the efficiency of converting input energy into useful output energy.
GPR is a measure of the rate at which a system or appliance produces a certain output.
Improving plant PR involves enhancing communication, community engagement, and sustainability efforts.
Enhance communication with stakeholders through regular updates and transparent information sharing.
Engage with the local community through events, workshops, and outreach programs to build positive relationships.
Implement sustainable practices and showcase environmental initiatives to improve public perception.
Utilize...
I applied via Campus Placement
My goal is to contribute my engineering skills and expertise to help the company achieve its objectives and drive innovation.
To actively participate in the development of new products and technologies
To collaborate with cross-functional teams to solve complex engineering problems
To continuously improve processes and optimize efficiency
To mentor and guide junior engineers to foster a culture of learning and growth
To sta...
I am currently working on designing and implementing a new software system for a manufacturing company.
Designing and implementing a new software system
Working closely with the manufacturing team to understand their requirements
Writing code and conducting tests to ensure the system functions properly
Collaborating with other engineers to integrate the software with existing systems
Providing technical support and troubles
My expectation is to work in a challenging and innovative environment where I can utilize my engineering skills to contribute to the success of the company.
To work on cutting-edge technologies
To have opportunities for professional growth and development
To be part of a collaborative and diverse team
To have a work-life balance
To be recognized and rewarded for my contributions
Yes, I am comfortable working in night hours.
I have prior experience working night shifts and have adapted to the schedule.
I understand the importance of round-the-clock support in engineering roles.
I am flexible and can adjust my sleep patterns accordingly.
I am aware of the potential challenges of working at night and have strategies to stay alert and focused.
I am committed to meeting project deadlines and delivering ...
I applied via Walk-in and was interviewed in Feb 2021. There were 3 interview rounds.
To troubleshoot inverters, SCBs, transformers, and breakers, follow these pointers:
Check for loose connections and wiring
Inspect for physical damage or wear and tear
Use a multimeter to test voltage and current
Check for proper grounding
Refer to manufacturer's manual for specific troubleshooting steps
I applied via LinkedIn and was interviewed before Apr 2020. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Mar 2024. There was 1 interview round.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Senior Engineer
26
salaries
| ₹3.8 L/yr - ₹5.1 L/yr |
Assistant Manager
24
salaries
| ₹5 L/yr - ₹8 L/yr |
Senior Manager
23
salaries
| ₹6.5 L/yr - ₹15 L/yr |
Deputy Manager
18
salaries
| ₹5.5 L/yr - ₹9.6 L/yr |
Electrical Engineer
17
salaries
| ₹1.7 L/yr - ₹5.4 L/yr |
JSW Steel
Tata Steel
Steel Authority Of India
ArcelorMittal Nippon Steel