Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Sep 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Only information gathered
Round 3 - Technical 

(3 Questions)

  • Q1. Various Road pavement layers
  • Ans. 

    Road pavement layers include subgrade, subbase, base, and surface layers.

    • Subgrade is the native soil underneath the road.

    • Subbase is a layer of gravel or crushed stone placed on top of the subgrade.

    • Base is a layer of asphalt concrete or concrete placed on top of the subbase.

    • Surface layer is the top layer of asphalt or concrete that vehicles drive on.

  • Answered by AI
  • Q2. Sewer Design Process
  • Q3. Civil 3D Skills
Round 4 - Case Study 

Civil 3D demonstration on Survey file for Design

Interview Preparation Tips

Topics to prepare for SgurrEnergy Infrastructure Engineer interview:
  • Civil 3D
  • Management Skills
Interview preparation tips for other job seekers - Company wanted Designer and all 95% interview was based on management related question. Frankly tell them to please ask related to design only.

Infrastructure Engineer Interview Questions asked at other Companies

Q1. What type of ticketing tool was used in your previous organization?
View answer (1)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Transformer protection

Electrical Engineer Interview Questions asked at other Companies

Q1. What is the difference between Switch gear & Circuit Breakers ?
View answer (13)

Manager Interview Questions & Answers

user image Anonymous

posted on 4 Aug 2024

Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Aug 2023. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. General screening based questions would be asked
  • Q2. The roles and responsibilities would be explained and expectations would be checked
Round 2 - Technical 

(2 Questions)

  • Q1. The questions are more specific about the department concerned relating to core technical matters
  • Q2. The question are also related to the situation based to understand the problem solving abilities
Round 3 - One-on-one 

(2 Questions)

  • Q1. These would be by the HOD and would be relate to the understanding of how the candidate can be useful in the current role
  • Q2. The questions would be more related to how the candidate uses his/her knowledge base to answer the questions.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be true to your requirements and also ensure you know about the company in details.

Manager Interview Questions asked at other Companies

Q1. There is a chairman of a conglomerate. He has been on the post for 10 years, and is extremely dominating. He treats the various business heads like children, not letting them take any major decision. While the chairman has negatives, he bel... read more
View answer (2)

Interview Questions & Answers

user image Anonymous

posted on 17 Jan 2023

Interview experience
5
Excellent
Difficulty level
-
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Asking about PVSYST, what are the losses in PVsyst.
  • Q2. What are the latest trends in PV sector
  • Ans. 

    The latest trends in PV sector include bifacial modules, floating solar, and energy storage.

    • Bifacial modules are becoming more popular due to their ability to generate electricity from both sides of the panel.

    • Floating solar is gaining traction as it allows for the use of water bodies for solar power generation.

    • Energy storage is becoming increasingly important as it helps to address the intermittency of solar power.

    • Ther...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Answer about the losses, answer about the knowledge

SgurrEnergy interview questions for popular designations

 Infrastructure Engineer

 (1)

 Manager

 (1)

 Electrical Engineer

 (1)

Interview Questions & Answers

user image Anonymous

posted on 28 Nov 2021

I applied via Company Website and was interviewed in May 2021. There were 3 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. About PVSyst
  • Q2. About Solar Resource Assessment
  • Q3. About Energy Yield Assessment
  • Q4. About different types of losses in solar pv system
  • Q5. About Stringing calculation
  • Q6. About CAPEX and OPEX

Interview Preparation Tips

Interview preparation tips for other job seekers - Be honest about what skills you carry. do not fake your experience and skills. If you are really have a good experience in Solar PV industry, you will get selected. And if you have limited knowledge or less experienced person, I would suggest you to be honest during your interview.

Interview questions from similar companies

Round 1 - Technical 

(1 Question)

  • Q1. Power bi, sap, automation, dashboard development
Round 2 - HR 

(1 Question)

  • Q1. Hr questions...general information related to project. Tools and skills etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't go for this company... they changes the role after joining.. this happened with me as well as with somw other people.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Knowledge about composite blade manufacturing
  • Q2. Knowledge about cost saving initiatives

Interview Preparation Tips

Interview preparation tips for other job seekers - Soft skills are more important
Focus on safety,quality cost aspects

Assistant Manager Interview Questions & Answers

Goldi Solar user image Kripanath Vishwakarma

posted on 14 Mar 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(3 Questions)

  • Q1. Details of previous employment details
  • Q2. Salary details And educational details
  • Ans. We give personal salary structure and shared my personal educational details
  • Answered by Kripanath Vishwakarma
  • Q3. Experience related
  • Ans. We provided proper working experience in hr at the time of hr round interviews
  • Answered by Kripanath Vishwakarma
Round 2 - Technical 

(2 Questions)

  • Q1. Process related all stap basic details
  • Q2. We given all details of the process of Solar module manufacturing related
Interview experience
3
Average
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview in Apr 2024.

Round 1 - HR 

(2 Questions)

  • Q1. About work culture
  • Q2. About technical
Round 2 - Technical 

(1 Question)

  • Q1. Related to Transformer
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Not Selected

I appeared for an interview in Jul 2024.

Round 1 - Technical 

(10 Questions)

  • Q1. Can you tell me about yourself?
  • Q2. What are your responsibilities in the plant?
  • Ans. 

    As a Senior Engineer in the plant, my responsibilities include overseeing operations, managing projects, ensuring compliance with regulations, and leading a team of engineers.

    • Overseeing day-to-day operations in the plant

    • Managing projects related to plant upgrades or expansions

    • Ensuring compliance with safety and environmental regulations

    • Leading and mentoring a team of engineers

    • Troubleshooting technical issues and implem

  • Answered by AI
  • Q3. Why is tan delta testing conducted in power transformers?
  • Ans. 

    Tan delta testing is conducted in power transformers to assess the insulation condition and detect any potential faults.

    • Tan delta testing helps in evaluating the insulation quality of power transformers.

    • It can detect any potential issues such as moisture, contamination, or aging of insulation materials.

    • By measuring the tan delta value, engineers can assess the dielectric losses in the transformer.

    • Regular tan delta test...

  • Answered by AI
  • Q4. What is a vector group?
  • Ans. 

    A vector group is a method used to represent the phase relationship between the primary and secondary windings of a transformer.

    • Vector group indicates the connection of transformer windings and the phase shift between them.

    • It is represented by a combination of letters and numbers, such as Yd1, Dyn11, etc.

    • Different vector groups have different phase relationships, affecting the transformer's performance and operation.

    • Ve...

  • Answered by AI
  • Q5. What should be considered when erecting an IDT (Inverter duty Transformer)?
  • Ans. 

    Considerations when erecting an IDT (Inverter duty Transformer)

    • Ensure the transformer is designed for inverter duty applications

    • Properly size the transformer based on the inverter's output power

    • Consider the harmonic content of the inverter's output when selecting the transformer

    • Provide adequate ventilation and cooling for the transformer to handle the increased heat generated by the inverter

    • Ensure proper grounding and ...

  • Answered by AI
  • Q6. What is the star-delta connection in power transformers?
  • Ans. 

    Star-delta connection is a method used in power transformers to reduce starting current and improve efficiency.

    • Star-delta connection involves connecting the primary windings of the transformer in a star configuration during starting, and then switching to a delta configuration during normal operation.

    • This method helps in reducing the starting current drawn by the transformer, which is beneficial for the power system.

    • It...

  • Answered by AI
  • Q7. What types of conductors are used in high-tension (HT) lines, and what are their current capacities?
  • Ans. 

    High-tension (HT) lines use different types of conductors with varying current capacities.

    • Types of conductors used in HT lines include aluminum, steel, and composite materials

    • Aluminum conductors are commonly used due to their lightweight and high conductivity

    • Steel conductors are used for their strength and durability

    • Composite conductors are a newer technology that offer a balance of strength and conductivity

    • Current cap...

  • Answered by AI
  • Q8. What is the distance between poles in 33KV high tension lines?
  • Ans. 

    The distance between poles in 33KV high tension lines is typically around 50-60 meters.

    • The distance between poles in high tension lines is determined by factors such as terrain, voltage level, and local regulations.

    • In general, the distance can range from 50 to 60 meters for 33KV high tension lines.

    • This distance is important to ensure proper support and insulation of the conductors between poles.

  • Answered by AI
  • Q9. What is the process of laying LT cables?
  • Ans. 

    The process of laying LT cables involves planning, trenching, laying the cables, jointing, testing, and backfilling.

    • Plan the route and depth of the trench for laying the cables.

    • Excavate the trench to the required depth and width.

    • Lay the cables in the trench, ensuring proper alignment and support.

    • Joint the cables together using appropriate connectors.

    • Test the cables for continuity and insulation resistance.

    • Backfill the ...

  • Answered by AI
  • Q10. What is the process for attaching modules?
  • Ans. 

    The process for attaching modules involves identifying connection points, aligning the modules, securing them in place, and testing for functionality.

    • Identify connection points on both modules

    • Align the modules properly to ensure a secure fit

    • Secure the modules in place using appropriate fasteners or connectors

    • Test the functionality of the attached modules to ensure proper connection

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Why do you want to change jobs?
  • Ans. 

    Seeking new challenges and opportunities for growth in a more innovative environment.

    • Desire for new challenges and opportunities

    • Seeking growth and advancement

    • Looking for a more innovative work environment

  • Answered by AI
  • Q2. What can you share about your family?
  • Ans. 

    I come from a close-knit family of four, including my parents and younger sister.

    • My parents have always been supportive of my career choices and encouraged me to pursue my passion for engineering.

    • I have a younger sister who is currently studying computer science at university, following in my footsteps.

    • We enjoy spending quality time together, whether it's going on family vacations or simply having dinner at home.

  • Answered by AI

SgurrEnergy Interview FAQs

How many rounds are there in SgurrEnergy interview?
SgurrEnergy interview process usually has 2-3 rounds. The most common rounds in the SgurrEnergy interview process are Technical, Resume Shortlist and HR.
How to prepare for SgurrEnergy interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at SgurrEnergy. The most common topics and skills that interviewers at SgurrEnergy expect are Consulting, Project Management, CRM, EPC and Renewable Energy.
What are the top questions asked in SgurrEnergy interview?

Some of the top questions asked at the SgurrEnergy interview -

  1. What are the latest trends in PV sec...read more
  2. Various Road pavement lay...read more
  3. These would be by the HOD and would be relate to the understanding of how the c...read more

Tell us how to improve this page.

SgurrEnergy Interview Process

based on 5 interviews

Interview experience

4.4
  
Good
View more

Interview Questions from Similar Companies

UTL Solar Interview Questions
3.5
 • 44 Interviews
Senvion Interview Questions
4.0
 • 19 Interviews
Gautam Solar Interview Questions
3.9
 • 16 Interviews
LM Wind Power Interview Questions
4.0
 • 13 Interviews
Goldi Solar Interview Questions
4.0
 • 10 Interviews
View all

SgurrEnergy Reviews and Ratings

based on 41 reviews

3.8/5

Rating in categories

3.8

Skill development

3.5

Work-life balance

3.7

Salary

4.0

Job security

3.8

Company culture

3.7

Promotions

3.7

Work satisfaction

Explore 41 Reviews and Ratings
Senior Performance Analyst

Pune

3-6 Yrs

Not Disclosed

Explore more jobs
Project Engineer
12 salaries
unlock blur

₹4.2 L/yr - ₹7.5 L/yr

Associate Engineer
11 salaries
unlock blur

₹3 L/yr - ₹6 L/yr

Senior Engineer
11 salaries
unlock blur

₹4 L/yr - ₹14.5 L/yr

Senior Project Engineer
10 salaries
unlock blur

₹4.2 L/yr - ₹14 L/yr

Electrical Project Engineer
8 salaries
unlock blur

₹3 L/yr - ₹9 L/yr

Explore more salaries
Compare SgurrEnergy with

UTL Solar

3.5
Compare

Danfoss Power Solutions

4.1
Compare

LM Wind Power

4.0
Compare

Senvion

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview