Road pavement layers include subgrade, subbase, base, and surface layers.
Subgrade is the native soil underneath the road.
Subbase is a layer of gravel or crushed stone placed on top of the subgrade.
Base is a layer of asphalt concrete or concrete placed on top of the subbase.
Surface layer is the top layer of asphalt or concrete that vehicles drive on.
Civil 3D demonstration on Survey file for Design